Successful testing and validation of system modules and/or interfaces. Go-live ... Digital cameras. Bar code scanners. Any necessary network infrastructure upgrade ... – PowerPoint PPT presentation

Number of Views:82
Avg rating:3.0/5.0
Slides: 54
Provided by: pathologyl4
Category:

less

Transcript and Presenter's Notes

Title: Selection of an LIS: Pitfalls and Recommendations


1
Selection of an LIS Pitfalls and Recommendations
  • Association for Pathology Informatics (API)
    Course
  • September 9, 2007
  • Walter H. Henricks, M.D.
  • Director, Center for Pathology Informatics
  • Cleveland Clinic

2
Learning Objectives
  • Develop a structured approach to system
    evaluation
  • List key elements of an RFP or similar needs
    assessment for system selection
  • Describe important elements of contracts
  • Anticipate pitfalls in the process of evaluating
    LISs and vendors

3
Structured Approach to System Evaluation
  • RFP development and evaluation
  • Vendor/system demonstrations
  • Client reference checks
  • Contract negotiation

4
Preparatory Steps Project Team Designation
  • Composition depends on scope and objectives of
    the new system, but key point is that all
    affected groups (stakeholders) are represented
    and provide input
  • Laboratory
  • Clerical
  • Billing
  • Sales and Marketing
  • Pathologists and lab directors
  • Information technology

5
Development of Specifications and Requirements
  • Understand project scope and type of system
    contemplated
  • Define and map out elements of workflow and
    operations
  • Translate workflow elements into system
    requirements and expectations
  • Convert functional requirements into
    specification statements or yes/no questions

6
LIS Selection ProcessDue Diligence
  • RFI and RFP
  • Vendor presentation
  • Site references
  • Site visits
  • Vendor financial condition
  • Litigation search
  • Vendor personnel
  • Concurrent vendor projects
  • Vendor use of third parties
  • User group
  • Trial use
  • Contract

7
Preliminary Vendor Evaluation
  • Initial criteria
  • No./size/complexity of installations
  • Prior experience with vendor (could be a or -)
  • Hot button issues for your site based on
    reasons for project
  • CAP Today annual system review series on
    different system types based on vendor survey
  • Request for Information (RFI) questionnaire
    based on initial criteria to screen vendors

8
Structured Approach to System Evaluation
  • RFP development and evaluation
  • Vendor/system demonstrations
  • Client reference checks
  • Contract negotiation

9
Request for Proposal (RFP)
  • A document that
  • specifies an organizations requirements for
    particular products and/or services
  • invites vendors to submit bids to provide such
    products and/or services to the organization
  • outlines the conditions for the bidding process
  • Purposes (Elevitch and Aller)
  • Describe your lab and institution to the vendor
  • Obtain vendor responses to your requirements
  • Obtain complete information about a vendors
    capabilities
  • Set the rules for bidding, acceptance, and
    negotiation

10
Request for Proposal (RFP)
  • RFP asks vendor to spell out
  • if specified system capabilities are present
  • other attributes of system, e.g. hardware,
    maintenance, interfaces
  • corporate information
  • pricing
  • Major component of RFP is detailed query about
    required functionality and features
  • RFP responses become part of final contract

11
RFPs Other Points
  • Process of RFP development can be valuable
    exercise in practice, some consider RFPs
    misleading, impractical, or constrictive
  • Main value of RFP is adding structure and
    documentation to the process and ensuring that
    all information is gathered
  • RFP can be particularly useful for discerning
    red flags that may eliminate a vendor.

12
RFP Content Outline (example)
  • Management Summary
  • Functional scope of future system
  • Administrative information and instructions for
    responding
  • Core functionality questions/checklists
  • Technical architecture description
  • Interface support
  • Hardware and software support
  • Implementation services
  • Training services
  • Pricing
  • Vendor information

13
RFP I. Management Summary
  • Your goals and objectives for the system
  • Brief overview of desired functionality
  • Background about your site and the context in
    which the new system will be deployed
  • Scope of laboratory services
  • Multiple labs on single LIS
  • Statistics related to test volumes, patient
    volumes, beds, etc.

14
RFP II. Functional Scope of Future System
(optional can spell out in the specific
sections)
  • Narrative overview of elements desired or scope
    and intended uses of new system, e.g.
  • AP, CP, molecular, microbiology, BB, outreach
  • Interfaced systems (e.g. electronic medical
    record)
  • Specific constraints of your technical
    environment
  • Emphasis of most important features needed
  • Highlights of potential, specific challenges or
    considerations in your environment

15
RFP III. Administrative Information and
Instructions for Response
  • Vendor commitment and conditions for bidding
  • Confidentiality
  • Representation of fact
  • Inclusion of response in forthcoming contract
  • Selection process
  • Due dates and selection timeline
  • Basis for evaluating vendor (criteria here need
    not be all-inclusive)
  • Format for RFP response packet
  • Electronic AND printed with tabbed sections

16
RFP IV. Core Functionality Checklist
  • Choices for each item Yes/No, beta, future,
    custom
  • Opportunity for vendor to add comments
  • Potential sections and sub-sections
  • Global functions
  • Pre-analytic functions
  • Analytic functions
  • Post-analytic functions

17
LIS Functionality Checklist Global Functions
  • Test definitions
  • Worksheets/worklists
  • Specimen logs (AP)
  • Interfaces EMR, ADT, instrument, billing
  • Specimen tracking
  • Management reporting and related tools
  • QC handling
  • Data security and audit trails
  • Billing
  • Demographic data management

18
LIS Functionality Checklist Global Functions
(contd.)
  • Areas with special requirements
  • Blood bank / donor center
  • Microbiology
  • Molecular
  • Extended features SLAMs
  • Outreach program support (e.g. client-oriented
    view of data, billing, customer service)
  • Web portal
  • Digital imaging and/or document imaging
  • Voice recognition

19
LIS Functionality Checklist Pre-analytic
  • Patient identification
  • Specimen identification/accession numbers
  • Label generation and specifications
  • Phlebotomy lists
  • Test order management
  • Specimen receipt and tracking

20
LIS Functionality Checklist Analytic
  • Reflex testing
  • Rules/calculations
  • Autoverification
  • Histology protocols
  • Result entry and verification
  • Electronic signature
  • Templates and coded text/reports/comments
  • Special procedure handling (e.g. molecular, flow)
  • Cytology requirements (e.g. Pap smears)

21
LIS Functionality Checklist Post-analytic
  • Report/result distribution modalities
  • Printing batch, on-demand
  • Electronic and web-based
  • Fax
  • Report formatting
  • Amendments, corrected reports, addenda
  • Results viewing and inquiry

22
RFP V. Technical Architecture
  • Vendor recommendations for your site based on
    information that you supply
  • Ask for diagram(s) that shows system components
    and connectivity
  • Configurations and third parties for hardware,
    software, printing
  • Capacity limits
  • Security features
  • Database structure, maintenance
  • Test environment(s)

23
RFP VI.-VII. Vendor Support
  • Application Interfaces (Foreign Systems)
  • Existing interfaces types, systems, and
    versions
  • Time requirements for implementation of new
    interface
  • Hardware and software
  • Installation process
  • Ongoing support problem resolution, escalation,
    definition of service levels and vendor
    availability or response times
  • Processes for bugs, enhancements, and customs
  • Documentation
  • Vendor requirements and expectations for your site

24
RFP VIII.-IX. Implementation and Training
Services
  • Implementation
  • Project staffing
  • Project management methods
  • Time estimates for implementation phases
  • Client requirements staff, time, expertise
  • Training
  • Client resources required
  • Users and system managers
  • Documentation

25
RFP X. Itemized Components of Pricing
  • Hardware
  • Software
  • Application
  • OS, database, 3rd party
  • Interfaces
  • Implementation services
  • Training
  • Recurring maintenance fees
  • 24 hour support
  • Warranty
  • Options lease, purchase, transaction-based,
    subscription-based

26
RFP XI. Vendor Information
  • Corporate profile
  • Company staffing sales vs. technical support
    personnel
  • Research and development commitment
  • User groups / user input
  • Client references and contacts

27
Evaluating RFP Responses
  • Traditional method is numerical
  • Assign weighted value to each item based on
    importance
  • Assign score to each answer (e.g. yes3, beta2)
  • Multiply weight x score weighted score
  • Total the weighted scores for all answers
  • Choose the system/vendor with highest score
  • Numerical method may be constraining and
    misleading if used as sole or primary criterion.

28
Evaluating RFP Responses
  • Alternative method is less strictly numerical
  • Tabulate all non-yes responses by
    no/beta/future/custom for each vendor
  • Decide if any of the absent functionality is a
    deal-breaker requirement
  • Determine which of the absent features are the
    biggest negatives for your environment
  • Emphasize these in future evaluation of vendor
  • Decide which vendors negative profile is best
    suited to your site

29
Structured Approach to System Evaluation
  • RFP development and evaluation
  • Vendor/system demonstrations
  • Client reference checks
  • Contract negotiation

30
Vendor/System Demonstrations
  • Philosophy demonstration is not just a
    30-minute overview but rather a crucial
    opportunity for the vendor to show in-depth how
    features of the system will meet your business
    needs.
  • The most effective demonstrations result from
    considerable preparation on the part of the
    prospective client and the vendor.

31
Vendor Demonstrations Script
  • Develop detailed script for vendor based on
  • Your highest priority functional requirements
  • Scenarios that are challenges in your current
    environment (requires knowledge of current
    operations)
  • Items from the RFP that require clarification and
    visualization
  • Permit unstructured time for special features and
    new development
  • Ask vendor to show examples of printed materials
    related to scripted scenarios
  • Reports
  • Requisitions
  • Labels
  • Packing lists (outreach)

32
Vendor Demonstrations Preparation
  • Emphasize that only currently available
    functionality should be shown
  • If beta or future features are shown, they must
    be clearly noted as such
  • In advance, provide to vendor examples of
    (anonymized) documents you currently use such as
    different report types, forms, requisitions, and
    others that relate to the demo
  • Prepare Internet access and have backup
    capabilities for vendor demo equipment (e.g. PC,
    projector, printer, etc.)

33
Vendor Demonstrations Evaluation
  • Convert script into functionality checklist and
    comment form for those attending demo
  • Assess subjective aspects evaluate and rate
    (e.g. excellent, acceptable, poor)
  • Ease of use
  • Special features not easily covered by RFP (e.g.
    navigability)
  • User interface

34
Structured Approach to System Evaluation
  • RFP development and evaluation
  • Vendor/system demonstrations
  • Client reference checks
  • Contract negotiation

35
Client Reference Calls/Site Visits
  • Best site is one similar to you in case volume
    and test mix to you and whose implementation is
    similar to your vision
  • LIS(s) used, including versions and modules
  • AP, CP, Blood Bank /- Donor Center, Micro,
    outreach
  • Interfaces orders, results, EMR, other LISs
    confirm version numbers of interfaced systems
  • Special features imaging, web, voice, etc.

36
Client Reference Calls/Site Visits Things to
Assess
  • Satisfaction with vendor
  • Satisfaction with system
  • Interface implementation
  • Unexpected costs
  • Installation and implementation times
  • User training experience
  • Surprises unpleasant and pleasant
  • Lessons learned and things to do differently

37
Other Factors to Evaluate for Lab System Vendors
  • Vendor as partner
  • Commitment to product
  • Experience and expertise in area(s) of interest
  • Other product lines (potential competition for
    vendor resources)
  • Expertise and experience with interfaces
  • Number of staff, technical vs. marketing
  • Financial stability
  • Technology platform

38
Structured Approach to System Evaluation
  • RFP development and evaluation
  • Vendor/system demonstrations
  • Client reference checks
  • Contract negotiation

39
Contracts for Information SystemsComponents
  • Definitions, deliverables, and agreements
  • Responsibilities of vendor and client
  • Cost itemization and payment schedule (payment
    not all up front!)
  • Options for recourse and termination
  • Escrow right to obtain software code if the
    vendor becomes insolvent

40
Contract Basics
  • Definitions, deliverables, timelines, and
    agreements
  • Responsibilities of vendor and client
  • Payment milestones
  • Options for recourse and termination
  • Escrow right to obtain source code if vendor
    becomes insolvent

41
Possible Payment Milestones in LIS Contracts
  • Contract signing
  • Hardware delivery
  • Software installation
  • Successful testing and validation of system
    modules and/or interfaces
  • Go-live
  • Post go-live 60-90 days of successful function

42
Contract Sections (example)
  • Deliverables and definition of terms
  • Software license terms
  • Documentation
  • Pricing and payment terms
  • Price protection
  • Ownership
  • Confidentiality
  • Site preparation
  • Delivery and Installation
  • Acceptance terms
  • Training
  • Warranty and maintenance
  • Intellectual property rights indemnity
  • Remedies
  • Change in scope
  • Termination
  • Other general provisions

43
System Contracts Price Components
  • Hardware
  • Software
  • Licenses
  • Interfaces
  • Historical data conversion
  • Standard
  • Custom
  • Implementation services
  • Training
  • Annual support

44
System Contracts Hardware Items for Pricing
  • Database server
  • Print server
  • Fax server
  • Interface server
  • Web server
  • Image server
  • Thin client server
  • PCs
  • Networked printers
  • Barcode label printers
  • Cassette labelers
  • Digital cameras
  • Bar code scanners
  • Any necessary network infrastructure upgrade

45
System Contracts Software Licenses for Pricing
  • Application
  • per seat vs. concurrent users vs. other measure
  • Database management system
  • Thin client
  • Network/server
  • Fax software
  • Web software
  • Voice recognition software
  • Imaging software
  • Other add-ons and third party licenses
  • Annual Maintenance fees

46
System Contracts Interfaces for Pricing
  • Order entry
  • Results reporting
  • Patient management (ADT)
  • Web portal system
  • Other LISs (Ref lab)
  • Automation system
  • Analytical instruments
  • Cassette labeler
  • Voice recognition
  • Billing system(s)
  • Other systems

47
Application Service Provider (ASP) Model
  • Contractual arrangement in which a provider
    delivers a software application or suite of
    services to a client over a network, typically
    the Internet outsourcing
  • Hardware, software, security, upgrades entirely
    managed by vendor
  • Fixed subscription fees, either per transaction
    or flat rate

48
Service Level Agreement (SLA)
  • Contract that defines the technical and business
    parameters of the relationship between IT vendor
    and client (esp. ASP model)
  • Key terms
  • Responsibility extent of services provided
  • Performance system uptime and response time
  • Remediation how problems are addressed
  • Escalation process and vendor response times for
    system problems
  • Quantifiable metrics system uptime

49
Potential Pitfalls in System Contracts
  • Definition of dates as they relate to payment
    milestones and contract term When does the
    clock start?
  • Delivery Date, Acceptance Date, Live Date,
    Effective Date
  • Service Level Agreement for ASP hosting may
    require a separate agreement from your software
    agreement data center support may be a different
    organization from that providing software

50
Potential Pitfalls in System Contracts
  • License-based pricing
  • Server licenses
  • End-user licenses
  • Number of users per client site
  • Additional charges related to ASP hosting fees
  • Transaction-based pricing
  • Minimum charge
  • Definition of transaction some order/result
    types may count as more than one transaction
  • Additional fees to establish a new client site

51
Pitfalls in LIS System/Vendor Selection
  • Forgetting that an RFP also describes and
    characterizes your lab to potential vendors
  • Over-reliance on any one aspect of the RFP
    (unless a drop dead issue in your lab)
  • Failure to incorporate RFP responses into
    contract
  • Inadequate preparation for vendor demonstrations
    and client reference checks

52
Pitfalls in LIS System/Vendor Selection(cont.)
  • Making allowances (or requiring) substantial
    system customizations as a way to meet your needs
  • Overlooking potentially obscure elements of
    pricing, e.g. database licenses, third party
    software
  • Falling in love with bells and whistles at the
    expense of meat and potatoes
  • Failure to assess the vendor firm as a
    prospective partner for your organization

53
System Selection and Implementation Summary
  • RFP preparation and evaluation of vendor
    responses require commitment, effort, and time.
  • Prepare well to get the most from vendor
    demonstrations and client reference calls.
  • Recognize that many potential pitfalls lurk in
    the process, and it may be up to you to discover
    and to prevent them.
Write a Comment
User Comments (0)
About PowerShow.com