Title:

Bay Restoration Fund Implementation

Description:

Bay Restoration Fund. Senate Bill 320 (Bay Restoration Fund) will ... With priority given to failing systems in the Critical Area, up to 100% of the cost of: ... – PowerPoint PPT presentation

Number of Views:48
Avg rating:3.0/5.0
Slides: 18
Provided by: mde75
Category:

less

Transcript and Presenter's Notes

Title: Bay Restoration Fund Implementation


1
Bay Restoration FundImplementation
  • Status Report
  • January 15, 2005

2
Bay Restoration Fund
  • Senate Bill 320 (Bay Restoration Fund) will make
    it possible for Maryland to achieve 1/3 of the
    additional nutrient reductions needed to restore
    Chesapeake Bay by
  • upgrading wastewater treatment plants with
    Enhanced Nutrient Removal facilities,
  • upgrading septic systems in the Critical Area,
    and
  • implementing cover crop on agricultural land.

3
Purpose of Senate Bill 320
  • Creates two dedicated funds
  • One, financed by sewage treatment plant users, to
    upgrade Marylands wastewater treatment plants to
    achieve enhanced nutrient removal (ENR)
  • The other, financed by users of onsite sewage
    disposal systems, to upgrade septic systems and
    implement cover crop activities to reduce
    nitrogen loading to the Bay

4
Funding
  • Supported by a 2.50 per month per household
    surcharge on sewer bills
  • For commercial and industrial users, 2.50 per
    month per equivalent dwelling unit (EDU) based
    on wastewater flow
  • 30 annual fee for users of septic systems or
    holding tanks

5
Timing
  • The surcharge on sewer bills and for septic
    system users that receive a water bill begins on
    January 1, 2005.
  • Collected by the water or sewer authority
  • The surcharge for septic systems begins on
    October 1, 2005.
  • Collected by county governments

6
Revenue and Financing
  • Estimated to generate 65 million annually from
    sewage treatment plant users
  • To be used to back over 700 million in revenue
    bonds to fund the upgrade of 66 major sewage
    treatment plants
  • Estimated to generate 12.6 million from septic
    system users
  • 60 to be used for septic system upgrades, 40
    for cover crop activities

7
Sewage Treatment Plant Upgrade Priorities
  • 66 major plants discharging to Chesapeake Bay
    will be upgraded first to reduce the nitrogen
    loading to the Bay by additional 7.5 million
    pounds per year
  • Over 1/3 of the additional reduction needed for
    Maryland to meet its Bay 2000 Agreement
    commitments
  • Other facilities may be upgraded later, based on
    consideration of
  • Cost effectiveness, water quality benefit,
    readiness to proceed, and nitrogen and phosphorus
    loading

8
(No Transcript)
9
Eligible Uses of the WWTP Fund
  • Up to 100 of the costs of planning, design, and
    construction of ENR upgrades for flows up to the
    design capacity
  • Up to 5 million per year for Combined Sewer
    Overflow abatement and existing sewer
    rehabilitation (Fiscal Year 2005-2009)
  • After Fiscal Year 2009, up to 10 for ENR
    operation and maintenance costs

10
Septic System Upgrades
  • There are over 420,000 septic systems in Maryland
  • State and local agencies are developing and
    implementing an upgrade program
  • Identify the owners names and addresses
  • Establish a billing system
  • Carry out education and outreach to explain the
    program and availability of funding
  • Implement OSDS upgrades to reduce nitrogen

11
Eligible Uses of the Septic System Fund
  • With priority given to failing systems in the
    Critical Area, up to 100 of the cost of
  • upgrades of existing systems to best available
    technology for nitrogen removal
  • the cost difference between a conventional system
    and a system that uses best available technology
    for nitrogen removal
  • Implementation of the cover crop activities by
    the Maryland Department of Agriculture

12
OSDS Fund
  • Approximately 5,000,000 per year available
  • Approximately 600 700 system upgrades per year
  • Best Available Technology (BAT) for nitrogen
    removal

13
Fund Management
  • Maryland Water Quality Financing Administration
    will manage the financial and accounting aspects
    of the fund.
  • In cooperation with the Comptrollers Office, has
    worked with water and sewer billing authorities
    to establish the billing process.
  • Program status billing has been initiated.

14
Wastewater Treatment Plant Upgrades
  • Water Management Administration is managing the
    technical and administrative aspects of the fund.
  • Priority List for WWTP ENR upgrades.
  • CSO/SSO and Sewer Rehabilitation Projects.
  • Financial Assistance for ENR Operation and
    Maintenance costs.
  • Using existing procedures established for the BNR
    Program.
  • Program Status ENR upgrades are underway.

15
ENR Upgrades Full Speed Ahead
  • One facility has already been upgraded with ENR
    using previous state and federal grants (Princess
    Annes).
  • Two facilities are under construction and being
    upgraded for BNR/ENR (Easton and Celanese).
  • 7 facilities are under design for both BNR and
    ENR upgrades.
  • 27 facilities have initiated the planning for ENR.

16
Advisory Committee
  • Evaluate the cost, funding and effectiveness of
    the wastewater treatment plant upgrades
  • Recommend future changes to the restoration fee,
    if necessary
  • Consult with and advise the counties and the
    Department regarding the septic system upgrade
    program
  • Has met 4 times and submitted required report to
    the legislature January 15, 2005.

17
Challenge Identify and bill users of OSDS
  • No master inventory of OSDS users exists
  • All counties have access to the Real Property
    Data Base and have sewer service area maps that
    can be used together to identify properties with
    OSDS
  • Data accuracy varies from county to county
  • Each county must identify the best approach,
    compile the necessary data and develop its own
    billing system.
  • The Committee and the agencies are continuing to
    assist in this process between now and October,
    2005.