Total Maximum Daily Load TMDL Implementation - PowerPoint PPT Presentation

1 / 21
About This Presentation
Title:

Total Maximum Daily Load TMDL Implementation

Description:

Rain gardens. Bioretention filters. Erosion and sediment control ... Rain barrels. Residential and Urban. Rain garden at private residence in Lexington VA ... – PowerPoint PPT presentation

Number of Views:74
Avg rating:3.0/5.0
Slides: 22
Provided by: vad2
Category:

less

Transcript and Presenter's Notes

Title: Total Maximum Daily Load TMDL Implementation


1
Total Maximum Daily Load (TMDL) Implementation
Photo courtesy of Essex Co. website
Rappahannock River Basin Commission Tappahannock,
VA
May Louise Sligh VA Dept. of Conservation
and RecreationJune 18, 2008
2
The TMDL Process 3 Steps
  • TMDL study
  • TMDL implementation plan
  • Implement plan

3
(No Transcript)
4
What is a TMDL Implementation Plan?
  • TMDL study tells us what we need to do, TMDL
    implementation plan tells us how
  • Outlines actions that can be taken to meet TMDL
    allocations
  • Serves as a guide for implementation efforts

5
Why Implementation Plans?
  • Implementation Plan development is required by
    state legislation
  • Supported by federal, state and local
    organizations
  • Procedures outlined in DCR DEQ Implementation
    Plan Guidance Document

www.deq.virginia.gov/tmdl/implement
6
Implementation Plan Development
  • Implementation Plan will be done locally
  • Stakeholders will have the opportunity to
    participate in the plan development
  • Public meetings
  • Working groups
  • Steering committee

7
Integration with other Watershed Plans
  • Need to account for and acknowledge other
    planning activities within the watershed
  • Coordinate with other water quality plans
  • Watershed plans/roundtables
  • Local Comprehensive Plans
  • Water Supply Plans

8
What goes into an implementation plan?
  • Existing plans or improvement projects
  • Actions to improve water quality
  • Project timeline
  • Implementation goals
  • Implementation milestones
  • Roles and responsibilities
  • Funding opportunities

9
Best Management Practices to Address Bacteria
Agricultural
  • Riparian buffers
  • Exclusion of livestock from streams
  • Rotational grazing
  • Waste storage facilities

Photo Jeff Vanuga, NRCS (2002)
Riparian buffer adjacent to pasture
10
Best Management Practices to Address Bacteria
Residential
PhotoJulie Jenkins, Shenandoah Valley SWCD
  • Septic tank pumpout
  • Septic system repair/replacement
  • Alternative on-site septic systems
  • Pet waste programs
  • No-discharge zones

11
Best Management Practices to Address Sediment
Photo by Jeff Vanuga, NRCS (2002)
Agricultural
  • Cover crops
  • Streambank stabilization
  • Grass filter strips
  • Riparian buffers

No-till planting of corn into a cover crop of
barley
12
Best Management Practices to Address Sediment
Residential and Urban
  • Rain gardens
  • Bioretention filters
  • Erosion and sediment control
  • Riparian buffers/no-mow zones
  • Rain barrels

Rain garden at private residence in Lexington VA
13
Potential Funding Sources
  • Potential funding sources for best management
    practices identified in Implementation Plan
  • USDA Programs - CREP/EQIP
  • EPA Section 319 Funds
  • Water Quality Improvement Fund
  • State Revolving Loan Funds
  • State Cost-Share Program
  • State Tax Credits
  • National Fish Wildlife Foundation

14
The TMDL Process 3 Steps
  • TMDL study
  • TMDL implementation plan
  • Implement plan

15
What can you do in the meantime?
  • Show interest to agencies
  • (comments to both DCR/DEQ)
  • Continue BMP implementation
  • Initiate outreach activities
  • Continue stream monitoring
  • Identify funding opportunities

Photo Mike Phillips, Shenandoah Valley SWCD
16
The Challenge
  • Using funds for Implementation Plan development
    out of the General Assembly 2006-2008 TMDL
    appropriation, but can only use for funds for
    Agricultural BMPs implementation
  • We need a dedicated source of state funds for
    implementation planning

17
The Commonwealth of Virginia has established
criteria to rank TMDLs for implementation plan
development based on
  • Location and Resource Priorities
  • Reasonableness of Obtaining Load Allocations
  • Implementation Support strong local interest
  • In future, see less for bacteria and more for
    sediment TMDLs

18

Currently,DCR has completed 19 IPs, including
47 impaired stream segments
  • Roanoke (4)
  • Shenandoah (4)
  • James (3)
  • New (3)
  • 3 under development now Bluestone River, Mossy
    Creek and tribs, Upper Hazel River
  • DEQ has prepared 14 plans
  • DCR and DEQ have done 2 together
  • Tennessee Big Sandy (2)
  • Potomac (1)
  • Rappahannock (1)
  • Chesapeake Bay Coastal (1)

19
DEQs 2008 Assessment Database GIS Application
  • Contains 305(b) water quality data assessment
    information
  • View impaired streams, estuaries, reservoirs
  • Zoom into an area to retrieve data
  • Contains historical data on dischargers,
    monitoring stations
  • www.deq.virginia.gov/wqa/adbims2008

20
One last point to remember
TMDLs and IPs are a mechanism for restoring
water quality and are an opportunity for diverse
groups of people to come together to improve
watershed health
21
Contact Information
Photo courtesy of DCR-CBLA website
  • May Louise Sligh, VA Dept. of Conservation and
    Recreation
  • Email may.sligh_at_dcr.virginia.gov
  • Phone 804-443-1494
Write a Comment
User Comments (0)
About PowerShow.com