OPS and Licensing Update - PowerPoint PPT Presentation

1 / 23
About This Presentation
Title:

OPS and Licensing Update

Description:

Continuing Airworthiness Requirements. Annex II (Part-145): Maintenance ... Regulation (EC) 1702/2003 on Airworthiness and Environmental Certification ... – PowerPoint PPT presentation

Number of Views:137
Avg rating:3.0/5.0
Slides: 24
Provided by: FSC191
Category:

less

Transcript and Presenter's Notes

Title: OPS and Licensing Update


1
OPS and Licensing Update
  • Fergus Woods
  • European Aviation Safety Agency

2
Contents
  • EU-OPS
  • JAA Transition to EASA
  • Extension of Scope of EASA Basic Regulation

3
EU-OPS
  • Council Regulation (EEC) No 3922/91 on the
    harmonisation of technical requirements and
    administrative procedures in the field of civil
    aviation, Annex III, as amended by
  • Regulation (EC) No 1899/2006 of the European
    Parliament and of the Council of 12 December 2006
  • Entry into force 16 January 2007
  • 18 months transition
  • Applies from 16 July 2008

4
EU-OPS
  • EC Regulation
  • general measure that is binding in all its parts
  • addressed to everyone
  • directly applicable in all the Member States

5
EU-OPS
  • Equivalent to JAR-OPS 1 Amd. 8 amended Subparts
    O (Cabin Crew) and Q (FTL)
  • Updates to follow
  • JAR-OPS 1 up to Amd. 12
  • some additional NPAs as agreed by the Air Safety
    Committee
  • Comitology process to accept amendments
  • No Section 2

6
EU-OPS
  • Development of JAR-OPS 1 has stopped in EU Member
    States
  • 10 NPA considered by ASC to amend EU-OPS before
    its implementation date
  • All other (OPS-1)work transferred to EASA
    rulemaking program according to EASA rulemaking
    procedures

7
EU-OPS NPAs selected by ASC
  • NPA-OPS 39B HF
  • NPA-OPS 41 AWO
  • NPA-OPS 45 Required CC during ground ops
  • NPA-OPS 52 CC training for icing conditions
  • NPA-OPS 54 CC training on medical aspects and FAK
    training
  • NPA-OPS 58 Terminology Fuel
  • NPA-OPS 40A ETOPS
  • NPA-OPS 49 Use of Headset
  • NPA-OPS 53 Noise abatement
  • NPA-OPS 57A Elec Navigation Data Mgmt

8
JAA transition to EASA
  • Technical work for amending JARs (JAR-26,
    JAR-MMEL/MEL, JAR-STD and JAR-FCL) carried out by
    EASA rulemaking officers
  • Sectorial Teams (OST and LST) still exist,
    chaired by EASA staff supported by JAAT
  • Active rulemaking under JAA process has ceased
  • All rulemaking tasks transferred to EASA
  • Draft IR
  • EASA Inventory (future work)

9
EASA Regulatory framework the Basic Regulation
  • The Parliament and the Council define the Scope
    of Powers transferred from the Member States to
    the Community
  • They adopt the Essential Requirements specifying
    the objectives to be met

10
EASA Regulatory framework the Implementing Rules
  • The Commission adopts standards for implementing
    the essential requirements

11
EASA Regulatory framework Agency soft law
  • The Agency adopts non binding standards for
    implementing the essential requirements

12
EASA Regulatory framework
Agency Opinion
Parliament Council
Commission
Agency Opinion
EASA
Agency CS, AMC GM
13
Extension of scope
  • EASA Rulemaking
  • OPS Licensing implementing rules (IR)

14
Extension of Scope
  • The Commission adopted a legislative proposal on
    15 November 2005 COM(2005) 579 final, for the
    extension of the EASA Regulation to air
    operations, pilot licensing and third country
    aircraft, based on the Agency Opinion 3/2004.
  • The Commission proposal is being discussed by the
    European Parliament and the Council.
  • Once the legislative proposal has been adopted,
    the adoption of the implementing rules
    (Comitology) may take between 9 to 12 months
  • Transition periods likely especially for new
    requirements
  • On entry into force of the IRs (Part-OPS), EU-OPS
    will be repealed

15
Extension of Scope
  • OPS.001 Extension to Air Operations
  • FCL.001 Extension to Flight Crew Licensing
  • http//www.easa.europa.eu/home/rm_tor_en.html

16
Extension to Air Operations
  • OPS.001 subgroups CAT, Non-commercial complex
    A/C, AW, Authorities SMS
  • OPS.001 working basis EU-OPS JAR-OPS 13
    draft JAR-OPS 0, 2, 4, JAA JIPs, ICAO Annex 6,
    plus results of MDM.032 (requirements applicable
    to non-complex aircraft engaged in non-commercial
    operations)

17
Extension to Air Operations
  • Objective is to develop rules for the
    implementation of the extended Basic Regulation
    as regards to air operations. Should encompass
    requirements and related AMC/GM for
  • Operational procedures, aircraft performance,
    equipments, crews training and operational
    requirements, manuals and docs, organizational
    aspects, special operations (ETOPS, AWO, P-RNAV,
    RVSM, etc)
  • For complex and non-complex aircraft involved in
    commercial and non-commercial operations as
    applicable

18
Extension to Flight Crew Licensing
  • FCL.001 subgroups Transfer of JARs, Non-JAR
    Licences, Medical, Authorities SMS
  • FCL.001 working basis JAR-FCL 1, JAR-FCL 2,
    JAR-FCL 3, JAR-STD ICAO Annex 1 and JAA JIPs,
    plus results of MDM.032 (requirements applicable
    to non-complex aircraft engaged in non-commercial
    operations)

19
Extension to Flight Crew Licensing
  • Objective is to develop rules for the
    implementation of the extended Basic Regulation
    as regards flight crew licensing. Should
    encompass requirements and related AMC/GM for
  • The licensing, training and medical
    certification of pilots involved in commercial
    and non-commercial activities
  • For pilots of aeroplanes and helicopter (JAR-FCL
    1, 2 and 3, and JAR-STD)
  • For pilots of aircraft not included in JAR-FCL,
    such as balloons, gliders and airships (ICAO
    Annex 1 and existing national regulations).
  • For light aircraft pilots recreational
    pilots (LAPL)

20
OPS.001 FCL.001
  • Core groups to revise the inputs from the
    subgroups
  • EASA will finalise the draft IR based on the
    input from the groups
  • Other meetings scheduled to revise EASAs draft
    and deal with open issues

21
Operations, Licensing and Third Countries Aircraft
  • Calendar
  • The pace and the content of the drafting will be
    adapted to the pace and results of the
    legislative process.
  • Objective to publish an NPA immediately after
    adoption of the extension of the scope
  • IRs adopted within the following 12 months (2009)

22
Summary
  • EU-OPS applies from 16 July 2008
  • Member States must implement EU-OPS for operators
    involved in commercial air transport
  • EASA is acting on behalf of JAA during transition
  • Legislative process for extension of scope of
    EASA Basic Regulation
  • Adoption end 2007/early 2008
  • NPA for OPS FCL published immediately after
  • Full consultation subsequent Comitology before
    adoption of IRs - 2009

23
  • Thank you
  • for your attention
  • Contact details
  • Fergus Woods
  • EASA
  • fergus.woods_at_easa.europa.eu
Write a Comment
User Comments (0)
About PowerShow.com