Title: Risk Assessment: Riskit Analysis Graph
1Risk Assessment Riskit Analysis Graph
- CSEM04 Risk and Opportunities of Systems Change
in Organisations - Prof. Helen M Edwards
2Overview
- Riskit Analysis Graph Background
- Riskit Analysis Graph Components
- General Examples
- Software Systems Examples
- A Riskit Analysis Graph for a Systems Change Case
Study - A student generated graph
3Riskit Analysis Graph Background
- This technique belongs to the Riskit method
- Riskit was designed to manage risk during systems
development. - However, there is nothing in it that restricts
its use to such a perspective. - Kontio, J (1997) The Riskit Method for Software
Risk Management, version 1.00, CS-TR-3782, 1997.
Computer Science Technical Reports. University of
Maryland. - Available from http//www.soberit.hut.fi/jkontio/
riskittr.pdf
4Risk Analysis Graph
(example from the Riskit Manual)
5Riskit Analysis Graph Components
6General Example of Riskit Analysis Graph
Components
- Risk Factor a high cholesterol diet
- Risk Event a doctor's diagnosis of a patients
heart problem - Risk Outcome a diagnosed heart disease exists
- Risk Reaction treatment of heart problem
- Risk Effect hospital stay
- Utility Loss loss of time, expenses in this
case emotional upset and disruption to normal
life.
net effect of pain felt by individuals
SWAP TO RAG EXAMPLE SLIDES
7General Example of Riskit Analysis Graph
Components
- Risk Factor living near a fault line of earth's
plates - Risk Event an earthquake
- Risk Outcome some buildings/roads destroyed
- Risk Reaction reconstruction of infrastructure
- Risk Effect cost of reconstruction
- Utility Loss loss of time, expenses
- for one individual minimal - since personal
losses low and covered by insurance, - for another catastrophic - since home destroyed
and without insurance.
net effect of pain felt by individuals
8Software Systems Example
- Risk Factor inexperience of personnel
- Risk Event a system crashes
- Risk Outcome system out of operation for up to 8
hours - Risk Reaction systems operational after delay,
back up data restored - Risk Effect added cost
- Utility Loss perceived harm experienced by
stakeholders in this case minimal
since only small data entry per day and
data backed up daily
9Software Systems Example
- Risk Factor use of new development methods
- Risk Event key personnel leave
- Risk Outcome personnel and competence
shortage - Risk Reaction recruiting initiated, staff
reassigned - Risk Effect two month delay
- Utility Loss perceived harm experienced by
stakeholders in this case
catastrophic since software delay results in
client imposing financial penalty.
10A Riskit Analysis Graph for a
Systems Change Case
Study
Reaction
Do nothing
Reaction
Allocate more resource
Factor
Lack of staff training
11A Riskit Analysis Graph for a
Systems Change Case
Study (part 1)
12A Riskit Analysis Graph for a
Systems Change Case
Study (part 2)
13A student generated graph