Jordan Goodman - PowerPoint PPT Presentation

1 / 20
About This Presentation
Title:

Jordan Goodman

Description:

day and night. 1 /s slewing on both axis. Complemented with Sierra Negra ... Synchronous with Pan-American observatories. Alberto Carrami ana. Jordan Goodman ... – PowerPoint PPT presentation

Number of Views:86
Avg rating:3.0/5.0
Slides: 21
Provided by: gussi
Category:
Tags: goodman | jordan

less

Transcript and Presenter's Notes

Title: Jordan Goodman


1
The HAWC Site the Mexican Collaboration
  • Alberto Carramiñana
  • INAOE, Mexico

2
The HAWC site
  • The base of volcán Sierra Negra
  • latitude 18º59
  • longitude 97º18
  • altitude 4100m
  • Inside Parque Nacional Pico de Orizaba

Alberto Carramiñana
3
The Large Millimeter Telescope
Sep 2006
  • The largest single dish mm telescope - the
    largest science project in Mexico
  • INAOE/UMass project
  • 50m aperture _at_ 80-350 GHz
  • cold and high redshift universe
  • in construction since 2000
  • 3mm first light in mid 2008

Alberto Carramiñana
4
The Large Millimeter Telescope
  • Unique multiwavelength companion
  • flux level 3 mJy Hz-1/2 (1?)
  • day and night
  • 1º/s slewing on both axis
  • Complemented with Sierra Negra Consortium
    experiments
  • HAWC
  • Solar Neutron Telescope (operational)
  • 5m radio telescope Solar night
  • cosmic ray array Fluorescence
  • two (resurrected) HEGRA IACTs (already in Mexico)
  • antineutron proposal
  • Citlaltepetl muon experiment
  • geophysical and atmospheric monitors

Taurus GMC CO(1?0) SEQUIOA _at_ FCRAO 14m 96
sq.deg with 70 m/s resolution www.astro.umass.edu/
heyer/taurus.html
Common EG/WMAP
Alberto Carramiñana
5
The HAWC site easy access
Mexico DF 120 km
Veracruz 160 km
100 km
Alberto Carramiñana
6
The HAWC site excellent geographical location
  • Close to the equator ?sur 4? cos(lat) sin(?) ?
    4?(2/3)
  • - 10 more sky access than at 30º
  • - 40 overlap with HESS GP survey
  • - 90 overlap with IceCube
  • - 100 with Whipple Strip Survey and VERITAS
    Cygnus Survey
  • Crab _at_ 3º from zenith
  • Galactic center is at 48o
  • Synchronous with Pan-American observatories

Alberto Carramiñana
7
The HAWC site excellent geographical location
Alberto Carramiñana
8
The HAWC site location and topography
5610m
4582m
Alberto Carramiñana
9
HAWC in Parque Nacional Pico de Orizaba
  • Site permit granted by SEMARNAT
  • June 2007 INAOE submitted to SEMARNAT an
    Environmental Impact Declaration (EID) for HAWC
    at Sierra Negra
  • Sept 2007 permit granted for constructing pond
    and facilities (30,000 m2), water extraction
    system / with conditions and without permit for
    road and power line
  • Nov 2007 detailed road design basic
    underground power line design and cost estimate -
    will submit EID in Dec 2007/Jan 2008
  • Jan/Feb 2008 will submit modification of site
    permit for tanks and revised site layout
    including two IACTs
  • March 2008 initiate road construction (? May
    2008)

Road cost contract 280k pesos (26k USD) Power
line estimate 800k pesos (73k USD)
Alberto Carramiñana
10
The HAWC site weather
  • Six years of weather data at top of SN available
  • HAWC is mostly weather proof, but look for
    freezing conditions and severe weather
  • freezing lt 10 of the time

Alberto Carramiñana
11
The HAWC site Moderate Weather
  • Fast wind (gt25 mph) less than 5 of time
  • Occasional influence of hurricanes
  • Dean! max wind speed 90 MPH

Alberto Carramiñana
12
Water for HAWC
  • Water demands
  • HAWC tanks/3 years 0.8 l/s
  • 2M gallons/ 100 tanks
  • Water acquisition systems (by preference)
  • well _at_ 1-2 km from site
  • water trap _at_ 7 km from site
  • transport from lower wells with trucks (15km)

Alberto Carramiñana
13
Water for HAWC the well
  • Location of potential wells through topographic
    and geoelectric studies
  • advised by collaborators from Geociencias UNAM
    and UAM
  • permit granted by SEMARNAT

Alberto Carramiñana
14
Water for HAWC more options
  • Water trap
  • pump gravity
  • 7 km pipes
  • permit granted by SEMARNAT

Alberto Carramiñana
15
Site operations
  • Consorcio Sierra Negra provider of common
    services (to be adapted from La Palma)
  • electrical power supply
  • access road and maintenance
  • water and sewage
  • waste collection
  • security, first aid, fire protection
  • communications internet telephone
  • base camp
  • common visitor set up
  • Cost shared by all CSN partners according to
    experiment cost, locations, consumptions, etc...

Alberto Carramiñana
16
The Mexican collaboration
Alberto Carramiñana
17
The Mexican collaboration
Alberto Carramiñana
18
The Mexican Funding
  • CONACyT 2006 call for Ideas de Megaproyectos
  • proposals for up to 1000 Mpesos/5 years
  • 200 submitted ? 80 to phase 2
  • phase 2 no review(!?) ? research networks
  • HAWC in High Energy Physics network

Alberto Carramiñana
19
The Mexican Funding the HEP network
Alberto Carramiñana
20
The Mexican Funding beyond CONACyT networks
  • Institutional funds (to comply with minimal
    support)
  • require 367k pesos/inst/yr to reach 1.5 MUSD/5yrs
  • INAOE committed 500k/pesos per year
    (2007 100 kpesos MEGA 280 kpesos road 100
    kpesos site studies travel ...)
  • CONACyT basic science projects (Auger-like)
  • call issue on 1/12/7 (deadline 31/1/8)
  • individuals up to 1.8 Mpesos /3 years
  • groups up to 5 Mpesos /3 years
  • What about NSF - CONACyT common support?

Alberto Carramiñana
Write a Comment
User Comments (0)
About PowerShow.com