Title: Jordan Goodman
1The HAWC Site the Mexican Collaboration
- Alberto Carramiñana
- INAOE, Mexico
2The HAWC site
- The base of volcán Sierra Negra
- latitude 18º59
- longitude 97º18
- altitude 4100m
- Inside Parque Nacional Pico de Orizaba
Alberto Carramiñana
3The Large Millimeter Telescope
Sep 2006
- The largest single dish mm telescope - the
largest science project in Mexico - INAOE/UMass project
- 50m aperture _at_ 80-350 GHz
- cold and high redshift universe
- in construction since 2000
- 3mm first light in mid 2008
Alberto Carramiñana
4The Large Millimeter Telescope
- Unique multiwavelength companion
- flux level 3 mJy Hz-1/2 (1?)
- day and night
- 1º/s slewing on both axis
- Complemented with Sierra Negra Consortium
experiments - HAWC
- Solar Neutron Telescope (operational)
- 5m radio telescope Solar night
- cosmic ray array Fluorescence
- two (resurrected) HEGRA IACTs (already in Mexico)
- antineutron proposal
- Citlaltepetl muon experiment
- geophysical and atmospheric monitors
Taurus GMC CO(1?0) SEQUIOA _at_ FCRAO 14m 96
sq.deg with 70 m/s resolution www.astro.umass.edu/
heyer/taurus.html
Common EG/WMAP
Alberto Carramiñana
5The HAWC site easy access
Mexico DF 120 km
Veracruz 160 km
100 km
Alberto Carramiñana
6The HAWC site excellent geographical location
- Close to the equator ?sur 4? cos(lat) sin(?) ?
4?(2/3) - - 10 more sky access than at 30º
- - 40 overlap with HESS GP survey
- - 90 overlap with IceCube
- - 100 with Whipple Strip Survey and VERITAS
Cygnus Survey - Crab _at_ 3º from zenith
- Galactic center is at 48o
- Synchronous with Pan-American observatories
Alberto Carramiñana
7The HAWC site excellent geographical location
Alberto Carramiñana
8The HAWC site location and topography
5610m
4582m
Alberto Carramiñana
9HAWC in Parque Nacional Pico de Orizaba
- Site permit granted by SEMARNAT
- June 2007 INAOE submitted to SEMARNAT an
Environmental Impact Declaration (EID) for HAWC
at Sierra Negra - Sept 2007 permit granted for constructing pond
and facilities (30,000 m2), water extraction
system / with conditions and without permit for
road and power line - Nov 2007 detailed road design basic
underground power line design and cost estimate -
will submit EID in Dec 2007/Jan 2008 - Jan/Feb 2008 will submit modification of site
permit for tanks and revised site layout
including two IACTs - March 2008 initiate road construction (? May
2008)
Road cost contract 280k pesos (26k USD) Power
line estimate 800k pesos (73k USD)
Alberto Carramiñana
10The HAWC site weather
- Six years of weather data at top of SN available
- HAWC is mostly weather proof, but look for
freezing conditions and severe weather - freezing lt 10 of the time
Alberto Carramiñana
11The HAWC site Moderate Weather
- Fast wind (gt25 mph) less than 5 of time
- Occasional influence of hurricanes
- Dean! max wind speed 90 MPH
Alberto Carramiñana
12Water for HAWC
- Water demands
- HAWC tanks/3 years 0.8 l/s
- 2M gallons/ 100 tanks
- Water acquisition systems (by preference)
- well _at_ 1-2 km from site
- water trap _at_ 7 km from site
- transport from lower wells with trucks (15km)
Alberto Carramiñana
13Water for HAWC the well
- Location of potential wells through topographic
and geoelectric studies - advised by collaborators from Geociencias UNAM
and UAM - permit granted by SEMARNAT
Alberto Carramiñana
14Water for HAWC more options
- Water trap
- pump gravity
- 7 km pipes
- permit granted by SEMARNAT
Alberto Carramiñana
15Site operations
- Consorcio Sierra Negra provider of common
services (to be adapted from La Palma) - electrical power supply
- access road and maintenance
- water and sewage
- waste collection
- security, first aid, fire protection
- communications internet telephone
- base camp
- common visitor set up
- Cost shared by all CSN partners according to
experiment cost, locations, consumptions, etc...
Alberto Carramiñana
16The Mexican collaboration
Alberto Carramiñana
17The Mexican collaboration
Alberto Carramiñana
18The Mexican Funding
- CONACyT 2006 call for Ideas de Megaproyectos
- proposals for up to 1000 Mpesos/5 years
- 200 submitted ? 80 to phase 2
- phase 2 no review(!?) ? research networks
- HAWC in High Energy Physics network
Alberto Carramiñana
19The Mexican Funding the HEP network
Alberto Carramiñana
20The Mexican Funding beyond CONACyT networks
- Institutional funds (to comply with minimal
support) - require 367k pesos/inst/yr to reach 1.5 MUSD/5yrs
- INAOE committed 500k/pesos per year
(2007 100 kpesos MEGA 280 kpesos road 100
kpesos site studies travel ...) - CONACyT basic science projects (Auger-like)
- call issue on 1/12/7 (deadline 31/1/8)
- individuals up to 1.8 Mpesos /3 years
- groups up to 5 Mpesos /3 years
- What about NSF - CONACyT common support?
Alberto Carramiñana