Opening Comments - PowerPoint PPT Presentation

1 / 8
About This Presentation
Title:

Opening Comments

Description:

UW PBL, UW Shallow Convection (Bretherton/Park, Zhu/Bretherton) ... model groups have 'frozen' their model configurations for IPCC, millenium length runs start ... – PowerPoint PPT presentation

Number of Views:47
Avg rating:3.0/5.0
Slides: 9
Provided by: cgdU
Category:

less

Transcript and Presenter's Notes

Title: Opening Comments


1
Opening Comments
Phil Rasch (NCAR)
2
How do we move forward (20 min)
  • Current Status
  • Deadlines
  • Opening up the process

3
Current Status
  • Subversion Repository exists (CAM3_2_5x?)
  • Atmosphere Physics and Dynamics match CAM3.1
  • CLM substantially modified (physics and
    interface)
  • Options for
  • UW PBL, UW Shallow Convection (Bretherton/Park,
    Zhu/Bretherton)
  • Emanuel, Kain/Fritsch
  • Dust, Sea Salt, Sulfate, BC, OC
  • MACCM, WACCM full photochemistry, aerosols
  • CAPT functionality
  • Substantial changes in software engineering
  • Bugfixes for many non-standard configurations
  • More machines supports
  • Partway to Sequential CCSM
  • Partway to non-lat/long grids, cleaner dynamics
    interfaces

4
How do we move forward ?
  • What are our main goals?
  • Bias reduction (mean and transients)
  • tropical variability (MJO, ENSO)
  • precipitation
  • Added/improved functionality (eg indirect effect)
  • Scalability on next generation machines
  • The perception of a closed shop in model
    development.
  • Where are the opportunities for improved
    collaboration?
  • Where are the barriers?

5
Framework for working together
  • Definition of model component requirements
  • By this I mean what functionality do we (not just
    AMWG) insist components have? Who provides the
    additional functionality?
  • Evaluation should take place in developmental
    version
  • What metrics do we use? (measures of
    quality/accuracy of simulation, functionality,
    computational cost, quality and flexibility of
    code?)
  • How are those metrics chosen?
  • Policy for working in the developmental version
  • Reciprocity (resources lt-gt early involvement in
    evaluation development of components)
  • Offers of co-authorship
  • Requirement of sharing code
  • Needs for subjecting new components, routinely
    and (semi-) publicly to all metrics
  • Evaluation in coupled context ASAP!

6
Timeline
June 2008, Candidate full functionality century
long coupled configurations are considered by WGs
in Plenary? Settle on most promising
configurations
Winter AMWG Workshop presentation of process
candidate?
March AMWG identify missing functionality
performance evaluation, Candidates exist
model groups have frozen their model
configurations for IPCC, millenium length runs
start
2007
2008
2009
2006
June 2006 Component Requirements Metrics for
evaluation agreed upon! Current status of model
June 2007, where do we want to be?
Sept 2008, CCSM SSC looks at multi-century runs,
last minute changes?
March AMWG
7
Useful Documents (soon to be on web page)
  • Working Papers of CMS
  • Science Objectives (CMS)
  • COURT requirements (Collins and Conley)
  • Dynamical test (Jablanowski and Williamson)
  • Things useful for development and evaluation
  • Component Module requirements (what
    functionality)
  • Comparison of physical performance
  • Comparison of computational performance

8
What have I missed? (input from audience)
Write a Comment
User Comments (0)
About PowerShow.com