Title: Earth Observation Programmes Directorate


1
Earth Observation Programmes Directorate
Soil Moisture and Ocean Salinity Explorer SMOS
  • Second Earth Explorer Opportunity Mission
  • First L-Band Interfero- metric Radiometer
    Satellite

2
Earth Observation Programmes Directorate
SMOS
  • Mission Objectives
  • Dual primary mission objectives
  • Over land, measurement of the soil moisture
    contents in the upper soil layer
  • Over ocean, measurement of sea surface salinity
  • Secondary mission objective
  • Cryosphere
  • Mission objectives are accomplished by measuring
    the L-band emissivity at dual
  • polarizations and multiple angles from 755.5 km
    polar orbit at 6 a.m. local time

3
Earth Observation Programmes Directorate
SMOS
  • System / Configuration
  • Recurrent PROTEUS satellite bus, provided by CNES
    (contribution in kind)
  • Payload developed by ESA, based upon the MIRAS
    instrument development performed under
    TRP/GSTP/EOPP
  • Recurrent Flight Operations Center from PROTEUS
  • Payload Data Segment, development funded
    nationally by Spain
  • System Engineering and Satellite AIT by Alcatel
    (PROTEUS-Prime), to be funded jointly by CNES and
    ESA

4
Earth Observation Programmes Directorate
SMOS
  • Present Status
  • Phase B Programme approved by PB-EO
  • Payload Phase B proposal under Evaluation, to
    start 1 December 02
  • Satellite Engineering Support to commence early
    2003
  • Ground Segment Phase A just kicked-off.
  • Future Planning
  • Full Programme proposal to PB-EO for approval
    mid-2003
  • Payload phase C/D to commence December 2003
  • Satellite Engineering Support to be phased
    accordingly
  • Ground Segment phases B/C/D early-2004

5
Earth Observation Programmes Directorate
SMOS
  • Industrial configuration
  • Two major contracts
  • Payload Development with CASA EADS as Prime
    Contractor
  • industrial consortium mainly driven by the
    heritage from the MIRAS development activities
  • MIER, Astrium, HUT/YLINEN, Contraves
  • Subsystems so far unassigned MGSE, Harness,
    Thermal control H/W
  • Some re-industrialization of subsystems with
    development heritage might be
  • possible, but is restricted by approx 18 M
    additional Spanish funding through
  • GSTP3.
  • System Engineering and Satellite AIT with Alcatel
    as developer of the
  • PROTEUS bus.