Facility requirements that cannot be met by use of existing facilities will be ... COMSEC Storage closets not authorized. Class V safes will be used. ... – PowerPoint PPT presentation

Number of Views:408
Avg rating:3.0/5.0
Slides: 12
Provided by: Maa6
Category:

less

Transcript and Presenter's Notes

Title: CUSTOMER EXPECTATIONS


1
CUSTOMER EXPECTATIONS Don LaRocque IMA Public
Works
2
CUSTOMER EXPECTATIONS

Speed Affordability Quality
Versatility Durability Inventiveness
3
FACILITATE THE FORCE - QUICKLY
Modularity Facility Planning Guidance (for
temporary relocatable facilities)
  • Maximum use of existing permanent facilities
    will be made to accommodate modularity facility
    requirements. Facility requirements that cannot
    be met by use of existing facilities will be met
    by use of temporary relocatable facilities.
  • Expected duration of the requirement is 6 10
    years.
  • Individual relocatable modules costing more
    than 250,000 must be purchased with OPA funds.
    Modules costing less than 250,000 may be
    purchased with OMA funds.
  • Unaccompanied Personnel Housing
  • Unaccompanied Personnel will be housed at
    current PP standard for the installation ex.
    11 _at_ Ft Stewart, (single man rooms), 22 at Ft
    Drum and Ft Campbell, etc.
  • 111 relocatable module is acceptable
    permanent party standard. (illustration shown)

4
Modularity Facility Planning Guidance (for
temporary relocatable facilities - continued)
  • Unit Operations Facilities (Co, BN, BDE
    Headquarters).
  • Unit Ops facilities will be at 50 of Army
    standard-- 5,000 sf/unit is acceptable.
  • Generic Admin and Supply/Storage modules will
    be used. This allows the most flexibility in
    setup, use, and eventual removal.
  • COMSEC Storage closets not authorized. Class V
    safes will be used.
  • The cost of Modular Arms Vaults placed in a
    Unit Ops module is additive to the cost of the
    Ops module when assessing applicability of OMA or
    OPA funds.
  • Modular Arms Vaults sited external to Unit Ops
    modules are not considered buildings unless
    provisions are made in the vault for human
    occupancy. Elsewise, they are considered storage
    containers.
  • Maintenance Facilities.
  • Each unit will be assigned maintenance bays in
    existing permanent motor pools.
  • Additional Organizational Vehicle Parking and
    relocatable maintenance shelters (Clamshells type
    facilities) may be procured to augment existing
    motor pools. Rational is to have all units at
    the same standard until the temporary mission
    ends or permanent, adequate facilities are
    constructed.

5
Modularity Facility Planning Guidance (for
temporary relocatable facilities - continued)
  • Unaccompanied Personnel Dining will be
    accommodated by longer meal service hours and
    bussing to existing Dining Facilities.
  • NEPA documentation needs to be as comprehensive
    as the Installation can define it.
  • Annual and Weekend Training will not be
    compromised.
  • Modular buildings will use Commercial grade
    materials and finishes. Examples
  • Solid core wood or steel doors. Steel door
    frames. Three hinges.
  • Walls no less than 2X4 thickness.
  • Insulating, low-e glazing.
  • Vinyl covered wallboard.
  • Vinyl tile flooring.

6
Representative photos of relocatable buildings
Admin buildings
Modular Arms vaults under pole barns
Ft Stewart
Modular 111 relocatable barracks (modules not
physically attached to each other)
Clamshell maintenance space
Motor Pool area
Ft Stewart Relocatable Barracks
Site prep and utilities
Motor Pool Admin Supply/Storage
7
Relocatable buildings arriving at Ft Campbell and
being scanned by VACIS
Representative photos of relocatable buildings
Relocatable buildings ready to be installed
Ft Campbell
WWII Wood being repaired for BCT(UA) barracks
Modular Army Vaults
Relocatable supply/storage buildings
relocatable admin buildings
Ft Drum
Site preparation - clearing, grading, utilities
8
Representative photos of relocatable buildings
Fort Stewart MEDHOLD Relocatables

16 soldiers/latrine
4 man room 270sf
4 man room 270sf
Common area
  • Each soldier has 70sf.
  • Each room houses 4 soldiers.
  • Each building houses 16 soldiers and has
    integral latrine/laundry.
  • Purchase cost for 300 pn 2.3M
  • Annual lease cost 1.9M

Laundry
Purchase cost for 1,516 soldiers would be 11.6M
4 man room 270sf
4 man room 270sf
Shower/bathroom
9
Proof of principle test Operational Readiness
Training Centers (ORTCs)
Battalion HQ
Officers Quarters
Barracks (Incl in 05 supplemental)
Dining Facility
Company Operations Facility
Battalion Equipment Maintenance Storage
Facility
Company Maintenance Sheds
10
Charrette Productsfor eventual permanent
facilities
1. Exact space use needs. I.e definition of all
occupants and all special space needs
2. Functional layout of the facility to meet the
needs of the occupants
3. Well defined site adaptation of the facility.
4. CADD rendering of the facility. (Perhaps the
most important product)
5. Updated and accurate 1391