Title: Rural, Onsite


1
Rural, Onsite Small Community Wastewater
Waste Management
  • Collection Storage Systems

2
Cost of Treatment Facilities
3
1. Avoid Long Sewer Extensions
  • Provide separate treatment facilities for each
    cluster of homes
  • Remember sewer pipe is more expensive than
    treatment plants

4
(No Transcript)
5
2. Septic Tank Effluent Sewers
  • Raw sewage - Minimum 8 inch pipe
  • Large access port
  • Septic tank effluent - about 2 inch pipe
  • Small cleanouts

6
(No Transcript)
7
Septic Tank Effluent Sewers
  • 1st used in Austrailia in 1961
  • 1st used in US in 75 and 77
  • Mt. Andrew, Alabama - 34 connections
  • Westboro, WI - 85 connections

8
Grade
  • Conventional sewers
  • Grade to maintain scouring velocity
  • Septic tank effluent sewers - no solids
  • Even short sections of reverse grade

9
Depth
  • Conventional sewers
  • 10 to 30 feet
  • Septic tank effluent sewers
  • Just below frost depth

10
Access
  • Conventional sewers
  • Large personnel access ports
  • AKA manholes
  • Septic tank effluent sewers
  • Small cleanouts

11
Septic Tank Effluent Sewers
  • Require regular septic tank pumping

12
3. Avoid Road Placement
  • Requires easements
  • Limits repaving roads
  • Reduced backfill requirements

13
4. Align with House Sewer
  • Sewage exits the house near old septic system
  • May require long connection to new sewer

14
(No Transcript)
15
5. Shallow placement
  • Water using fixtures in basement?
  • May require deep trenches for gravity flow
  • Place sewer just below frost line?
  • Pump sewage up to sewer line

16
Approaches to reducing Sewer Costs
  • 1. Avoid long sewer extensions
  • 2. Use septic tank effluent sewers
  • 3. Avoid road placement
  • 4. Alignment with house sewers
  • 5. Shallow placement

17
(No Transcript)
18
(No Transcript)
19
(No Transcript)
20
1A. Animal Environment
  • For each animal group
  • Age
  • Weight range
  • Production stage

21
Critical Housing Concerns
  • Air Quality
  • Moisture
  • Disease concerns
  • Animal cleanliness
  • Space
  • Comfort
  • Temperature
  • Other

22
For Animal Resting Area
  • Individual pen or stall
  • Animal cleanliness
  • Area is self cleaning
  • Cushioned
  • Drinking water in resting area
  • Feed in resting area
  • Other

23
Manure Accumulation Approach
  • Elevated crates
  • Sloped floor
  • Slatted floor
  • Concrete floor
  • Other

24
Frequency of Manure Removal
  • Several times a day
  • Daily
  • Every few days
  • Weekly
  • Monthly
  • Every few months
  • Annually

25
3A. Collection Features
26
2A. Collection Features, cont.
27
3A.Transfer Systems
28
3A. Transfer Systems, cont.