Title: Case Study


1
  • Case Study
  • Waste material grapple recapture with the ROV

Power generation plant Carillon General
specifications Number of generating units 
14 Installed capacity 14 x 46.75 MVA 654
MVA Depth 24 meters
Problem The Carillon power station is a
run-of-river power station. The waste material
grapple fell upstream from unit 4 after the
breaking of its steel wire rope. The use of the
ROV allowed work in simple access mode to the
installation with a short time of set-up. Only 2
units were stopped instead of 5 with the divers
method. Stoppage of more than 2 units at this
particular time would have resulted in a waste of
water.
2
ROV utilisation payback
Conclusion The use of the ROV for the recovery
of the waste material grapple of the power
station provided savings of more than 90,000 and
was a safer alternative than using divers. The
use of assisted control modes and the virtual
navigation environment made it possible to
efficiently perform the task.