Title: Industrial Stormwater General Permit Sampling Results


1
Industrial Stormwater General Permit Sampling
Results
Bill Moore P.E. Washington State Department of
Ecology
2
Industrial Stormwater General Permit Sampling
Results
  • Purpose of Sampling
  • Who Sampled
  • Sample Results
  • Next Steps

3
Purpose of Sampling
  • Tangible Evidence of Performance
  • BMP effectiveness/ Adaptive Management
  • Target Ecologys Inspection Resources
  • Permit Re-issuance

4
Who Sampled?
5
Who Sampled?
6
Sample Results
  • Considerations Caveats
  • Sample results are preliminary/unofficial
  • High apparent error rate with Zinc results
  • Learning curve - how, when, where to sample
  • Results are for samples collected April, May,
    June 2003 relatively dry quarter
  • Results are for Turbidity, Oil and Grease, pH,
    and Zinc only

7
Sample Results
Turbidity Benchmark 25 NTU
8
Sample Results
Oil Grease Benchmark 15 mg/L
9
Sample Results
pH Benchmark Range 6.0 to 9.0
10
Sample Results
Zinc Benchmark 117 µg/L
11
Sample Results - Zinc
  • Benchmark 117 µG/L
  • Sample Results Range 0.1 to 66,000 µG/L
  • Out of 394 reported values, 266 (68) were above
    the benchmark
  • 20 (5) permittees reported results greater than
    2000 µG/L

12
Next Steps - Ecology
  • Notify permittees who did not submit monitoring
    results
  • Continue to review Discharge Monitoring Reports
  • QA monitoring results received, and incorporate
    into Ecologys data management system
  • Incorporate monitoring results into Ecologys
    inspection/technical assistance efforts

13
Next Steps - Permittees
  • If you did not submit a discharge monitoring
    report last quarter
  • If you did submit a monitoring report but were
    unable to collect a sample

14
Next Steps - Permittees
  • If submitted a sample result but were above the
    benchmark values
  • Review SWPPP
  • Evaluate possible sources, source control and
    elimination
  • Additional metals sampling (copper, lead and
    hardness) if exceed zinc benchmark for two
    consecutive quarters