Case Study

1 / 8
About This Presentation
Title:

Case Study

Description:

Industrial Engineering approach to managing corporate server capacity ... New twist on old theme, relying on industrial engineering tools in operations environment ... – PowerPoint PPT presentation

Number of Views:157
Avg rating:3.0/5.0
Slides: 9
Provided by: HBSU5

less

Transcript and Presenter's Notes

Title: Case Study


1
Lecture 14
  • Case Study
  • Postgirot Bank and Provment AB

2
Case Issues
  • Industrial Engineering approach to managing
    corporate server capacity
  • Software measurement systems used to keep track
    of how various components of mainframe
    configuration are being used
  • Systems try to manage risk of over or under
    capacity
  • Case describes new methodology for applying this
    approach to servers rather than software

3
Postgirot
  • Swedish-based company providing large, cashless
    settlement system
  • Technology is core
  • Potentially for sale and has strong need to be
    seen as efficient to reduce job turnover
    post-merger
  • IT strategic in handling 1 million transactions
    per day
  • Should be at leading edge of development and
    operating practice
  • Leading-edge developer of IT with a massive
    effort to webify entire company
  • Located in very IT-friendly country
  • Must be available 24/7
  • Leading edge measurement tools is good move

4
Postgirot IT unit
  • 400 people
  • 74m budget
  • Unevenness in workflow
  • Peak hourly volumes four times average hour
  • Deeply dependent on reliability
  • Built on underground information-processing
    center to hold central computer and server farm
  • 158 staff focused primarily on development of
    capabilities to support organization
  • Cost of services historically of secondary
    concern to getting capabilities installed
  • Culture of speed and effectiveness instead
  • Stage 2 contagion company on Nolan scale
  • Substantial excess capacity discovered on servers
    with ability to cut costs around 5 without
    harming productivity

5
Provment A-B
  • Staff has had significant experience developing
    software for measuring mainframe performance in
    OS/390 environments
  • Recently expanded tool to UNIX systems servers
  • New twist on old theme, relying on industrial
    engineering tools in operations environment
  • Driving excess costs out of network without
    degrading server is key
  • Recently developed new software package to
    measure the utilization of server capacity
  • Complex CPU performance measurement system,
    internal memory utilization, I/O capacity and
    disk storage use
  • Measures for each server how many devices are
    being utilized
  • Unobtrusive, takes up less than 0.5 of CPU
    capacity
  • Package hasnt been validated in this form yet

6
Key aspects of new package
  • Intensely secure
  • Tightly controlled user system access
  • Designed to keep servers running if disabled
    (even though this is not anticipated to happen)
  • All staff for installment provided by Provment as
    a service
  • Eliminating training for Postgirot staff
  • Lowering barrier for first trial
  • Maximum time to install on all servers 60 days to
    ensure rapid access by management to results
  • All installation costs added together not more
    than cost of 4 UNIX servers

7
End results for UNIX servers
  • Discovered average workload of first 48 servers
    less than 10 during prime shift
  • Up to 40 servers could be eliminated
  • Not unexpected
  • Machine consolidations expect to save 500k in one
    time, eliminating capital investment and 1.4m
    per year (5 of IT budget)
  • Each server on full-cost basis about 3 times more
    expensive than anticipated
  • Management didnt realize cost of what they wer
    running
  • Can they generate these savings?
  • System showed high potential for NUNIX servers
    being combined
  • NT/WIN servers suggested as next step

8
Issues
  • Quality of analysis in establishing cost
    coefficients new area/idea
  • Potential misuse of Postgirot data by Provment
  • How sensitive will system be to peaks?
  • Betting important measurement function on new
    company?
  • No mention of applications, which are sensitive
    to down time and should be on reliable mainframes
  • Concern that these issues are addressed piecemeal
    than holistic
Write a Comment
User Comments (0)