Title: Joint Task Article Migration Into UJTL Proposal Brief
1Joint Task Article Migration Into UJTL Proposal
Brief
2Agenda
- Proposal
- Proposed CONOPS
- Migration of existing JTA into UJTL
- Subsequent JTA Development and Submission to UJTL
- USJFCOM Role/Responsibilities
- Joint Staff J-7 Role and Responsibilities
3Proposal
- To create one comprehensive, electronically
accessible manual the Universal Joint Task List
(UJTL) that will contain both traditionally
formatted Universal Joint Tasks (UJT) and, where
applicable, UJT that adopt the Joint Task Article
(JTA) format.
4Proposed CONOPS
- J7, USJFCOM continues developing JTA as required
- For the Initial 328 JTA that have already been
developed - USJFCOM JTA Lead will submit the initial 328 JTA
to the JS J-7 to be hung on the JDEIS Website
under JTA for Migration into the UJTL - JS J-7 tasks the UJTL Development Community with
reviewing these document and providing any
recommended changes to the JS J-7. - JS J-7 submits comprehensive list of changes to
the USJFCOM JTA Lead for action. - USJFCOM JTA Lead submits finalized JTA to JS J-7
for final staffing and approval by the DJS for
inclusion into the UJTL
5Initial 328 JTA to UJT Process
USJFCOM JTA Lead
Hang on JDEIS Website
Directs UJTL Development Community to Review
Initial JTA via JDEIS and Submit
any Recommended changes
USJFCOM JTA Lead
JS J-7
JS J-7
DJS
Inclusion in UJTL
6Proposed CONOPS
- For Subsequent JTA that have an associated UJT
- USJFCOM JTA Lead will submit the developed JTA to
the USJFCOM UJTL Coordinator as a Candidate UJT
for submission to the JS J-7 - JS J-7 will deliver the developed JTA to the
designated OPR and SML for coordination, review,
and timely completion - JS J-7 will receive the completed JTA from the
OPR/SML and process the JTA for submission into
the UJTL and final approval IAW the procedures in
CJCSM 3500.04D and CJCSI 5711.01B
7Proposed UJTL Development Process Concept
UJTL Task Development Tool (UTDT)
JTA Required?
N
Add to DRRS
Y
OPR
N
Perform Analysis/ Produce JTA
UJTL Coordinator Front End Analysis (L.O.W.,
Format, Verb usage, New Task, etc)
Y
UJSFCOM
JMETL Urgent Req?
Initial Staffing Via UTDT
SML/ SMO/ SME Analysis
N
Y
Y
UJTL Task Development
COLLABORATION
Fully Developed CR (Including JTA)
Submit to UJTL Task Development OPR for
inclusion With UJTL Task
N
OPR
OPOC/ DRRSsubmit Change Request (CR)
Y
Y
UJTL Staffing
OPOC-level Comments Resolved?
JS Telecon- Comments Resolved?
Fully Dev. CR/JTA Distributed To OPOCs via UTDT
UWP final Critical Cmt Resolution (At WJTSC)
N
N
J7
START
Note At any point in the process, a CR can be
returned to UC or OPOC for re-work or
non-concurrence
Note After this point, the task can be
changed by the process, but may still be used in
its original form in DRRS
Joint Staff Staffing
Fully Dev. CR/JTA To JS J-7 For JSAP/ Final
Comment Resolution
DJS Approve?
Update JDEIS
Y
Link to UJTL Task in JDEIS
N
8Proposed CONOPS cont.
- No Future Joint Training Requirements Analysis
Team (JTRAT) working groups - All Changes/Actions to UJTL Handled by the UTDT.
Any critical non-concurs to be discussed at the
bi-annual WJTSC. Final Coordination and
concurrence handled through the JSAP process
9USJFCOM Role/Responsibilities
- Continue Developing JTA as required
- Provide a UJTL Coordinator charged with the
administration of the UJTL process and management
of the UJTL Task Development Tool (UTDT) - Assign UJTL task hierarchy placement and conduct
a Front-End analysis on newly submitted candidate
tasks. - Coordinate with COCOMs, CSAs, Services, and
designated SMEs on developing candidate tasks,
and receiving and administrating routine changes
to the UJTL - Receive Urgent changes from Operational Points of
Contact (OPOC) and coordinate these changes - Coordinate/communicate with the JS J-7 on the
final staffing and approval process
10Joint Staff J-7 Role/Responsibilities
- Assign and promulgate an Office of Primary
Responsibility (OPR) and Subject Matter Lead
(SML) for all established UJTs and candidate
UJTs, to facilitate the assignment of Subject
Matter Experts (SME) to aid in the development
process. - Monitor the development process and provide
assistance to USJFCOM, as required, to facilitate
timely completion. - Receive routine and urgent UJTL change actions
from the USJFCOM UJTL Coordinator and process
them for Staffing and final approval IAW the
procedures outlined in the CJCSM 3500.04D and the
CJCSI 5711.01B - Coordinate/Communicate with USJFCOM UJTL
Coordinator during the staffing and approval
process in order to provide timely information on
approval status to COCOM, Services, CSA and OPOC.
Phase 2 Planning
Phase 3 Execution
Phase 4 Assessment