Title: Water Pipeline Concept


1
Water Pipeline Concept
  • Brian Jeffries
  • Executive Director
  • February 20, 2007

2
  • Project costs recovered from users
  • Mainline transmission line, one million barrel
    per day capacity
  • Disposition by either injection or delivery a
    another water body
  • Disposition of treating residue to extent
    treating required

3
Data WOGCC historical, CBM task force forecast
4
Why is WPA Exploring This?
  • Asked to do so by CBM Task Force
  • Consistent with WPA desire to foster
    infrastructure
  • Concept of multi-user system not currently being
    advanced by others
  • Attempting to settle the question of need versus
    alternative solutions

5
Where From and Where to?
6
How Have We Proceeded?
  • Very preliminary design yielded forecast capital
    and operating costs
  • Simple rate analysis using a ten year life,
    estimated costs of capital, fully subscribed
    project and estimated inflation yielded a
    ballpark ten year level rate of roughly 0.30 per
    barrel
  • Tested rate and concept with a variety of
    potential producer subscribers

7
Reactions From Producers
  • Ball park rate did not disqualify the idea
  • Raised eyebrows over estimated treating costs
  • Concern over in-service date as it relates to
    project life and attendant rate implications
  • Could attribute a regulatory certainty value to
    project

8
What Next?
  • Non-binding open season to collect quantity,
    water quality and input location data
  • Collate responses to determine a project fitting
    the demand can yield a rate close to proposed
    rates
  • If a project continues to appear feasible, fund
    more comprehensive engineering

9
After that?
  • Confirm/revise rates
  • Reconcile ownership issue
  • Conduct binding subscription period
  • Confirm or cancel project

10
Contacts
  • Wyoming Pipeline Authority
  • Brian Jeffries Executive Director
  • b57.jeffries_at_comcast.net
  • Colby Drechsel Associate Director
  • cdrechsel_at_qwest.net
Write a Comment