1 SRF Collaboration
2Overview
- Charge Does the laboratory make effective use of
collaboration and existing SRF capabilities at
other laboratories and universities? - Yes
- Fermilab has long tradition of national and
international collaboration - High Energy Physics and Accelerator
- Fermilab is one of the founding member of Tesla
Technology Collaboration - Fermilab lead an effort of national and
international SRF collaboration to support ILC in
the event of the ITRP recommendation of SRF
Technology - General principle of present collaboration
remains the same - Fermilab has developed several national and
international collaborations by bi-lateral and
multi-lateral MOUs - Development of SRF infrastructure and expertise
at FNAL
3Fermilab US Collaboration
- Jefferson Lab
- Cavity processing test, Vertical Test Stand
- ANL
- Cavity processing tech transfer to Industry,
Material RD - Cornell
- Cavity processing test, materials RD, HPR
- MSU
- Cavity RD
- SLAC
- RF power, klystrons, coupler, RF distribution
- LBNL
- LLRF
- NW,FSU, UofC
- Materials RD, innovative RD
- IIT, NIU
- Accelerator Physics
- Rochester
- Laser for NML
4Fermilab International Collaboration
- Germany DESY
- 3.9 GHz, Cryomodule Kit, SRF Infrastructure
- Italy INFN
- Tuners, Cryomodule, NML gun cathodes, HTS
- India (RRCAT,BARC,VECC,IUAC)
- Cavity and CM Design fabrication, SRF
infrastructure - Japan KEK
- Cavity RD, ATF II
- China IHEP, PKU
- Cavity and SRF development
- Russia JINR, Dubna
- Nb Joint and Cryomodule
- Canada TRIUMF
- Cavity development
- FNAL, DESY, KEK, INFN, CERN, Indian Labs
- Type IV CM design
- DESY, KEK, FNAL
- Cavity tuning machine
5Collaboration US Cavity RD
Cavity Fabrication By Industry
Plan in Place since 2006
Surface Processing _at_ Cornell
Surface Processing _at_ Jlab
Surface Processing _at_ ANL/FNAL
10/yr
40/yr
40/yr
Vertical Testing _at_ Jlab
Vertical Testing _at_ Cornell
Vertical Testing _at_ FNAL
Exists
Cavity Dressing Horizontal Testing _at_ Fermilab
Developing
6FNAL-ANL Cavity Processing Facility
- ANL/FNAL Facility provides a complete processing
of cavities - Electro-polishing, ultrasonic cleaning,
high-pressure rinse, assembly, etc. - Facility nearing completion (HPR, ultrasonic,
fixtures) - Several single-cell cavities and two 9-cell
cavity electro-polished so far - Optimization of processing procedure is in
progress
VTS
Electro-polishing Room
- High-pressure rinse system
Ultrasonic cleaning system
7FNAL (KEK/Kyoto) Optical Inspection
- KEK/Kyoto inspection system delivered, installed,
commissioned early in 2009 - KEK/Kyoto assistance in optimizing the system at
Fermilab
Accel-7 on the optical inspection stand
optical inspection optimization
Iris between cell 1-2
ACCEL06
Iris between cell 7-8
8DESY Key SRF Collaboration
- Fermilabs collaboration with DESY and Tesla
Technology Collaboration has helped make
considerable progress in Cavity and Cryomodule
RDD and SRF infrastructure development. - Fermilab SRF Infrastructures are 2nd generation
of DESY
Fermilab Designed and Build 3.9 GHz
1.3 GHz Cryomodule Assembled at Fermilab with
DESY Kit
9NML Facility
VTS RF Control
VTS
HTS
String Assembly
MP9 Clean Room
VTS
Final Assembly
Feed Can and End Can
10Indian Laboratories Fermilabs Interest
- Fermilab would like the Indian Institutions to
participate in Project-X research, design,
development and construction. - Fermilab and Indian labs are developing SRF
infrastructure. - Joint development allows sharing of resources
and advance the schedule. - Indian Institutions would develop the designs,
prototype, and fabricate different components for
the Project-X SRF accelerator. - Spoke resonator cavity and cryomodule parts (with
IUAC and BARC) - b 0.8 cavity, tuner, helium vessel, etc. (with
BARC, RRCAT and VECC) to produce a dressed cavity
and cryomodule parts - Cost optimization of cryomodule
- Indian Institutions would develop the design and
fabricate a VTS Cryostat, HTS Cryostat and CTS
Feed can and End Can for installation at Fermilab - Similar setup established at Indian Institutions
to support the above development and Indian
accelerator Program.
11Indian Laboratories Progress
12Px 325 MHz Collaboration
Fermilab, ANL, MSU, IUAC, BARC
ANL, MSU
IUAC, India
13SLAC RF Power
- RF Distribution
- Four, two-cavity RF distribution systems were
individually high power tested and then shipped
to FNAL - Additional systems will be fabricated using ARRA
funds - Coupler
- 12 Couplers from CPI have been inspected and
processed - SLAC will manage additional coupler purchase
through ARRA - Industrial value engineering
14Laboratory Industry Collaboration
- In 2005 Fermilab helped created an Industrial
Forum of North American companies to help promote
SRF accelerator technology.
http//spafoa.org/
15Summary
- We are effectively collaborating with several
institutions for the advancement of SRF RD and
infrastructure development. - Fermilab is collaborating with several
institutions nationally and internationally. - 15 US and 10 international
- Fermilab is using available SRF infrastructure at
Jlab, Cornell and joint facility at ANL for the
cavity RD. - This effective from both resources and schedule
- Fermilab leads the collaboration in cryomodule
design. - Integrated into the ILC/GDE effort
- DESY collaboration has been very effective in
enabling Fermilab become a major player in SRF
Technology. - India collaboration has strengthen in last 3 yrs.
- Beta 0.8 Cavity and CM for Project-X, SRF