Adding New Customers to the Reclaimed Water System - PowerPoint PPT Presentation

1 / 19
About This Presentation
Title:

Adding New Customers to the Reclaimed Water System

Description:

Developers and Designers. Concerned with the 'big picture' ... Landscape Designers and Installation Contractors. Only involved this tiny piece of the project. ... – PowerPoint PPT presentation

Number of Views:140
Avg rating:3.0/5.0
Slides: 20
Provided by: jfif
Category:

less

Transcript and Presenter's Notes

Title: Adding New Customers to the Reclaimed Water System


1
Adding New Customers to theReclaimed Water System
  • Jenny Fifita
  • City of Westminster

2
Problems
  • Connected without Notice of Authorization
  • The system is not built to specifications.
  • Construction doesnt comply with Regulation 84.
  • Design of the system doesnt take into
    consideration future plans for the system.

3
Tools to Get it Right!
  • Plan Review
  • Users Plan to Comply
  • Agreement of use
  • Notice of Authorization Tap Sale
  • Preconstruction Meeting
  • Inspections
  • Meter Setting

4
Plan ReviewConsider the Audience
  • Official Development Plans (ODPs)
  • Developers and Designers
  • Concerned with the big picture.
  • ODPs are recorded and enforceable long term.

5
Plan ReviewConsider the Audience
  • Landscape and Irrigation Plans
  • Landscape Designers and Installation Contractors.
  • Only involved this tiny piece of the project.
  • May not see a complete ODP or set of Civil Plans.
  • Dont count on the developer to pass along
    information. Provide the landscaper the
    information they need to build it right.
  • Keep a set for your records

6
Plan ReviewConsider the Audience
  • Technical, Civil or Construction Drawings
  • Include all the details that everybody needs to
    know.
  • Detailed drawings
  • Installation methods
  • Product requirements
  • Specifications

7
What do I look for?What do I say?
  • -Develop a set of Standard Notes that address
    problems that consistently arise
  • -Look at the plans to make sure things make
    sense.
  • -Check materials lists
  • Consider future system plans
  • -Document all communications

8
Users Plan to Comply
  • Make sure that this is complete and correct.
    Keep a copy.
  • It helps the State
  • It defends public health.
  • It reminds the contractor about the requirements
    and his responsibilities.
  • It protects you, if the contractor fails to keep
    his commitments.

9
Agreement of Use
  • An agreement defining the expectations and rules
    of interaction between the user and the treater.
    Explain how the reclaimed water system may differ
    from what they are used to.
  • Delivery
  • Application
  • Maintenance Responsibility
  • Water Quality
  • Payment
  • Resolution of Regulation 84 violations
  • Termination of Service
  • Agronomic Rate
  • Worker Education

10
Tap Sale
  • Westminster wont sell a tap or allow the
    contractor to perform work on the reclaimed
    waterline until a Notice of Authorization has
    been received.

11
Preconstruction Meeting
  • Meeting face to face and talking about the
    expectations can have more impact than notes on
    plans.
  • Developer
  • Subcontractors
  • Inspectors
  • Planners

12
Inspections
  • During construction check the exposed pipe.
  • After completion, schedule a walk through with
    the irrigation and maintenance contractor.
  • Irrigation Audit.
  • Check signs, backflow preventers and irrigation
    clocks.
  • Provide Worker Health and Safety Information and
    Regulation 84.

13
Meter Setting
  • At this point, the system is accepted. The meter
    wont be set if
  • The pipes arent purple.
  • If there isnt a backflow preventer.
  • If there is a bypass in the meter pit.
  • If there is a cross-connection
  • If anything else seems out of order.

14
Other Tools
  • GIS
  • Avaya - 41.64 Acres
  • Show Irrigated Area
  • Project Demands
  • Respond to customer issues
  • Identify the locations of meters or backflows
  • Store Contact information

15
Customer Contact Management Software
  • Track inspections for Annual Report
  • Track communications
  • Track issues and resolutions

16
Billing System
  • Track consumption
  • Could be linked to GIS
  • Good customer service tool

17
Code and Specifications
18
Recovery
19
Questions
Write a Comment
User Comments (0)
About PowerShow.com