Title: ILC R


1
ILC RD at FermilabH. Carter
  • Main Linac EDR Cavities Cryomodules
  • Participate in the development of the ML
    document sections dealing with
  • cavities and cryomodules as well as cryogenic
    systems
  • Develop cavity and CM engineering designs that
    incorporate
  • cost reduction methods
  • value engineering principles
  • design for manufacture techniques
  • Cavity QC and Tuning
  • Mechanical inspection and measurement
  • of formed half cells
  • RF measurements (bead-pull) and
  • tuning of completed cavities
  • An automated tuning machine (DESY
  • design) is planned for FY08
  • 1.3GHz Single Cell Processing
  • 12 single cell cavities being procured (6 are
  • in house at this time)
  • Processing will occur at ANL facility
  • HPR will occur at FNAL A0 facility
  • Full thermometry system to support this
  • program is under construction
  • Cavity Fabrication
  • Procure sufficient 9-cell 1.3GHz
  • cavities in FY08 (24) FY09 (48) to
  • support the ILC S0 goal of achieving
  • a reproducible gradient of 35MeV/m
  • Continue to work to develop U.S.
  • cavity fabricators
  • Explore alt. fabrication strategies

See Nandhinis Poster for Further Details
  • ACD Cavity Shapes
  • U.S. main focus on Tesla Shape
  • however two alternate designs
  • are being explored
  • Reentrant shape (Cornell)
  • Low Loss shape (JLab)
  • Cavity Horizontal Test
  • Commission and operate HTS in support
  • of dressed cavity testing for
  • 3.9GHz CM Project
  • 1.3GHz CM Program
  • RD on Cavity Processing
  • Mechanical Polish (tumbling) for bulk material
  • removal (first 120-180 microns)
  • Systematic study of EP process (S0 plan)
  • Nine cavities (3 from each region) are
    interchanged
  • and regionally processed and tested
  • Additional processing parameter studies are
  • planned in the Americas and Asian Regions
  • Cavity Failure and Improvement of
    Manufacturing Yield
  • Goal is to achieve gt90 yield in manufacturing
    and processing
  • Present world wide yield is lt50
  • Requires focused RD to study failure mechanisms
    related to
  • Raw materials
  • Manufacturing processes (Rolling, forming, EBW,
    etc.)
  • Cavity processing (BCP, EP, and HPR)

See Andy Hockers Poster for Details
2
ILC RD at FermilabH. Carter
  • SCRF Materials RD
  • Niobium Material
  • RRR measurements
  • Eddy current scanning
  • Surface profilometry
  • Microhardness testing
  • Mechanical properties (warm and cold)
  • Alternate niobium material
  • Large grain and single crystal materials
  • Formability
  • Weldability
  • Cavity HPR Systems
  • Existing A0 System for single cell 1.3GHz and
  • 9-cell 3.9GHz cavity rinsing
  • Single cell and nine-cell 1.3GHz system (based
    on
  • the Cornell HPR design) under development and
  • planned to be operational at ANL in early CY08
  • State-of-the-art system design under
    consideration
  • and planned for acquisition and installation at
  • FNAL in FY09
  • Industrial Development
  • Continued development of US. Vendors in FY08-09
  • in the areas of
  • Cavity fabrication (both single and 9-cell)
  • Helium vessel fabrication
  • Cavity processing (EP and BCP)
  • Power coupler fabrication
  • Vacuum vessel and cold mass manufacture

ILCTA_NML
CM-Related Functions -Receive cryomodule
assembly from CAF-ICB -Install cryomodule in
NML test cave -Operate cryomodule as part of
the NML test accelerator -Perform a complete
RF unit test
  • Cavity and Cryomodule Processing
  • and Testing Infrastructure
  • A next generation, pre-production processing
    facility
  • capable of 100 process cycles/year is being
    designed
  • Design and construction expected to take 2 years

Cavity Processing
  • Planned Facility Upgrades
  • FNAL
  • VTS upgrade to three test pits
  • HTS upgrade to two units, one capable of
  • simultaneous testing of two cavities or one
  • cavity plus a quad
  • In FY09 start construction of a cryomodule test
  • stand patterned after the DESY test stand
  • ANL Processing Facility
  • Addition of PLC controls to EP