Boxing Clever - PowerPoint PPT Presentation

1 / 20
About This Presentation
Title:

Boxing Clever

Description:

... a Rough Cut Capacity Plan ... Rough Cut Capacity Plan. Spreadsheet from the plan. The benefits ... a Rough Cut Capacity Planner. A 'What if' analysis tool ... – PowerPoint PPT presentation

Number of Views:95
Avg rating:3.0/5.0
Slides: 21
Provided by: jobra
Category:
Tags: boxing | clever | cut

less

Transcript and Presenter's Notes

Title: Boxing Clever


1
Boxing Clever
  • Ilmor Engineering
  • John Reid Jo Bradley

2
Introduction
  • What do we use QEI for?
  • How do we use QEI?
  • Why do we use QEI?

3
What do we use QEI for?
  • To produce a finite machine shop schedule
  • Short time scale typically 1 - 2 weeks
  • Progress work through rapidly.
  • Stability, despite frequent changes of priority
    and specification.
  • Visualise the implications of changes.
  • Effectively use machines/resources

4
What do we use QEI for?
  • To produce a Rough Cut Capacity Plan (RCCP)
  • ensure we are able to achieve the plan before
    release/commitment
  • is over a long time scale - typically 1 year.
  • identification of bottlenecks
  • used in SOP

5
What do we use QEI for?
  • To do What if Analysis
  • detailed typical schedule to identify problems
  • new projects
  • development/phase changes
  • machine moves
  • maintenance

6
How do we use QEI?
  • What where the information comes from where
    it goes in QEI
  • Routings imported from business system
    (production engineering) into Library
  • Templates from Bill of Materials - Library
  • Resources and working calendars -Library
  • Production orders and planned orders from MRP
    into the working database

7
How do we use QEI?
  • What is done with it in QEI - Finite Schedule
  • Routings
  • Resource Calendars
  • Edit Relationships
  • Create Templates
  • Colours
  • Week Numbers / Race Weekends

8
F1 Block Assembly Template
9
How do we use QEI?
  • What is done with it in QEI - Finite
  • Production orders reference Library
  • Link orders according to templates
  • Layout on a bar chart

10
(No Transcript)
11
How do we use QEI?
  • What is done with it in QEI - Finite
  • Schedule in key machines on box chart.
  • Level 3 and Level 4 Boxcharts
  • Tables and work to lists
  • Navigation of database and the users

12
(No Transcript)
13
(No Transcript)
14
Tables and work to lists
15
(No Transcript)
16
How do we use QEI?
  • What is done with it in QEI - RCCP
  • Database of typical production orders and
    profiles
  • Export top level with profile
  • Spreadsheet of the plan
  • Import top level according to plan
  • Layout on bar chart
  • Move bars to optimize profiles.

17
Rough Cut Capacity Plan
  • Spreadsheet from the plan

18
(No Transcript)
19
The benefits
  • Level of detail
  • The use of graphics
  • Accurate information
  • Flexibility of software
  • Forward view

20
Summary
  • QEI at Ilmor is used as
  • a Finite Scheduling tool
  • a Rough Cut Capacity Planner
  • A What if analysis tool for manufacture.
Write a Comment
User Comments (0)
About PowerShow.com