QUESTION 1 Which of these is not an approved
Estimate Activity Durations technique? A. Three
Point Estimating B. Parametric Estimating C.
Analogous Estimating D. Critical Path
Estimation Answer D
6PMP Questions Answers
QUESTION 2 If you are working on a project
where there is no definite project detailed
scope, but similar projects have been completed
in the past, what is the correct Estimate
Activity Durations tool to use? A. Analogous
Estimating B. Parametric Estimating C. Critical
Path Estimation D. Three Point Estimating Answer
A
7PMP Questions Answers
QUESTION 3 You have been called in to give an
executive presentation on the status of your
project. Just before you walk into the meeting,
you are informed that a critical resource for the
project is no longer available, and could result
in a substantial delay to the project. However,
you believe there may be an alternative resource
that could be used. What do you tell the
executive committee? A. Wait until you have all
facts before you advise the executive team. B.
Ask your deputy project manager to add this to
the risk database, but do not mention it to the
executive team. C. Advise the executive team of
the situation exactly as you know it to be at
that moment. D. Do not mention it to the
executive team because you know that you have
enough reserve to support a 2 month
delay. Answer C
8PMP Questions Answers
QUESTION 4 In a cause and effect diagram, which
of these is not a potential cause? A.
Personnel B. Problem statement C. Time D.
Material Answer B
9PMP Questions Answers
QUESTION 5 Which of the following is
inaccurately represented by the term Progressive
elaboration? A. Changes to project scope B.
Rolling wave planning C. Detailing out the
product requirements which were developed during
the initiation process. D. Production of
fabrication and construction drawings from the
design drawings for a chemical plant. Answer A