C9010-251 Training kit

About This Presentation
Title:

C9010-251 Training kit

Description:

Our workable study material for C9010-251 Exam meets the exact and accurate exam questions and answers. So that’s why Cert4Prep is popular in the field of IT Certification Exams material providers. For more information about exam please visit here: – PowerPoint PPT presentation

Number of Views:4

less

Transcript and Presenter's Notes

Title: C9010-251 Training kit


1
IBM
C9010-251
IBM Power Systems with POWER8 Scale-out Technical
Sales Skills V1
Product Version
For More Information Visit link below
http//www.cert4prep.com/
2
Question 1
A customer with data centers 1500 km (930 miles)
apart wants to create a solution which enables
role swaps for high availability What is the
MINIMAL PowerHA offering that will satisfy their
requirement?
A. SystemMirror Enterprise Edition B.
SystemMirror Smart Assist C. SystemMirror Entry
Edition D. SystemMirror Standard Edition
Answer A
Question 2
What POWER8 processor capability has been
enhanced, relative to POWER7/7, to enable
more efficient processor utilization in support
of some applications?
A. Out of order execution
B. Decimal floating point execution C.
Simultaneous Multi-Threading D. Single precision
floating point
Answer B
Question 3
A customer wants to deploy SAP HANA on IBM Power
Systems. Which operating system is supported?
A. Ubuntu 14 B. IBM I V7R2 C. SUSESLES 11 D. A1X
7.2
Answer C
Question 4
3
A customer is considering a purchase of a new
S812LC server to implement Maria DB. They will
not be virtualizing and require a physical
console. What is the supported console?
A. A monitor connected to the integrated VGA
port B. IVM C. HMC
D. A monitor connected to the standard PCIe
graphics adapter
Answer C
Question 5
A customer wants to run an in-memory
database. Which model will provide the highest
memory bandwidth?
A. S812LC B. S822LC C. S812L D. S822L
Answer B
Question 6
A customer anticipates having very heavy network
and storage I/O traffic across their
virtualized environment. They are interested in
segregating the I/O workloads. They also want to
be able to perform maintenance on their VIO
Servers without downtime.
Which option will satisfy their requirements?
A. Two VIO Servers one handling network and one
handling storage B. Two VIO Servers, each
handling a portion of the traffic C. Four VIO
Servers, two handling network and two handling
storage D. Four VIO Servers, each handling a
portion of the traffic
Answer C
Question 7
Which hypervisar supports two Linux virtual
machines on a Power S812LC?
4
A. PowerVC B. PowerKVM C . OPAL (Open Power
Abstraction Layer) D. Power VM
Answer C
Question 9
A customer has a SAN team that wants to be able
to easily map each LUN to a specific World Wide
Port Name (WWPN) on each client LPAR of a POWER8
server Which technology should be implemented to
satisfy the requirement?
A. SAS
B. iSCSI C. NPIV D. vSCSl
Answer C
Question 10
A customer with POWERS processor-based systems
needs an application server that
supports environment from single server and
medium-sized configurations to large deployments
requiring web tier clustering over multiple
application server instances.
Which IBM product family will satisfy the
customer's requirements?
A. Web Sphere B. Information Management C. Cognos
D. Rational
Answer A
Question 12
A client has a virtualized Power Systems
environment and has the following requirements .
Support for AIX IBM I, Linux partitions . Easy to
replicate virtual machines . Policy based
workload placement Which of the following will
best satisfy the requirements to manage the
environment?
5
A. HMC B. Power VC C. Power VM D. Cloud Manager
with Open Stack
Answer C
Question 13
A client is deploying an HPC workload on a
cluster of S822LC systems with GPUs. Which of the
following is a supported operating system for the
environment?
A. RHEL6 B. AIX7 1 C. Ubuntu 14 D. SLES 11
Answer D
Question 14
Which of the following Power Scale-Out operating
systems includes integrated database
and middleware components?
A. AIX
B. SUSE C. Ubuntu D. IBMi
Answer D
Question 15
A customer will be migrating from a POWER6 server
to a POWER8 server Which of the following
statements is an advantage of SR-IOV compared to
Integrated Virtual
A. Provides logical ports to LPARs for Ethernet
connectivity B. Can be configured without
VIOS. C. Provides quality of service
D. Supports 1Gbps and 10Gbps Ethernet feature
6
Answer D
7
For More Information Visit link
below http//www.cert4prep.com/
Thanks for Using Our Product
FEATURES
? 100 Pass Guarantee
? 30 DaysMoney Back Guarantee ? 24/7 Live Chat
Support(Technical Sales) ? Instant Download or
Email Attachment ? 50,000 ve Reviews
? 100 Success Rate
? Discounts Available for Bulk Orders
We Accept
Write a Comment
User Comments (0)