INDEX - PowerPoint PPT Presentation

1 / 14
About This Presentation
Title:

INDEX

Description:

GPMT = f(T) T, T 9 / 4 sensors/grid. full redundant system. individual grid ass. / test. 52 52 DS18B20 sensors. 8 8 USCM T ports ... – PowerPoint PPT presentation

Number of Views:44
Avg rating:3.0/5.0
Slides: 15
Provided by: jesus5
Category:
Tags: index | ass

less

Transcript and Presenter's Notes

Title: INDEX


1
INDEX
  • Dallas temperature sensor readout
  • Power up
  • Production status
  • Electronic set-up at CERN

2
TEMPERATURE READ-OUT BASELINE
  • GPMT f(T) ? T, ?T
  • 9 / 4 sensors/grid
  • full redundant system
  • individual grid ass. / test
  • 52 52 DS18B20 sensors
  • 8 8 USCM T ports

3
TEMPERATURE READ-OUT
4
RESOURCES REQUIREMENTS
5
TOPOLOGY OF THE SYSTEM
S9011B
28V
S9053
S9054
S9057
S9057
28V
S9053
S9054
S9057
S9057
S9057
S9057
LR
LR
LR
HV BRICK
LR
LR
LR
RCDP
RCDP
RCDP
LR
LR
LR
LR
LR
LR
RCDP
RCDP
RCDP
RJINF
RJINF
6
SLOW CONTROL FUNCTIONS
  • HV
  • Capabilities
  • Channel reset
  • Satus read
  • Shut down
  • Output voltage setting
  • Reading of settings
  • Control
  • Channel reset
  • Shut down
  • Output voltage setting
  • Monitoring
  • Reading of settings
  • Satus read
  • DAQ
  • Capabilities
  • FE LR Voltage Reading
  • FE LR on/off operations
  • PreAmp peaking time set
  • Reading of settings
  • Control
  • FE LR on/off operations
  • PreAmp peaking time set
  • Monitoring
  • Reading of settings
  • FE LR Voltage Reading
  • ERPD
  • Capabilities
  • ON/OFF 28V

7
PRODUCTION (DAQ)
  • DAQ
  • QM R-CDP PCB ready
  • QM R-CDP PCA in progress (_at_ CRISA) April-05
  • QM R-CDDC PCB in progress
  • QM R-CDP PCA (_at_ CRISA) April-05
  • QM test _at_ INTA
  • DAQ software
  • Data reduction implemented tested
  • Calibration
  • Calibration algorithms implemented test in
    progress
  • Flash operation to be implemented

8
PRODUCTION (ERPD)
  • QM
  • QM DC-DC PCA ready
  • QM Mechanics in progress _at_ IAC (BOX March - H
    frame ??)
  • ERPD QM assembly _at_ CIEMAT (baseline)
  • QM test _at_ INTA (baseline)
  • FM
  • DC-DC
  • Mechanics at IAC
  • Assembly (baseline _at_ CIEMAT)
  • FM test _at_ INTA (baseline)

9
PRODUCTION (RICH HV BRICK)
  • QM
  • Mechanics (box) ready _at_ CIEMAT
  • Mechanics (frame) starting _at_ CIEMAT
  • Connectors procurement in progress (50 pieces 1-2
    weeks/ rest 12 weeks)
  • Order to CAEN in progress
  • 5 month delivery time
  • Qualification test (baseline _at_ INTA)
  • FM
  • Mechanics _at_ IAC

10
QM TEST
  • BOARDS
  • Visual inspection
  • Thermal Stress
  • CRATES
  • Functional
  • Thermal cicling
  • Vibration ( 3 axis Sine-Ramdom-Sine)
  • TVT
  • EMI

11
QM TEST
12
PARTS SELECTION QUALIFICATION
13
RICH DAQ
JINF-R
CDP
CDP
CDP
CDP
CDP
CDP
JINF-R
CDP
CDP
CDP
CDP
CDP
CDP
AMS-WIRE, LV1, FT, BUSY 15 pins conector,
LVDS AMS-WIRE 9 pins conector, LVDS ON/OFF_0,
ON/OFF_1 9 pins conector, LVDS 2 LeCroy buses 9
pins conector, LVDS LV1, BUSY 9 pins conector,
LVDS FT 9 pins conector, LVDS
14
TOPOLOGY OF THE SYSTEM
S9011B
28V
S9053
S9054
S9057
S9057
28V
S9053
S9054
S9057
S9057
S9057
S9057
LR
LR
LR
HV BRICK
LR
LR
LR
RCDP
RCDP
RCDP
LR
LR
LR
LR
LR
LR
RCDP
RCDP
RCDP
RJINF
RJINF
Write a Comment
User Comments (0)
About PowerShow.com