Title: panorama of infrastructure


1
panorama of infrastructure
  • Open Dialogue with
  • Ministry of Planning and Investment

presented by Dang Le Hoang, official of
Infrastructure and Urban department, MPI
2
Contents
  • overview of infrastructure, archivements
  • challenges and opputunities
  • PPP legal framework
  • list of calling for projects
  • investment procedure for projects

3
1. Overview of Vietnams infrastructure
Mode of transportation
  • Highway
  • Railway
  • Marine
  • Aviation
  • Waterway

4
Highway network system
5
Railway network system
  • Total of length more than 2.600 km, not to be
    electrified
  • 1.000mm size of rail
  • Interchanges are mostly operated by hand
  • Actual operation velocity ranges 50 to 80 km/h
  • 346 locomotives, 75 among them more than 15
    years of operation

Comments
  • Old-fashioned
  • Single rail
  • Lots of crossroads and bottle-neck
  • High risk of breaking down due to disaster
  • Urban railway system not to be constructed

6
Marine network system
  • 114 ports and wharves, international seaports are
    Cai Mep Thi Vai (south), Lach Huyen (north),
    Van Phong (middle).
  • Ships and vessels 360 for offshore vessels and
    505 inshore ships
  • 400 maritime transport company, among them 1/3
    is foreign company.

Comments
  • Maritime transport is limited because there are
    not any deep-water ports.
  • Lack of equipment for loading and unloading
  • Lack of competition between companies

7
Aviation network system
  • 21 airports, including 18 for local and 3 for
    international service (Long Thanh international
    airport is under planning)
  • Discharge is higher and higher. The Gov planned
    for widening and upgrading
  • 5 airline companies Vietnam airline, Pacific
    airline, Jetstar, Vietjet and Air Speed up
    airline.
  • More than 40 planes
  • 1 Aviation research institute

Comments
  • Need to open international network
  • Security and safety in aviation
  • Resources of human
  • Development of plane team
  • Lack of legal framework for socialization
    investment

8
Waterway network system
  • North waterway system has 2.700 km, minimum wide
    30-36m, deep 1.5-3.6m
  • South waterway system has 3.000 km, minimum wide
    30-100m, deep 2.4-4.0m
  • Middle waterway system has 800 km, limited
  • 7.200 ports and river watering places.
  • 90.000 ships aver 70ton
  • 700.000 ships aver 1-10 ton
  • Mainly for coal, ore, cement, material,
    fertilizer, consumer goods.

Comments
  • Need to open international network
  • Security and safety in aviation
  • Resources of human
  • Development of plane team
  • Lack of legal framework for socialization
    investment

9
Telecom network system
  • The number telephone per 100 citizens is 75,42
  • Internet subcribe gains 6,03 million, up to now
    there are 20,16 million people who use internet
    (approximately 23,7 population of Vietnam)
  • 100 equiped telephone for commune
  • 19.200 postal service places that averages
    2,35km/place
  • Mobile phone is strongly developed with the
    expansion of Viettel

Comments
  • Delay equitization state-owned telecom enterprise
  • cost/minute is still high
  • Lack of hi-tech

10
Urban infrastructure
  • Area for an urban citizen is 13,3 m2
  • Fresh water supply gains 84
  • Solid waste collected is 79 in urban area
  • Private sector pays attention for urban water
    supply
  • More real estate project for neighbouring big
    city such as Ha Noi, HCM city...

Comments
  • Real estate market is still at a start, price
    remains fluctuated
  • Urban management has been inadequate
  • Privte sector takes soundings

11
Review of energy industry
  • Electric area upto Mar, 31, 2008, for district
    100 commune 97,15 household 93,6 have the
    national electric network
  • Coal, mine ores and metallurgy Vinacomin has
    underconstructing allumin project in Lam Dong,
    Daknong and has invectment license in Lao,
    Cambodia. It also makes the coorperation with
    foreign investors such as Alcoa (US), BHP
    Billiton (Aus), China...
  • Oil and gas Keeping construction essential
    petrolchemical project like Dung Quat, Nghi Son,
    Can Tho, Vung Ro, Long Son

Comments
  • Huge demand of capital
  • Some electric project with delay
  • Lack of hi-tech
  • Lack of skillful labors

12
Renewable energy
  • Small hydropower
  • Biomass energy
  • Biogas
  • Solar energy
  • Wind energy
  • Geothermal energy
  • Biofuels
  • Tidal wave energy
  • Exploitation and use of waste

13
2. Challenges for infrastructure
  • Shortage of sustainable finance
  • Limitation of taking full advantage of available
    infrastructure
  • Non-comprehension between urban planning and
    infrastructure development
  • Unbalance in assignation between areas of
    infrastructure
  • Uncontrolled increases of personal vehicles
  • Trouble in encourage private sector for taking
    part
  • Incomplete institution

14
3. PPP legal framework the decree 78/2007/ND-CP
issued by the Government
Areas can be applied - Highway, tunnel and
involving facilities - Railway, tram - Airport,
seaport, river watering place, ferry - Water
supply works, drainage, sewage disposal, waste
disposal - Electric power, electric network -
Others due to decision of the Prime Minister
15
Major features of the 78 decree
  • No difference between foreign investor and
    domestic investor
  • 2 ways of subsidy
  • State-owned enterprises make a financial
    contribution to the established company with the
    rate not exceed 49
  • State funds clearance site or contruction
    auxiliary works
  • Fix the minimum ratio of debt/equity in the
    project
  • Establishment and sounding market the list of
    calling for projects
  • More power is devolved to the regional government
  • More concessionary tariffs

16
4. List of calling for projects
1. 1290/QÐ-TTg issued 26th, Sep 2007 on the list
of calling foreign investment for period of the
year 2006 to the year 2010
2. 412/QÐ-TTg issued 11th, Apr 2007 on the list
of investment imprortant transportation,
essential infrastructure to the year 2020
3. 2667/QÐ-BGTVT issued 30th, Aug 2007 on the
list of calling project investment in the way of
BOT, BT, BTO for transportation area
4. List of calling for investment projects of
provinces
17
5. Process for investing a project
  • make preparation a project
  • Architecture competitive examination
  • Competitive selection for consultancy (3 steps, 2
    steps or 1 step)
  • Appraisal and approve the project
  • construction
  • Pre-construction bidding plan, bidding detail
    design, construction license, bidding contractor
    and supervision consultancy, ensurance
  • Underconstruction construction and erection
  • Project management quanlity, progress, volume,
    safety, environment, cost, contract.
  • finish and transfer
  • Check and take over
  • Balance and audit
  • Warranty

18
The sketchy process for PPP project
19
  • Project proposal and feasibility study can be
    prepared in 2 ways
  • Authority agency makes a preparation (in the list
    issued)
  • The investor makes a preparation (not in the
    list)
  • These must be appraised and approved by the
    Authority agency
  • The content of a project proposal is detailed at
    the Article 9 of 78/2007/ND-CP decree

20
  • Investor selection can be done in 2 methods
  • Competitive bidding (local or international
    bidding)
  • Nominate the investor
  • Authority agency is responsible for selection the
    investor
  • MPI makes the regulations for selection investor

21
  • Authority agency presides over the contract
  • Main contract
  • Involving contract
  • Main contract detailed at the article 15
  • Disscusion about subsidy, warranty, operation
    period
  • For the foreign investor, it can be applied
    international law if only the law is not against
    the available concerning Vietnamese laws
  • The contract is initial, not official

22
  • MPI issues the investment license
  • For any project (now)
  • For some projects that determined (being
    reformed)
  • MPI make an examination and verification the
    process before issuing the investmnet license
  • Content of an investment license
  • Name and address of the investor
  • Number and dating of the business centificate
  • Purpose and location of the project
  • Cost or total capital, subsidy
  • Concessionary tariffs and Government warranty

23
Some PPP remarkable projects
  • 1. Expressway Quang Tri Hue Da Nang
  • Total length 178 km
  • Cross-section 4 lanes
  • Estimated cost 750 millions USD
  • More information
  • Contact Ministry of transportation, planning and
    investment Department
  • Acorrding to precast in the strategy of
    transportation Volume for section from Quang Tri
    to Hue is more than 10.000 PCU/daynight. Volume
    for Hue Da Nang is more than 20.000
    PCU/daynight (by the end the year 2010)
  • Recommedation the section Hue to Da Nang is more
    attractive
  • it can be done with BOT method
  • Milestone of toll charge fee can be started at
    90/TT/BTC circular on highway toll for Vietnam

24
Some PPP remarkable projects
  • 2. Vinh Thinh bridge and linking-road to 2C
    national highway
  • Total length 3,38 km
  • Cross-section 24 meters
  • Estimated cost 59 millions USD
  • Place Ha Noi, Vinh Phuc
  • More information
  • Contact Ministry of transportation, planning and
    investment Department
  • it can be done with BOT, BT combination with land
    method
  • Milestone of toll charge fee can be started at
    90/TT/BTC circular on highway toll for Vietnam

25
Some PPP remarkable projects
  • 3. Urban railway from Ha Noi to Noi Bai airport
  • Total length 27 km
  • Type Light railway system
  • 2 lanes
  • Estimated cost 370 millions USD
  • Place Ha Noi
  • More information
  • Contact Ministry of transportation, planning and
    investment Department
  • it can be done with BOT method

26
Some PPP remarkable projects
  • 4. Nghi Son seaport
  • Capacity 1,2 2,0 millions ton/year, more than
    10.000 DWT and container ships service
  • Estimated cost 100 millions USD
  • Place Thanh Hoa
  • More information
  • Contact Ministry of transportation, planning and
    investment Department
  • it can be done with foreign direct investmetn
    method or business contract with joint-venture
    company.
  • Petrolchemical plant is underconstruction
  • Open economic zone Nghi Son is attractive
    investors

27
Some PPP remarkable projects
  • 5. Tham Luong Ben Cat Nuoc Len canal
    improvement
  • Embankment 2 sides of the canal with total length
    of 60 km
  • Construction roads system and parks longitudinal
    the canal
  • Tidal control culvert
  • Improve canal level 2 and level 3
  • Total cost 400 millions USD
  • Place district 12, Ho Chi Minh city
  • More information
  • Contact Ho Chi Minh community.
  • it can be done with BT combination land along the
    canal
  • It is good for developing the real estate projects

28
Thank you for your attending
  • Infrastructure and urban department Ministry of
    Planning and Investment 02 Hoang Van Thu, Ba