FORCEnet - PowerPoint PPT Presentation

About This Presentation
Title:

FORCEnet

Description:

– PowerPoint PPT presentation

Number of Views:92
Avg rating:3.0/5.0
Slides: 26
Provided by: proceedi
Category:
Tags: forcenet

less

Transcript and Presenter's Notes

Title: FORCEnet


1
(No Transcript)
2
FORCEnet Engineering ArchitectingThe Navys
IT Future
  • NMCI - Industry Symposium
  • 19 Jun 2003

RADM Mike Sharp, USN Vice Commander Space Naval
Warfare Systems Command
3
Agenda
  • SPAWAR Review
  • SeaPower 21 FORCEnet
  • FORCEnet and NMCI

4
SPAWAR - A Quick Review
One of the Navys three major acquisition
commands with 7,700 employees
5
The Mission
We deliver FORCEnet to the Joint Warfighter
through the DEVELOPMENT, ACQUISITION, and LIFE
CYCLE SUPPORT of effective, capable
and integrated command, control communication,
computer, intelligence, surveillance and
reconnaissance, IT, and space systems.
6
Functional Organization
Function
Responsibility
C4I FORCEnet Architecture / Objectives
Systems Design and Engineering
Chief Engineer (05)
Defense In Depth
Navy / Marine Corps Intranet
Systems Integration and Testing
Integrated Implementation Planning
Battle Group Test/Training/Support
Comptroller (01) Contracts (02)
Financial Management / Contracting Support
7
The Navys Vision
8
FORCEnet Operational View
  • Sea Power 21 Naval
  • Joint from Inception
  • GIG-BE
  • TCA
  • NCES
  • JTR
  • Others
  • Commercial Standards
  • Spiral Development with Sea Trial
  • Warrior Focused

9
FORCEnet Schedule CNO Guidance 2003
Other SYSCOMs Commands
SPAWAR
OPNAV
Fleet Engagement
Completed
CY 2003
C
CY 2003
5 JunPOM 06 Assessment Draft for Review by
Stakeholders
24 AprAssessment Team Identify Milestones
22 MayMS and Cost Analysis Results
Focus Areas
C
6
6
9
C
C
5
6
10
Assessment
3 JunFBE KILO Input to Fn
30 SepIPD Execution Assessment
27 JunPOM 06 Assessments to CNO 704B
22 OctN6-N7 POM 06 Brief to CNO
Wk of14 AprPOM05 Data Link Assessment
8 MayStakeholder Buy-in to Assessment Domain
Approach
5-7 MayNNWC Architecture Conference
1 OctFn Master Plan V1.0
2 AprFn GRA Vision V1.0
C
C
10
C
6
5
Architecture/ Standards
1 MayFn Architecture Standards Preliminary
Draft Document
15 MayFn GRA Vision V1.1
15 JunFn Architecture Standards V1.0
8-11 AprCampaign Plan Build Conf
31 MayCampaign Plan Completed
C
5
C
Campaign Plan
Wk of 21 AprBrief Fn Leadership
4-8 AugFn IPD Final Planning Conference
25-30 SepFn IPD Execution
28 Apr 9 MayFn LOE 03-2
Quick Successes (Warfighting Capabilities)
9
C
C
6
8
9
17-18 JunFn IPD Mid Planning Conference
3-10 SepIPD in JTFW Regional Test 2
22-23 AprFn IPD Initial Planning Conference
10
Architectural Process
Govt. Ref. Arch. Vision Version 1.0 02 Apr
03 Version 1.1 15 May 03
OPNAV ASN(RDA) Review
Distributed Services IP- Based Network
Industry Review Comment
Architecture Standards Version 1.0 1 May 03
11
Network Data Integration
Application
Language

HF LOS/L-BAND (Link 16)
Transport
Radio/Term
Language
IT-21
Application
12
Network Data Integration
Transport
Radio/Term
Services, not Platforms
Separation of Interface from Implementation
Protocol Neutral
XML or Language Translation
Language
C4I Service
C2 Link Service
MTI Service
SIGINT Service
Service
13
Architectural Process
Govt. Ref. Arch. Vision Version 1.0 02 Apr
03 Version 1.1 15 May 03
OPNAV ASN(RDA) Review
Distributed Services IP- Based Network
Industry Review Comment
Architecture Standards Version 1.0 1 May 03
14
JTF Connectivity Today Based on Wireline
Networking Principles
UAV Tier II
Tier 3 - Mobile SATCOM / Microwave (Trunk Links)
Tier 2 - Mobile LOS Network (Backbone Subnet
Links) Tier 1 - Mobile Handheld (Subscriber
Subnet Links)
Air Force Area 0
Army Area 0
Navy Area 0
Sub
ARG
BG
ARG
Marines Area 0
15
This is the way we will fight, this is the
communications capability we want!
UAV Tier II
Tier 3 - Mobile SATCOM / Microwave (Trunk Links)
Tier 2 - Mobile LOS Network (Backbone Subnet
Links) Tier 1 - Mobile Handheld (Subscriber
Subnet Links)
BG
OBJECTIVE
16
FORCEnet Challenges
  • Multi-Level Security
  • Information Assurance
  • IP Quality of Service
  • IP for Mobile Users
  • Leverage Experimentation Pilots
  • Explore large scale integration approach

17
Agenda
  • SPAWAR Review
  • SeaPower 21 FORCEnet
  • FORCEnet and NMCI

18
Tying it together
Current Readiness
Future Readiness
INFRASTRUCTURE
DECISION MAKING
Knowledge Superiority

19
Getting from here to there
20
NMCI Tactical Networks Interface
Wide Area Network
NMCI/IT-21 Interface
Base Area Network
Metropolitan Area Network
BASE
MC AIR STATION
CLINIC
NAVAL AMPHIBIOUS BASE
DoD TELEPORT
LAN
BASE
TRNG CEN
HQ
NOC
IMA FISC
NCTAMS
TRAINING CENTER
USN/USMC LOGISTIC BASE
Network Operations Center
NMCI to the pier
Deployed/ Mobile Units
End-to-End Connectivity
21
NMCI will deliver to the Web-enabled Navy
Embarkables
Business and Operations
IT21 / Marine Corps Tactical Network
Navy Marine Corps Intranet
Navy Learning Network
Industry Partners
Research Network
Replicated Data Bases Per Mission Requirements
.edu
Extranet
Defense Information System Network (DISN)/ Global
Information Grid (GIG)
SYSCOM
Training Center
Fleet USMC Deployed Forces
Pier Connections
HQ
TELEPORT Network Operations Center (DISN
Interface)
Clinic
Common User Access Between Afloat and Shore
Authoritative Data Centers
22
CNOs Philosophy
  • I want everyone here in industry to remember
    that Vern Clark said here today that we are never
    ever building another capability that doesn't fit
    into a FORCENet architecture for the future that
    ensures everybody is netted and connected. That
    is the future.
  • Admiral Vern Clark
  • Sea Air Space Exposition
  • Washington, D.C.
  • April 17, 2003

23
(No Transcript)
24
Backup
25
Building C4I Joint Team
DRAFT
Write a Comment
User Comments (0)
About PowerShow.com