FISH PASSAGE - PowerPoint PPT Presentation

1 / 20
About This Presentation
Title:

FISH PASSAGE

Description:

FISH PASSAGE – PowerPoint PPT presentation

Number of Views:95
Avg rating:3.0/5.0
Slides: 21
Provided by: richardcr
Category:
Tags: fish | passage | xnnx

less

Transcript and Presenter's Notes

Title: FISH PASSAGE


1
FISH PASSAGE WASHINGTON COUNTY
  • Fish Passage Assessments
  • Prioritization Program
  • Replacement Efforts
  • Permitting Efficiencies
  • Contract Improvements
  • Compliance Tools
  • Training

2
Fish Passage Assessments

3
Four Ways to Evaluate Culverts for Fish Passage
  • Observation of fish at culverts
  • Velocity Measurements
  • Modeling
  • Measurements of Surrogates Indicative of
    Hydraulic Conditions

4
Measurements of surrogates indicative of
hydraulic conditions
  • Doesnt require strong background in fisheries,
    hydrology or Hydraulics
  • Covers the most culverts in the shortest time
  • Information can be used for later hydraulic
    analysis

5
Coarse/Fine Screen Evaluations
  • First Pass Structure Is it a barrier?
  • First Pass Habitat What is the immediate site
    habitat value?
  • Second Pass Structure Is it a significant
    barrier? species, life history
  • Second Pass Habitat What is the quality
    quantity of the reach habitat?
  • Third Pass Structure Habitat (Prioritization)
    Where does this particular structure rank in
    relation to other barriers in the watershed?

6
(No Transcript)
7
Prioritization Program
  • Comparing barriers to each other within the
    watershed
  • Ranked based upon quality and quantity of habitat
    blocked by barrier as well as proximity to ESH
    streams
  • Grouped based on geographic considerations and
    construction logistics

8
(No Transcript)
9
1 Fish Passage Barrier in Dairy McKay Watershed
  • Fern Flat Road
  • Carries all of Campbell Creek
  • At the Dairy Creek confluence
  • Blocks gt5 miles of high quality habitat

10
(No Transcript)
11
(No Transcript)
12
Replacement Efforts
  • OWEB application submitted for Greener Road
    Grouping
  • Pottratz Road Phase I Culvert Replacement and
    stream restoration (BLM Title II)
  • Plentywater Creek design alternative analysis
    (BLM Title II)
  • Culvert Replacement Program incorporates FP
    design standards

13
Greener Road Culverts 5.4 miles
14
Pottratz Road Phase I
15
Plentywater Creek-1 mile
16
Permitting Efficiencies
  • Design for exemptions
  • Use Programmatics when possible (SLOPES)
  • Developing Fish Passage Program Approval with
    ODFW
  • Exploring watershed based regional general
    permits (ACOE/DSL)

17
Contract Improvements
  • Consistent approach with all projects
  • Incorporate typical permit conditions into
    contracts, specifications, design
  • Certified fish salvage personnel
  • Stand-alone special provisions for protection of
    fish and wildlife

18
Compliance Tools
  • Limit 10 BMPS
  • Quick Reference Quides
  • Maintenance Crews
  • Inspection Guides
  • On site water quality monitoring
  • Sophisticated diversion structures

19
Training
  • BMPS Intro Advanced
  • In-water work inspection training
  • Classroom Field training
  • Permit Strategy
  • Environmental Project Management

20
Questions?
Janet Oatney 503-846-7652
Write a Comment
User Comments (0)
About PowerShow.com