Title: SCRAP TIRE MARKET DEVELOPMENT
1SCRAP TIRE MARKET DEVELOPMENT
- BY
- TERRY GRAY
- TAG RESOURCE RECOVERY
- TIRE WORKSHOP 2013
-
- SAN ANTONIO, TEXAS
- APRIL 3, 2013
2PERSPECTIVE
- FIRST PROGRAM IN MINNESOTA IN 1984
- MANY U.S. STATES STILL DONT HAVE SUCCESSFUL
PROGRAMS - lt1 UTILIZED IN 1984, BUT ABOUT 80 IN 2011
- MEXICO CAN ACCELERATE ITS GROWTH BASED ON GOOD
AND BAD HISTORICAL EXPERIENCES
3US SCRAP TIRE MARKET TRENDS 2005-2011
4MAJOR APPLICATIONS
5ENERGY
- CEMENT KILNS
- POWER GENERATION
- PAPER MILLS
- DEDICATED FACILITIES
- PYROLYSIS/GASIFICATION
6U.S. TIRE-DERIVED FUEL MARKET TRENDS 2005-2011
7U.S. TIRE-DERIVED FUEL MARKETS 2011
8CEMENT KILNS
- ENVIRONMENTALLY EXCELLENT
- ECONOMICALLY ATTRACTIVE
- QUICKLY DEVELOPED
- GENERALLY WHOLE TIRES, SOME TDF
- NEEDS CONSISTENT SOURCE
- PROGRAM CORNERSTONE
9MODERN CEMENT FACILITY
10CEMENT KILN
11MANUAL FEED SYSTEM
12AIR LOCK
13INTO KILN
14RAPID COMBUSTION
15(No Transcript)
16(No Transcript)
17(No Transcript)
18(No Transcript)
19(No Transcript)
20(No Transcript)
21(No Transcript)
22(No Transcript)
23(No Transcript)
24POWER AND PAPER INDUSTRIES
- SPECIFIC BOILER TYPES INCLUDE CYCLONE,
STOKER-FIRED, CFB - DISPLACES COAL OR OTHER SOLID FUEL
- USES NOMINAL 1 OR 2 TDF, BEAD WIRE REMOVED
25(No Transcript)
26(No Transcript)
27(No Transcript)
28(No Transcript)
29(No Transcript)
30 COMPARATIVE TDF PRODUCTION ECONOMICS
(CHIP SIZE VS TIRES/YR)
CHIP SIZE 500,000 1,000,000 1,500,000
2.0 69 -11 -42
1.5 82 BASIS -14
1.0 94 35 0
31PYROLYSIS
- HISTORICALLY UNSUCCESSFUL
- NO COMMERCIALLY SUCCESSFUL SYSTEMS IN NORTH
AMERICA - OVER 500 MILLION EXPENDED
- MAJOR COMPANIES AND SMALL PROMOTERS
32CRITICAL ISSUES
- TECHNICAL PERFORMANCE
- UNRELIABLE OPERATION
- EXPLOSIONS/FIRES
- ENVIRONMENTAL ISSUES
- AIR
- CHAR DISPOSAL
- ECONOMIC PERFORMANCE
- GAS UTILIZATION
- OIL ONLY BLENDSTOCK
- CHAR MARKET
33CIVIL ENGINEERING
- LIGHTWEIGHT FILL
- DRAINAGE AGGREGATE
- WHOLE TIRES IN RETAINING WALL CONSTRUCTION
34Dixon Landing Interchange
- PROBLEM Embankment Constructed on Bay Mud
- SOLUTION Use TDA for the core of the embankment
- CHEAPEST SOLUTION Caltrans saved 470,000
- USED 600,000 tires
35Typical Cross Section
36Spread with bulldozer
37Rt. 91 Wall in Riverside, CA
- Freeway widening
- Objective show that reduced earth pressures can
reduce overall wall construction costs - Length 260 ft
- Tires used 75,000 PTE
38Rt. 91 wall cross section
39Half of TDA in Place
40Potential Future Savings for Walls
- Lower pressure on wall ? less rebar
- Potential reduction 28 tons/100 ft
- Potential cost savings 13,000/100 ft
41RETAINING WALLS
- WHOLE TIRES MECHANICALLY JOINED TO STABILIZE OR
RETAIN SLOPE - NOT BROADLY APPLIED IN US DUE TO LABOR COSTS
- MINIMAL CAPITAL EXPENSE FOR SMALL VOLUMES
42CRUMB RUBBERAPPLICATIONS
- SPORTS SURFACES
- MOLDED PRODUCTS
- RUBBER-MODIFIED ASPHALT
- DECORATIVE MULCH
43CRUMB RUBBER CHARACTERISTICS
- SLOW OVERALL MARKET GROWTH
- HIGH CAPITAL
- HIGH MAINTENANCE
- MARKET CHALLENGES
44RURAL CONSIDERATIONS
- VOLUME SENSITIVITY
- REGIONAL PLANS, COLLECTION CENTERS OR PROCESSING
FACILITIES - MOBILE PROCESSING
- CAREFULLY EVALUATE BALE APPLICATIONS BEFORE
STARTING
45SUGGESTIONS
- FOCUS ON ENERGY (ESPECIALLY CEMENT KILNS)
INITIALLY - DEVELOP CE DESIGN EXPERIENCES AND PRACTICES
- BEGIN TO ENCOURAGE CRUMB MARKETS, BUT AVOID
PREMATURE OVER-COMMITMENT
46PROCESSING EQUIPMENT
- APPLICATIONS RANGE FROM WHOLE TIRES TO FINE
POWDER - SPECIFIC EQUIPMENT REQUIRED TO PRODUCE EACH SIZE
PRODUCT - KNOW MARKET BEFORE PURCHASING EQUIPMENT
47KEYS TO SUCCESS
- LEARN FROM OTHERS SUCCESS AND FAILURE
- EVALUATE BEFORE CHARGING
- CHALLENGE MAGIC PROPOSALS
- RECOGNIZE LOCAL MARKET VARIATIONS
- RECOGNIZE REALITY
48CONTACT INFORMATION
- TERRY GRAY
- TAG RESOURCE RECOVERY
-
- EMAIL tagray_at_flash.net
- PHONE (281) 463-7552