Pr - PowerPoint PPT Presentation

1 / 24
About This Presentation
Title:

Pr

Description:

Interiors of Uma Sanjeevni Hospital - Dakshin Marg, ... Office Interior at 26, Kasturba Gandhi Marg, New Delhi-110001 Period of Execution: October 1991 to ... – PowerPoint PPT presentation

Number of Views:163
Avg rating:3.0/5.0
Slides: 25
Provided by: SaiB8
Category:
Tags: interiors | office

less

Transcript and Presenter's Notes

Title: Pr


1
Présentation of Company Profile
  •  T M Créative Designs Contracts 

2
Contact Detail
  • T M Creative Designs Contracts
  • 107, Shri Lakshmi House,
  • D-355, Vikas Marg, Laxmi Nagar,
  • Near Laxmi Nagar Metro Station,
  • Delhi 110092.
  • T. 011 4057 8236, 4759 7384
  • M. 9198108 22027
  • E-mail tmcdc.india_at_gmail.com

3
Who We Are ?
  • TM Creative Designs Contracts is a name
    synonymous to Gracious living and dazzling
    lifestyles in world of Architecture as well as
    Interior design.
  • Ours expertise in the Designing Execution,
    offers your home a well deserved magnificence
    look feel, and living in elegance aroma.
  • We at TM Creative believe that Interior
    Designing is an art of structuring, arranging,
    furnishing, and decorating the surroundings that
    makes your living healthy and lively, keeping in
    mind the convenience space for your various
    activities, comfort, luxurious ease, celestial
    ambience, and rejuvenating indulgence to your
    keen senses for Luxury, Architecture and
    Lifestyle.

4
What We Offer
  • Our offering comprises from Design
    Consultancy to a full scale Turnkey Execution of
    Projects with all services . Scope involves
    Interior Designing, Architecture, Project
    Management, Interior Fit Out, Furnishing, Project
    Planning and Costing, Supervision Quality
    Control, Budget monitoring and coordination of
    the entire project.

Our Clients
Since 2002, we are continuing our journey and
lined up with long listed clientele in various
segments comprises of Corporate Offices, Hotels,
Residences, Airlines, Restaurants Cafes,
Showrooms, Call centers, Educational
Institutions, Farm Houses, Schools, Auditorium
and landscaped areas, schools, auditoriums etc.
5
Services offered by TM CDC
  • CIVIL CONSTRUCTION
  • SERVICES - ELECTRICAL, SANITARY, PIPING, ROAD
    etc.
  • FABRICATION ERECTION OF STRUCTURAL STEEL WORK,
    TRUSES, PORLINES,ISMB etc.
  • STRUCTURAL GLAZING WORK.
  • MS SS FABRICATION, STRUCTURS, COMPONENTS,
    DISPLAYS, PROJECTIONS etc.
  • MASS CONCRETEING, MS STRUCTURAL FOUNDATION
    ERECTION WORKS.
  • AIR-CONDITIONING PACKAGE, FIRE FIGHTING WORK,
    SPECIALIZED ELECTRICAL INSTALLATION WORK.
  • TURNKEY EXECUTION OF VARIOUS PROJECTS INVOLVING
    DESIGNING - INTERIOR DECORATION / FINISHING
    WORK ALONG WITH SERVICES COMPLETE FURNITURE
    ( Modular Non Modular) AND UTILITIES.
  • Assuring Our Best Services All the Times.

6
Our Philosophy
  • Customer Focus and Attention We focus on our
    customers' requirements, expectations, and latent
    needs. We evaluate the need of our customers and
    customize the solutions to match the innermost
    desires of them.
  • Partnership and Teamwork Our designers efforts
    and performance will be characterized by strong
    partnerships with clients and working in unison
    with their thought process and effective teamwork
    across all boundaries.
  • Employee Development The continuous support and
    personal development of our designers for the
    latest trends and best practice in the Design
    Consultancy Industry.
  • Service and Quality These tow key words are the
    foundation of the success, what ever we have
    earned so

7
Our Team Capabilities
  • TMCDC has a pool of Interior Designers
    Consultants having experience in environmental
    psychology, Architecture, Product design and
    traditional decoration (aesthetics and
    cosmetics). They are conversant with the latest
    technology, environmental parameters, green
    design concepts and code of Indian as well as
    International standards.
  • To complement the efforts of our design team we
    have expertise and competent consultants from
    various fields like Electrical, Lighting,
    Acoustical / Insulation, Air conditioning, IT
    networking, Security PA systems, PHS, Fire
    Fighting, Power Generation, Landscaping along
    with a bank of contractors with comprehensive
    management skills and track Record.

8
Our Approach Methodology
  • We consider every project as a new challenge, a
    challenge to climb the height mountain pick, a
    challenge to create always better that the
    previous one, a challenge to touch the finish
    line quicker than last time, a challenge to
    deliver the Project above the expectation of our
    valued clients.
  • Understanding the clients latent needs and
    desire, we define the objectives and underlying
    theme along with the goals and timelines along
    with the budget. Low cost, elegant, functional
    concepts and implement them in fastest way.
  • The clients trust us by unfolding their vision to
    us, and we bestow the trust reposed in us by
    converting their dreams into reality. Besides
    creating relationships we build faith, mutual
    trust and respect with not only our clients but
    also the design and building community.
  • The Reward, we achieve with a smile of our
    Clients after successful completion of their
    projects up to their desired satisfaction.

9
List of Few Projects Designed, Executed
Handed over
  • Design Turnkey Execution of Commercial /
    Institutional Projects
  • Girls Hostel - Area 10,000 Sq.ft in Malviya
    Nagar, New Delhi
  • Ravi International (Export House) Showroom Cum
    Office Area (10,000 Sq. ft.)
  • KA-35, Kaushambi, Ghaziabad, (U.P).
  • R P Exports - D-73 Sec-2, Noida. (U.P)
  • Myanmar House, Embassy of Myanmar - 3/50 F,
    Santi Path, Chanakaya Puri, New Delhi.
  • Interior of STG Computer Centre - K3/15, DLF-II,
    Gurgaon, Haryana.
  • Interiors of Uma Sanjeevni Hospital - Dakshin
    Marg, DLF-III, Gurgaon
  • A.N. G Commodities Pvt. Ltd. Plot No. VC-1,
    Vaishali. GZB
  • R P Exports - D-73, Sec. II, Noida, (U.P)
  • Om Exports - Moradabad at Handicraft Gift Fair
    (Spring) 2001, Pragati Maidan
  • V.K Plastics - 307, Old Rohtak Road, Near Indian
    Hume Pipe Factory, Delhi
  • Ramada Hotel Airport Road, Khajuraho, M.P.
  • Interiors of Bank of Baroda, B-block, Middle
    Circle, Connaught Place, N.D.
  • Interior of Office for RP Exports, Gandhi Nagar,
    Moradabad, U.P.
  • Interior of MNC Office (Advocate), 1215, 12th
    floor Navrang House, K.G Marg, New Delhi.
  • Interior of A G Interactive Solution, 203,
    Orchid Square, Sushant Lok, Gurgaon
  • NRAI School of Mass Communication Technology
    Management, M 161/1A, Gautam Nagar, New Delhi.
  • Interior of Huntsman Advanced Material (India) P.
    Ltd., 14/5, Main Mathura Road, Faridabad

10
List of Few Projects Designed, Executed
Handed over
  • Design Turnkey Execution of Interiors for
    Sample Flats Comm. Projects
  • Assotech Contract (India) Ltd. - Windsor Green,
    Indirapuram, Ghaziabad (U.P.)
  • Super Tech Constructions Pvt. Ltd.- Emerald
    Court, Plot No. 4, Sec-93 A, Noida
  • Supertech Estate - Pent House - Judge Colony,
    Sec-9, Vaishali, GZB.
  • Purvanchal Construction Work Pvt. Ltd. - Silver
    Estate , Sec- 50, Noida
  • Apex Buildcon India Pvt. Ltd. - F-1, Shuraksha
    Aprts., Abhay khand - III, Indirapuram,
    Ghaziabad.(U.P)
  • R P S Group - A-2616, Green Valley Project, Green
    Field Colony , Faridabad
  • Purvanchal Construction Work Pvt. Ltd. - Silver
    City - I, Sec- 93, Noida.(U.P
  • Super Tech Avant Garde Plot No. 1 Sec 5,
    Vaishali ,Ghaziabad \
  • Aditya Durobuild Pvt. Ltd. Palm Court, Nr.
    Kanth Road, Moradabad
  • Rajhans - 4/4,Ahinsa Khand I, Indirapuram,
    GZB
  • Kreative Koalition - 616, Sec-V, Vaishali, GzB

11
List of Few Projects Designed, Executed
Handed over
  • Design Turnkey Interior for Residential Flats
    Houses
  • Res. No. B - 86, Preet Vihar, Delhi.
  • Res. No. 21, Shyam Enclave, Delhi.
  • Res. No. 202, Dayanand Vihar, Delhi
  • Res. No. 218, Air Force Society, Dwaraka, New
    Delhi.
  • Res. No. R12/A, Hauzkhas, New Delhi.
  • Res. No. P.No. 9/3, Block 9/401, Vidut Vihar
    Society, Sec-61, Noida. (U.P).
  • Res. No. D-98, Preet Vihar, Delhi.
  • Res. No. E-140, Sector-55, Noida.
  • Res. No. 181,18th Floor Beveldre Park, DLF
    Phase-III, Gurgaon, (Haryana).
  • Res. No. T-303, Parasnath Gardneria, Sec-61,
    Noida, (U.P).
  • Res. No. 114, Block-10, Kailash Dham Society,
    Sec- 50, Noida. (U.P).
  • Res. No. T-202, Parasnath Gardneria, Sec-61,
    Noida, (U.P).
  • Res. No. T-304, Parasnath Gardneria, Sec-61,
    Noida, (U.P).
  • Res. No. A-6, 6th Floor, Kaushambi,
    Ghaziabad.(U.P).
  • Res. No. B-266, Yojna Vihar, Delhi.
  • Res. No. 1082, Sec-15, Faridabad.
  • Res. No. P-2/18, Block - 9, Kailash Dham Society,
    Sec-50, Noida.(U.P)
  • Plot No. 4, Emerald Court - Sec-93 A,
    Expressway, Noida, (U.P)

12
List of Few Projects Designed, Executed
Handed over
  • Design Turnkey Interior for Residential Flats
    Houses
  • Res. C- 403, Super Tech Icon, Celebrity Hights,
    Indirapuram.
  • Res. 12, Ground Floor , SVI Utopia, Sec- 93A,
    Noida.
  • Res. D-110, Parsavnath Prestiage, Sec- 93,
    Noida.
  • Res. A- 2/83, Safdergunj Enclave , New Delhi.
  • Res. No. B - 2/07, Ground Floor, Purvanchal
    Silver City I, Sec-93A, Noida.
  • Res. No. - 59, Vardhan Apartment, I.P. Extn.
    Delhi.
  • Res. No.- J- 803, Aditya mega city , Indirapuram,
    GZB
  • Res. No. L -1202, aditya mega City,
    Indirapuram, GZB.
  • Res. No.- C-41, Navkunj Apartment, Parpatgang,
    Delhi.
  • Res. No. 38, Jeevan Bema Apartment, East Arjun
    Nagar, Delhi.
  • Res. No. C-17, Usha Niketan, Green Park, New
    Delhi.
  • Res. No.- 124, Gate No. 5, Dilshad Garden, Delhi.

13
Recent Projects
  • Designing and Turnkey Execution of Interior Fit
    out Projects
  • Client ISTS INFOTECH Pvt. Ltd. C-111, Sector
    63, Noida, UP.
  • Scope of Work Complete Design, planning and
    execution of Interior Fit Out for the area 7000
    Sq.ft. with all services i.e. PHS Work, Package
    Air Conditioning with Duct, PAS, Fire Fighting
    Work, Electricals, Networking Server, Access
    Control System along with all MODULER Furniture,
    Pre- fabricated Building System made Cafeteria at
    Roof Top .
  • Project Duration October 2010 to January2011.
  • Client Dwarkadhish Projects LTD. / DDF
    Consultants Pvt. Ltd. Delhi
  • Scope of Work Turnkey execution of Interior Fit
    Out for 5800 Sq.ft area at with all services i.e.
    PHS Work, Package Air Conditioning with Duct,
    PAS, Fire Fighting Work, Electricals, Networking,
    Access Control System along with all MODULER
    Furniture.
  • Project Duration January 2011 to March 2011

14
Few Projects Executed and Handed Over
  • Design Turnkey Execution of Architectural /
    Interior Fit Out with Services
  • Client TRIVENI ENGINEERING WORKS LIMITED. Corp.
    Office Interior at
  • 26, Kasturba Gandhi Marg, New Delhi-110001
  • Period of Execution October 1991 to December
    1991.
  • Project valued Rs.18 Lacks.
  • Client INDRA PRASTHA SEHKERI BANK LTD. Design
    Interior of Head office at A-101, Wazirpur
    Group Indl. Area, Delhi.
  • Period of Execution April 2000 to June 2000.
  • Project valued Appx.Rs.20 Lacks for Head Office
  • Client ALAN DICK COMPANY, England at their
    India Operation Office at A-8/22C, Vasant Vihar,
    New Delhi.
  • Period of Execution September04 to January05
  • Project valued Rs. 40 Lacks
  • Client HERO Group for their Call Center/ BPO
    Training Centers HERO MINDMINE at South
    Extn. Part II, New Delhi.
  • Period of Execution November05 to February06
  • Project valued Rs.30 Lacks

15
List of Few Projects Executed and Handed Over
  • Design Turnkey Execution of Architectural /
    Interior Fit Out with Services
  • Interior Decoration of Corp. Office for CHADDA
    GROUP OF COMPANIES
  • A.B.GRAINS (P) LTD. At Center Stage Mall, Noida.
  • Period of Execution May06 to September06
  • Project Valued Rs.35 Lacks.
  • Interior Decoration of Corp. Off for M/s.
    KARANJAWALA CO. at 10th Floor, H.T. Building,
    Kasturba Gandhi Marg, New Delhi 110001.
  • Period of Execution June06 to September06.
  • Project Valued Rs.25 Lacks.
  • Design Turnkey Interior of Delhi Office for
    M/s. Balrampur Chini Mills Ltd. At
    213,Rectangular I Building, City Center, Saket,
    New Delhi 17.
  • Period of Execution August06 to October06.
  • Project Valued Rs.17 Lacs.
  • Interior Decoration of Corp. Office for T I L
    Ltd. At 302 303, Ansal Bhawan, K.G.Marg, New
    Delhi 110001.
  • Period of Execution December06 to Januray07.
  • Project Valued Rs.15 Lacks.

16
List of Few Projects Executed and Handed Over
  • Design Turnkey Execution with Services
  • Design with Structural Remodeling ,Interior and
    Elevation for Super Facility Banquet for
    S.K.OTIK Group at A-47, Mayapuri Industrial
    Area, Phase-I, New Delhi.
  • Period of Execution June 07 to October 07
  • Project Cost Rs.1.35 Crore.
  • Turnkey Interior Work for Information Center at
    Maharastra State Emporium Building, Baba Kharak
    Singh Marg, New Delhi -1 for Sri. Sai Baba
    Sanasthan Trust, Shirdi, Dist. Aurangabad,
    Maharashtra.
  • Period of Execution November07 to January08
  • Project Cost Rs.18 Lacks.
  • Design Coordination and Turnkey Interior of
    Reception and Street Café at The Hotel Park, Park
    Street, Kolkata with SPCMG, Kolkata.
  • Period of Execution March08 to June08
  • Project Cost Rs.37 Lacks.
  • Turnkey Interior Fit out Work including Fixed
    Moveable Furniture for 20 Nos. Rooms at Park
    Hotel, Kolkata with SPCMG, Kolkata.
  • Period of Execution May08 to September08
  • Project Cost Rs. 1.16 Crore.

17
List of Few Projects Executed and Handed Over
  • Design Turnkey Execution with Services
  • Design Turnkey Interior Decoration including
    Modular Furniture, Electrical, PHS Work etc.- for
    M/s. Lotus Herbal (P) Ltd. B-9, Sector 58,
    Noida, UP.
  • Period of Execution July08 to October08
  • Project Cost 60 Lacks.
  • Complete Interior Finishing Job for 8000 Sq. ft
    floor area at Corp. Office of Videocon Industries
    Limited. 296,Udyog Vihar, Phase II, Gurgaon,
    Haryana.
  • Period of Execution Nov08 to January09
  • Project Cost 72 Lacks.
  • Complete Interior Finishing Job for 22000 Sq.ft
    Comprising Two Floor for Corp. Office of Datacom
    Solutions Pvt. Ltd., a Videocon Group Company.
    248, Udyog Vihar, Phase IV, Gurgaon, Haryana.
  • Period of Execution December08 to May09
  • Project Valued 1.54 Crore
  • Design Complete Interior Fit out Project for
    New Conference for ATLAS CYCLE (Haryana) Limited
    at Sahibabad, UP Plant Office Independent
    Management Office Block at Sonepat, Haryana Plant
    Office Including All the Moveable and Fixed
    Furniture, Electrical, PHS.
  • Period of Execution July09 to Nov09
  • Project Valued 41.76 Lacks

18
List of Few Projects Executed and Handed Over
  • Design Turnkey Execution with Services
  • Complete Turnkey Execution of Interior Decoration
    and Fit out Project for New MEN STUDIO ( 700
    Sq.ft) for AZA Fashions Pvt. Ltd. Mumbai (Brand
    Promoter for Designer Collations of Karan Johar,
    Manish Malhotra, Sabyasachi etc.) at G-5,
    Crescent at the Qutab (Designers Mall), at Lado
    Sarai, New Delhi with HVAC, Electrical, PAS,
    Loose Fixed Furniture, Glass Work Including All
    the Moveable and Fixed Furniture, Electrical,
    Networking Backup.
  • Period of Execution March10 to April10
  • Project Valued 18 Lacks

19
Present Involvement
  • Design PMC
  • For Hotel Ramada Palace, Khajuraho Suites
    BAR.
  • Designing and Turnkey Execution of Interior Fit
    out Projects
  • Client ISTS INFOTECH Pvt. Ltd. C-111, Sector
    63, Noida, UP.
  • Scope of Work Complete Design, planning and
    execution of Interior Fit Out for the area 6000
    Sq.ft. with all services i.e. PHS Work, Package
    Air Conditioning with Duct, PAS, Fire Fighting
    Work, Electricals, Networking Server, Access
    Control System along with all MODULER Furniture,
    Pre- fabricated Building System made Cafeteria at
    Roof Top .
  • Project Duration October 2010 to January2011.
  • Project Cost 1.08 Crore.
  • Client Dwarkadhish Projects LTD. / DDF
    Consultants Pvt. Ltd. Delhi
  • Scope of Work Turnkey execution of Interior Fit
    Out for 4800 Sq.ft area at with all services i.e.
    PHS Work, Package Air Conditioning with Duct,
    PAS, Fire Fighting Work, Electricals, Networking,
    Access Control System along with all MODULER
    Furniture.
  • Project Duration January 2011 to March 2011
  • Project Cost 90 Lacs

20
List of Client
  • Mr. Niloj Acharya, Dir. BCML, Delhi.
    919810063183
  • Mr. Piyush Tomer , Mgr. Adm. ISTS Infotech,
    Noida.
  • Mr. S.Biswas, Director SPCMG, Eastern region
    Kolkata - 03323580789
  • Mr. Sudip Choudhary Regn. Director EDIFICE,
    Delhi. 01126464551

21
List of Plants Machineries
  • Leveling Instruments 1 No.
  • Gas Cutting Set 2 No.
  • Pumps 2 No.
  • Diesel Generator 1 No.
  • Stone Cutting Machine 5 No.
  • Welding Machine 2 No.
  • Hand Grinding Machine 12 No.
  • Floor Grinding Polishing Machine 4 No.
  • Wood Cutting Saw 6 No.
  • Wood / Board Cutting Machines with Platform 4
    No.
  • Board Cutting Hand Machine 6 No.
  • Hammer Drill Machine 4 No.
  • Drill Machine 4 No.
  • Chain Pulley Block (1 to 10 Ton) 2 No.
  • Stone Cutter Hand Machine 18 No.
  • Router Machine 8 No.
  • Compressor 4 No.
  • Quantity of the above mentioned equipments
    machineries are not

22
(No Transcript)
23
(No Transcript)
24
(No Transcript)
Write a Comment
User Comments (0)
About PowerShow.com