Title: Mid-Atlantic Regional Maintenance Center Overview
1Mid-Atlantic Regional Maintenance Center Overview
CAPT Larry Olsen Deputy Commander MARMC 16 June
2004
2Maintenance Initiatives
- SHIPMAIN the maintenance process
- Waterfront Integration the organization
- NEMAIS the tool (SAP)
3Why SHIPMAIN?
- Address current maintenance and modernization
challenges - Lack a common process and single process owner
- Excessive handoffs across multiple organizations
- Unclear accountability for results
- Funding administration uncertainty cause
churn - High Premiums paid in execution cost due to
inefficient upkeep planning - Excessive spending on ALTS designed and procured,
but not installed
4SHIPMAIN Goals
- Install a common planning process for surface
ship maintenance and modernization - Increase the efficiency of the process without
compromising its effectiveness - Install a disciplined management process with
objective measurements - Institutionalize the process and a continuous
improvement method (JFMM feedback)
5SHIPMAIN Philosophy
- Minimize Growth and New Work (GNW) through
better planning and earlier MSR involvement. - Implement a Maintenance Figure of Merit (MFOM)
approach to prioritize maintenance. - Change the culture to effectively reduce
premiums paid by managing GNW.
6SHIPMAIN
- CFT-1 Requirements
- CFT-2 Package Preparation
- CFT-3 Placement and Oversight
- CFT-4 Alterations and Modernization
7CFT-1 Requirements
- Maintenance Teams focal point
- Planning Board for Maintenance
- One-step work brokering and screening
- Prioritized 2Ks Maintenance Figure of Merit
- Continuous flow of 2Ks to MSR
- Auto screening of ICMP 2Ks
- ICAVs provide electronic 2Ks
- Metrics, metrics, metricsmore metrics
8What is a Maintenance Team?
Commanding Officer
Project Manager
Port Engineer
Contractor Representative
Ship Supervisor
(Not yet completely in place)
9Ship Maintenance Teams
- Primary responsibilities Focused on a Specific
Ship - Identify and prioritize required work IAW
consistent MFOM validity and accuracy - Determine when and where work items will be
accomplished - based on business practices that
reduce cost - Match resources to prioritized requirements
- Oversee availability execution
Small cross-functional team executes planning and
oversees execution
10CFT-2 Package Preparation
- Master spec catalog
- Establish reusable specifications
- Provides template for new specs
- Package prepared by executing activity
- Robust feedback for new specs and cost returns
11CFT-3 Placement and Oversight
- Coordination of MT and Contractor
- Continuous Technical Advisory Reports
- Govt estimates not required
- Multi-Ship/Multi-Option (MSMO) contracts
- Flow of maintenance items between CNO and
continuous maintenance availabilities - RMCs control funding
12CFT-4 Alterations and Modernization
- All ALTS through same process
- Two Types Program (K) Fleet (D)
- Mission and BG Interoperability focus
- Hierarchical decision making model
- Prioritized list ALT Figure of Merit
- Engineering/BCA filters applied before extensive
development of an ALT
13Waterfront Integration
- Fleet initiative
- Combines RSG, SIMA, FTSCLANT and SUPSHIP
Portsmouth - All RMCs (non-shipyard) similar
- Mid Atlantic (Norfolk)
- South East (Mayport)
- South Central (Ingleside)
- South West (San Diego)
- Personnel reductions achieved through attrition
14Waterfront Integration
- Goals include
- Eliminate redundancy
- Standardize processes both regionally and
nationally - Implement the SHIPMAIN entitled process
- Reduce reimbursable work gtgt mission funded
- Somewhat more difficult in Norfolk due to
complexity, geography, market and density
15627 personnel 16 military 456 govt civilian
155 contractors
1,851 personnel 1,782 military 68 govt
civilian 1 contractor
3,573 personnel 2,117 military 1,071 govt
civilian 385 contractors
1,016 personnel 267 military 527 govt
civilian 222 contractors
79 personnel 52 military 20 govt civilian
7 contractors
16MARMC Organization
EXECUTIVEDIRECTOR
WATERFRONTOPERATIONS
PRODUCTION
CONTRACTS
ENGINEERING
INFORMATIONTECHNOLOGY
BUSINESSOFFICE
COMMAND SUPPORT SVCS
LOGISTICS
17NEMAIS
- NAVSEAs solution for ship maintenance
- Somewhat cumbersome at present
- U-NNPI Certification in progress
- Evaluating additional NEMAIS seats for MA-RMC
functions - Need support while awaiting convergence
18ISSUES
- No layoffs
- Optimal Manning on surface ships PMS
- Reimbursable work for FTSCLANT
- Shift from FFP to MSMO contracts
- Four unions to negotiate with
- Surface ship maintenance in the MED/GULF
19AND MORE ISSUES
- Connectivity and AIS
- 500 instructions to merge
- JFMM update
- Funding churn
- Lots of moving parts
20