Royal Andina RBS - PowerPoint PPT Presentation

1 / 199
About This Presentation
Title:

Royal Andina RBS

Description:

Version 2.0 ... RBS Aplications Construction Process Specifications and Construction details – PowerPoint PPT presentation

Number of Views:121
Avg rating:3.0/5.0
Slides: 200
Provided by: azemblaca
Category:
Tags: rbs | andina | royal

less

Transcript and Presenter's Notes

Title: Royal Andina RBS


1
General
RBS Aplications
Construction Process
Specifications and Construction details
Approvals and Certifications
Royal Andina kits
Royal Building System
2
1.1. Company-Policies 1.2. Products
Lines 1.3. RBS Construction System 1.4.
Properties and Advantages 1.5. Construction
Process 1.6. Construction Process-Video 1.7.
Institutional Video
General
3
Royal Andina S.A.
We are a company dedicated to make PVC panels and
profiles to offer a variety of solutions for the
construction field. Our products are made with
Canadian technology and excellent quality. From
our plant in Cartagena we attended the Andina
market, Central America and the Caribbean. Our
best reference is the testimony of our costumers
and our projects since 1997. Our commitment is
simple complete satisfaction to our costumers.
We provide the ideal solution even for the most
demanding projects.
4
Royal Andina Central and South America
5
PRODUCT LINES
RBS CONSTRUCTION SYSTEM
Window Systems
6
RBS Construction System
The RBS system is made from PVC panels ready to
assembly for any type of project. Depending on
the project, the width or thickness could be less
than 100 mm or 64 mm. Reinforced concrete filling
for permanent construction or reinforced metal
frame for reusable constructions.
7
RBS Construction System
64mm System
64mm System Basic Module
Connector Panel
100mm System Basic Module
Panels
Connector
100 mm System.
Versatile and easy to project
8
Product properties
  • Durable
  • Waterproof
  • Ignífuge and self-extinguishable
  • UV protection
  • Aseptic
  • Corrosion resistant (oxide), salinity, chemical
    and microorganisms
  • Homogeneous quality

9
Advantages of RBS System
  • Quick On site Assemblyn
  • Acoustic and thermal insulation
  • Resistant to extreme weather condiions
  • Rodent/Pest Resistant
  • Can be designed to handle earthquake and
    hurricane conditions
  • Finished
  • Adjust to any design
  • Easy to maintain clean
  • Compatible with others constructions
  • Long-Term Durability Will not rust, corrode,
    flake, peel or rot!

Condominium after hurricane Michelle, built with
RBS System, October 2001
10
Building Preparations
Walls filled with concrete
Walls filled with steel bars
11
2.1. Social Housing 2.2. Private Housing 2.3.
Education 2.4. Health 2.5. Industry and
Commerce 2.6. Camps 2.7. Hotels 2.8.
Military Installations 2.9. Other applications
RBS Aplications
12
Social Housing
13
Social Solutions for the community
The properties and advantages of the RBS system
offer an optimal alternative for the construction
of social housing
Worthy High quality Finished Lasting and
Comfortable Waterproof and UV protection remains
stable over time.
14
Advantages
RBS SYSTEM
TRADITIONAL
Finished remains stable over time
15
Advantages
La Habana, Cuba
The durability of the materials can be seen when
you compare our products with others
16
Advantages
RBS SYSTEM
TRADITIONAL
Better finishes
17
Advantages
RBS SYSTEM
TRADITIONAL
The System doesnt crack after the construction
is settles down
18
Housing
  • 24 units of 42 Sqm.
  • 12 years built

Houses, Cartagena, Colombia
19
Housing
  • 50 units
  • 65 Sqm.

Social Housing, Curacao
20
Housing
  • 120 apartments
  • 45 Sqm.

Tirima Project, Venezuela
21
Housing
  • 150 units
  • 60 Sqm.

House in Venezuela
22
Housing
  • 200 units
  • 100 Sqm. area

House in Santa Lucía,Venezuela
23
Housing
  • 300 units
  • 62 Sqm.

House in Isla Margarita, Venezuela
24
Housing
  • 80 units
  • 65 Sqm.

Engineer houses, Changuinola, Panamá
25
Housing
  • 56 Sqm. houses

Condominium project, Rep. Dominicana
26
Housing
Apartments, La Habana, Cuba
27
Housings
Las Lomas, México
28
Housing
Condominium project, St. Marteen
29
Private Housing
30
Housing
House in San José, Costa Rica
31
Housing
House in San José, Costa Rica
32
Housing
House in Cajicá, Colombia
33
Housing
House, Colombia
34
Housing
Country house, Rionegro, Colombia
35
Housing
La Arena house in Isla Del Rosario, Colombia
36
Housing
Summer house, Medellín, Colombia
37
Education
38
Education
  • Infrastructure for educational areas
  • The RBS system adapts to both rural and urban
    areas temporarily or permanently
  • Rapid execution
  • Quality of materials
  • Low cost and low maintenance
  • Fixed cost
  • Adapts thermally to regional climates
  • In addition, the RBS system provides an integral
    finish for immediate use, and allows to
    incorporate other finishes highlighting the sense
    of the community for the educational areas.

39
Education
School in Buenos Aires (Citibank), Quibdó,
Colombia
40
Education
School in Buenos Aires (Citibank), Quibdó,
Colombia
41
Education
Schools (Citibank), Providencia, Colombia
42
Education
El Divino Niño school (Citibank), Marinilla,
Colombia
43
Education
Pedagogic unit, Cota, Colombia
44
Education
UNICEF Emilio Carvajal school, Buenaventura,
Colombia
45
Education
Ferrostal school , Palonegro, Quindio, Colombia
46
Education
Santa Maria Micaela school Adoratrices , Armenia
Hermanitas de la Anunciación, Calarcá
Several projects, Quindío, Colombia
47
Education
Plan Padrino school, B/ventura, Colombia
48
Education
School Fundación Pies Descalzos, Bogotá,
Colombia
49
Education
Paujil school, Caquetá, Colombia
50
Education
OIM Timbiquí rural school, Cauca, Colombia
51
Education
OIM Divina Pastora, Cucutá, Colombia
52
Education
Classroom , Nueva Granada school, Bogotá, Colombia
53
Education
San Miguel school, La Calera, Colombia
54
Education
Los Pinos school, Bogotá, Colombia
55
Education
Universidad Del Norte, Barranquilla, Colombia
56
Education
University classrooms, México
57
Education
Schools, México
58
Education
Coliseum, USA
59
Health
60
Advantages of RBS System
The materials used by the RBS system, offer
construction free of mold and low
maintenance. The thermal and acoustic
characteristics of the RBS system provides
comfort in any climate regardless of geographical
location
61
Health
Medical center in Acacias, Meta, Colombia
62
Health
Hospital in Bahía Solano, Colombia
63
Health
Cafesalud Medical center, Bogotá, Colombia
64
Health
Red Cross, La Tebaida, Colombia
65
Health
Administrative offices COACEMED, México
66
Health
Computer center COACEMED, México
67
Industry and Commerce
68
Construction Process
2. Walls panels
1. Foundation
3. Metal or concrete structure
69
Construction Process
4. Wall assemble
5. Section hoisted
6. Union between sections
70
Proceso Constructivo
Contraflambeos para nivelar los largueros en
grandes luces
La frecuencia de los refuerzos se determina según
la zona eólica
Largueros
Aspecto muro instalado
Detalle fijación muros a estructura
71
Construction Process
7. Hydraulic Inst.
9. Cover structure
8. Electric Inst.
11. Finishes
10. Roofing
72
Industry
Prince Plastics plant, Canadá
73
Industry
Agricultural Warehouse, USA
74
Industry
Biofilm plant 13.000 Sqm, Colombia
75
Industry
El Trébol, industrial warehouse, Colombia
76
Industry
Lime warehouse, Bogotá, Colombia
77
Industry
Refisal, Cartagena, Colombia
78
Industry
Minipak plant, Colombia
79
Industry
Warehouse project
80
Industry
Several projects, North America
81
Industry
Innovatec offices, Cali, Colombia
82
Agriculture Industry
Dairy farms, Canadá
83
Commerce
Supermarket Olímpica, Colombia
84
Commerce
Ford Sales Center, México
85
Camps and Accommodations
86
RBS CONSTRUCTION SYSTEM
IT DOESNT MATTER WHERE YOU NEED US,
WELL BE THERE
We will be there!
87
Construction Process
1. FOUNDATION
2. PLATE
3. INSTALLATIONS
5. WALL ASSEMBLE
4. WALL STRUCTURE
6. FRAMES INSTALLATION
Floor and walls assemble systems
88
Construction Process
7. HYDRAULIC INST.
9. COVER STRUCTURE
8. ELECTRIC INST.
10. ROOF ASSEMBLE
11. FINISHES
Installations, roofing and finishes
89
Camps
Pluspetrol camp, Pisco, Perú
90
Camps
Trompeteros project, Perú
91
Camps
Yanacocha, Perú
92
Camps
Camisea project, Perú
93
Camps
Airport project, Arequipa, Perú
94
Camps
Houses in Changuinola, Panamá
95
Camps
Military camps, Colombia
96
Camps
Houses for the Army, Melgar, Colombia
97
Camps
Cerrejón, Guajira, Colombia
98
Camps
Conconcreto Camps, Medellín, Colombia
99
Hotels
100
Hotels
Los Delfines Hotel, San Andrés Isla, Colombia
101
Hotels
Fiscal Hotel, Cuba
102
Hotels
Nitana Hotel, Coveñas, Colombia
103
Hotels
Morritts Grand Resort, Islas Cayman
104
Military Installations
105
Military Installations
Administrative office, the Fourth military
division, Colombia
106
Military Installations
Hangar in Juanchaco, Colombia
107
Military Installations
Cotecmar hangar, Colombia
108
Military Installations
Gasur control tower, Colombia
109
Camps
Military camps, Colombia
110
Camps
Army housing, La Macarena, Colombia
111
Housing
Fiscal homes, Turbo, Colombia
112
Other Applications
113
Otther Applications
Prodesa sales center, Colombia
114
Other Applications
Carwash, Canadá
115
Other Applications
Gas stations, Brasil
116
Other Applications
Offices, Bogotá - Colombia
117
Other Applications
Oxicol offices, Cartagena, Colombia
118
Other Applications
Construction in flood zone, Panamá
119
Other Applications
Portable toilet, Colombia
120
Other Applications
Portables toilets, Argentina
121
Other Applications
Booth Royal Andina Expoconstrucción, Bogotá,
Colombia
122
Other Applications
Church in Bolívar, Colombia
123
Other Applications
Refrigerators, Colombia
124
Other Applications
Swimming pools, Colombia
125
Other Applications
Swimming pools, Colombia
126
Other Applications
Several
127
RBS Construction Process
3.1. Concrete walls 3.2. Empty walls with
metallic structure
128
Content
3.1.1 System description 3.1.2 64 mm and
100 mm systems 3.1.3 Preliminaries 3.1.4
Foundation 3.1.5 Plan location 3.1.6 Walls
assemble 3.1.7 Installations 3.1.8 Steal
reinforcements 3.1.9 Wall bracing 3.1.10
Frames installation 3.1.11 Concrete
placement 3.1.12 Flooring plates 3.1.13 Roof
Installation
3.1. Concrete walls
129
RBS CONSTRUCTION SYSTEM
The RBS system is made from PVC panels ready to
assembly for any type of project. Depending on
the project, the width could be less than 100 mm
or 64 mm, reinforced concrete filling for
permanent construction or reinforced metal frame
for reusable constructions.
130
64 and 100 mm Systems
64 mm SYSTEM
64 mm SYSTEM Basic Module

Connector Panel
100 mm SYSTEM Basic Module
Panels
Connector
100 mm System
131
Preliminaries
The structural design of the floor tile is the
same as any other system, it is made base on the
weight capacity of the floor.
The electric, hydraulic and sanitary
installations including the steel reinforcement
must stay inside the walls
Preparation of the ground and installations
132
Preliminaries
The PVC profiles must be placed according to the
size on the construction site, this will be
warranty The best performance.
Royal material download to the construction site
133
Foundation
Plate detail
RBS WALLS
GUÍDE
GUÍDE
The foundation must be well level
REINFORCING STEEL BAR
ANCLAJE DE VARILLAS
PLATE
FOUNDATION
134
Replanteo Muros
DEMARCACION MUROS
Imprescindible uso de la cimbra para asegurar la
posición de los muros y la colocación de las
guías.
Placa lista para la colocación de los paneles de
muros
135
Ensamble Muros
IDENTIFICACIÓN PIEZAS
Empresa
Proyecto
Tipo de Panel
Longitud del Panel
Todos los elementos que componen un kit están
marcados y en el plano se especifica su ubicación.
136
Walls assembly
137
Ensamble Muros
  • La verticalidad de las juntas deberá revisarse al
    plomar los muros en uno y otro sentido.
  • Es conveniente contemplar la escuadra de los
    muros.

EJEMPLO DE MAL PLOMADO DE MUROS
EJEMPLO DE VERTICALIDAD DE ESTRÍAS ENTRE PANELES
Y CONECTORES
EJEMPLO DEL TRAZO DE ESCUADRA
138
Ensamble Muros
  • Ya completo el armado de los muros se procede a
    la nivelación y plomado de los mismos verificando
    las escuadras que se deben tener entre muros y
    entre losa de piso y muros.

VISTA EN PLANTA
VISTA EN ALZADO
MURO ROYAL
MURO ROYAL
ESCUADRA
5
4
LOSA DE PISO
90
90
3
MURO ROYAL
139
Hydraulics Installations
140
Electric Installations
Installation of switch and outlet boxes
141
Steel Reinforcements
Depending of structural design, ¾ or ½ rod are
used as vertical or horizontal reinforcement.
142
Shoring walls
Wood or metal angles are used to shore walls,
windows and doors
143
Placement of frames
See detail A
See detail C
Detail A
See detail B
  • The andino frame can be placed inside the
    connector panel or over it.
  • The frames can be placed before or after filling
    the walls.

Detail B
Detail C
144
Wall Bracing
Metal funnel to avoid wasting the concrete.
Brace with pump
145
Shoring walls
Roof anchors
Cleaning the walls with water
146
Mezzanine Plates
Plate system with blocks
Flooring plates for more than two floors
147
Mezzanine Plates
Plate system with Steeldeck
Solid Plate
148
Roof installation
Placement of the ridge beam on the walls axis
Placement of the beam anchor
Enlarged picture of the RBS beam and roof anchors
Roof anchors
149
Roof Installation
Once the connectors are aligned in place, procede
to present the panels, which will slide between
connectors .
150
Roof Installation
Ventilation lid is placed
Place lid Se procede a colocar
la tapa de cumbrera caballete
Ridge Installation
151
Roof Installation
Roof with clay tile
Roof with andina tile
TILES ALTERNATIVES
152
3.2.1. Floor assemble system3.2.2. Wall
assemble system3.2.3 Frame installation3.2.4.
Installations3.2.5. Roof structure3.2.6.
Assemble of roof and finishes
  • 3.2. Empty walls with
  • metal structure

153
Construction process
1. BASE SUPPORT
2. BASE OR PLATE
3. INSTALLATIONS
Floor assemble system
154
Construction Process
4. WALL STRUCTURE
5. WALLS ASSEMBLE
Walls assemble system
155
Construction Process
6. FRAMES INSTALLATION
Frames for doors and windows
156
Construction Process
7. HYDRAULICS INST.
8. ELECTRIC INST.
Installations
157
Construction Process
9. ROOF STRUCTURE
Roof structure
158
Construction Process
10. ROOF ASSEMBLE
11. FINISHES
Roof assemble and finishes
159
Specifications and detailes of construction
160
Approvals and Certifications
5.1. Fire resistant (English) 5.2. Fire
resistant 5.3. Chemical resistant 5.4.
Structural resistance of 64mm 5.5. Acoustic
resistance of 100mm 5.6. Balistic testing 5.7.
Maintenance technical guide 5.8. Tool list
161
Royal Andina Kits
6.1. Housing kits 6.2. Institutional Kits
162
6.1.1. Labrador house - 15 sqm6.1.2. Montana
house - 27sqm6.1.3. La Inés house - 36
sqm6.1.4. Paraiso house 39 sqm6.1.5. La
Cabaña house- 42sqm6.1.6 Verano house - 46
sqm6.1.7 Caribe house - 52 sqm6.1.8. La
Calera house 60sqm6.1.9. Lebrija house - 70
sqm6.1.10 Palmeras house120sqm
  • 6.1. Housing Kits

163
Labrador house 15 Sqm
164
Labrador house 15 Sqm
165
Montana house 27 Sqm
166
Montana house 27 Sqm
167
La Inés house 36 Sqm
168
La Inés house 36 Sqm
169
Paraíso house 39 Sqm
170
Paraíso house 39 Sqm
171
La Cabaña house 42 Sqm
172
Verano house 46 Sqm
173
Verano 46 Sqm
174
Caribe house 52 Sqm
175
Caribe house 52 Sqm
176
La Cabaña 42 Sqm
177
La Calera house 60 Sqm
178
La Calera house 60 Sqm
179
Lebrija 70 Sqm
180
Lebrija house 70 Sqm
181
Palmeras house 120 Sqm
182
Palmeras house 120 Sqm
183
6.2.1. Lodging of - 81 Sqm6.2.2. Service
module of 36 Sqm6.2.3. Administration module
of 48 Sqm6.2.4. Large classroom of 48
Sqm6.2.5. Bathroom set of 24 Sqm6.2.6
Classroom module 2 of 74 Sqm6.2.7 Classroom
module 3 of 110 Sqm6.2.8. Educational
classroom module 4 Set Bathrooms6.2.9.
Módulo Educativo 6 AulasBat. Baños
  • 6.2. Institutionals Kits

184
Lodging of 81 Sqm
185
Lodging of 81 Sqm
186
Service module of 36 Sqm
187
Service module of 36 Sqm
188
Administration module of 48 Sqm
189
Administration module of 48 Sqm
190
Large classroom of 48 Sqm
191
Large classroom of 48 Sqm
192
Bathrooms set of 24 Sqm
193
Bathrooms set of 24 Sqm
194
Classroom module 2 of 74 Sqm
195
Classroom module 2 of 74 Sqm
196
Classroom module 3 of 110 Sqm
197
Classroom module 3 of 110 Sqm
198
Módulo Educativo 4 AulasBatería Baños
199
Módulo Educativo 6 AulasBatería Baños
Write a Comment
User Comments (0)
About PowerShow.com