Title: Computer Generated Reports
1Computer Generated Reports
2AIMS
- Challenge Your Current Reporting Process
- Improve Your Understanding of Computer Generated
Reports - Identify Opportunities Products
- Manage the Changing Process
3Challenge
- Master Document
- Auto text
- Template
- Data Capture System
4Master Document
- Multiple selections included in template.
- Roof
- The mortar bed and pointing to the ridge capping
is cracked and requires re bedding and pointing. - Approximately ____ tiles are cracked and should
be replaced. - Visible deflection was noted to the roofline over
the ______ elevation. For more detail, see
section under "Attic Roof Timbers". - The pitch of the roof over ____ is inadequate.
This may allow wind driven rain penetration and
remedial action is required. - The metal roof is rusting and requires repair or
replacement. - Impact damage noted to ______ will need repair or
replacement is required.
5Master Document
Final report excludes unwanted items. Roof The
mortar bed and pointing to the ridge capping is
cracked and requires re bedding and
pointing. The metal roof is rusting and requires
repair or replacement.
6Auto Text
Inserts pre defined text automatically. Part of
the text is entered and computer prompts a pre
set entry. Showe? ?The shower recess was
tested and found to be leaking. To correctly
repair a leaking shower recess would involve
removing the floor tiles, wall tiles and wall
linings (where applicable), appropriately
waterproofing the area or fitting a shower tray.
Walls should then be re-lined (if necessary),
re-tiled and the floor re-tiled. As a guide only,
the cost to repair a leaking shower is upward
from 1,500.00 plus the purchase price of tiles.
The shower recess was tested (Press ENTER to
insert)
7Template
Sub Floor Ventilation Ventilation is
important to minimise infestation by timber pests
and preventing damp problems. It is considered
that ventilation in this property is
Inadequate Adequate Good Not Applicable
8Data Capture
9Report Process
Inspect Building
10Report Process - Revised
Inspect Building
11Plotting Your Position
- Paper report format photocopy/carbon copy
issue fax/mail - Checklist rework to PC proof edit issue
print/fax/email/mail - Checklist phone office w/details proof edit
issue print/fax/email/mail - Dictaphone - rework to PC proof edit issue
print/fax/email/mail - Handheld PC Synchronise to PC - edit issue
print/fax/email/mail
12Whats Available - Direction
Systems available generally fall into two
categories
- Word bases templates
- Rapid
- RSA
- Electronic infield collection
- 3D Inspection Reports
- Temisoft
13Next Generation
- Beyond -------------------------------- 21st
Century - Wearable PC Voice activation Instant heads-up
review Virtual tour Real time online report.
14Questions?
15Revision Instrument
- What two tasks are computers generally used you?
- Repetitive tasks and Storage of data
- What items can a computer perform to assist
report generation? - Add Commentary, Extract Summary and Format
Report - Can you still use a check list in the field and
in conjunction with computer generated reporting? - Yes
- What are the two systems available in the market?
- Word document based systems
- Electronic infield data collection systems
- What electronic device is used to record
information infield and later synchronised to the
report? - PDA
16Presentation Evaluation