Title: Managing Energy Costs
1MMA Annual ConferenceJanuary 11 12, 2008
2Introduction to session
- Eileen McHugh
- Division of Energy Resources
- eileen.mchugh_at_state.ma.us
- (617) 727-4732
- www.mass.gov/doer
3Energy Management Services
- Promote and deliver cost-effective energy
efficiency outcomes
4Information
- www.mass.gov/doer
- Energy Management Services
5Speakers
- Phil Giudice
- Leo McNeil
- Doreen Hamilton
- Mike Ryan
- Bill Gran
6Phil GiudiceCommissioner, DOER
7Very high electric prices
MA
Source EIA
8Lots of GDP for the BTU and good trend
MA
CA
US
Source EIA/Census
9Lots of GDP for the BTU
MA
Source EIA/Census
10Efficiency is low cost option
Spot Wholesale
Efficiency
Source DOER
11Efficiency provided 4 TWh 2006
GWh
Source DOER
12Municipal Energy spending
Source US Census building floor space and elec
intensity suggests 1,490,000 MWh W/WW often
equals all other muni electotal muni
consumption inferred 2,980,000 MWh _at_ 0.14 per
kWh 75 million therms natural gas 34 million
gallons oil
13Municipal electric savings opportunity
Saving 23
Source efficiency savings range from 10 20
depending on vintage 3 million MWh _at_ 60 load
factor 200MW peak capacity providing 100 MW of
DR potential commodity savings range from 10 -20
from traditional practices
14Better Energy Decision Challenges
- Status quo too readily accepted
- Reconsider energy investment screens
- Payback required go deep and broad for long
term payback - Risk tolerance real time markets
- New technology/practices DR, Performance Ctc
- Insufficient data historic, end use and
projections - Insufficient expertise and staffing
15- Enable MA PV market to grow 40 per year to
achieve 250 MW by 2017 - First installment 68 million over 4 years 16
for public facilities, 8 for residences 27 MW by
end of 2011 - Streamlined non-competitive rolling rebate
- Rebate level generally 40 of PV system (can be
20 to 60) up to 500 kW - Launch on 1/23
16Priorities
- Decouple remove hurdles to efficiency, CHP,
distributed generation stand by rates, net
metering - Efficiency ramp remove spend cap and tap
innovation - Building codes
- Appliance performance standards
- Green communities
- Accelerate renewables long term contracts,
siting, CommSolar - Make RGGI work
- Consider rate alternatives real time price,
public policy
Other suggestions?
17Leo McNeilRegional Director Comprehensive
Solutions Trane
18Enabling Legislation
- Two Options available for Cities, Towns,
Schools - 25A,11C Enacted 1994 Approximately 25
projects in cities, towns, school districts
implemented - 25A,11I Enacted 2006 1 project completed, and
at least 7 more in process at this time (several
others actively evaluating the process currently)
19Streamline the Process
- Optimize Infrastructure and Budgets(Over 15B
nationally since 1990) - Eliminate Barriers
- Local Budgets Strained
- Aging Infrastructure
- Scarce Capital Dollars
- Increased Awareness
20Old vs. New
- Old
- RFP
- Design Development
- Ten Year Term
- Expensive Cumbersome
- New
- RFQ
- Qualifications Experience
- Twenty Year Term
- Saves Time Money
21Sample RFQ Scoring Sheet
22MMA letter of support
- This provision is particularly important now
because performance contracting would allow
communities to move forward immediately to
implement these projects in a timely and
efficient manner reducing energy consumption at a
time when costs are skyrocketing. - Massachusetts Municipal Association 11/7/05
23Its Easy Being Green
- Publish Bid
- Evaluate Responses and Select ESCO
- Negotiate Agreement
- Technical Energy Audit
- Project Scope Guarantee
- Execute Agreement Proceed
- Facility Upgrade
24Doreen HamiltonAccount Executive, Honeywell
25What is Performance Contracting?
- Performance contracts install energy efficient
facility improvements, with no up front cost,
paid for out of guaranteed energy savings from
your existing operating budget.
26Energy Services Company
ESCo
Develop
Maintain
Design
Finance
Construct
27Performance Contracting
- A way to finance and implement facility
improvements and services - Energy and operating savings sufficient to cover
all project costs - A bundled set of retrofit, service, OM, and
Energy Management Services - Performance-based Guarantee
28Performance ContractingCore Components
- Technical
- Financial
- Contractual
29Technical
- Lighting
- Lighting controls
- Motors replacement
- Energy management system installation and
optimization - Variable frequency drives
- Hot water reset
- Control valves for boilers
- Water conservation
- Plug load controls (including PCs)
- Boiler replacement
- Green/renewable technologies
30Financial
- Where does the money come from?
- Existing budget neutral
- Energy
- Maintenance
- Capital improvement
- Rebates and incentives
- Municipal Lease or Other
31 The Savings Buckets
Maintenance
Technology
Technology Infrastructure Upgrades
Facilities Infrastructure Upgrades
Communications
Utility
Operational Budget
Capital Budget
Project Funding
32How is it paid for?
33Contractual
- How can you buy this?
- How do we measure success?
- Guarantees
- When do you start to pay?
- What happens if.?
- Hotter/Colder
- Energy prices change
- Add buildings
- Eliminate buildings
- Schedule changes
34Mike RyanDirector of Buildings Construction
Quincy
35Quincy Project
- Getting Started-Assembled a Team
- Decided on the RFQ process
- Inserted the energy data, buildings, etc. into
the RFQ - Published the RFQ in the Central Register
- Simplified the Process did not use outside
consultants
36What happened next?
- Received 5 proposals
- Interviewed 4 vendors on two occasions
- Rated the proposals based on references, ability
to implement, service training, based on the
criteria in the RFQ. - Selected Honeywell
- In-depth engineering study of 42 buildings over 3
months - Resulted in 32M project with numerous
infrastructure improvements.
37What did we get?
- 9 new Boiler Plants
- Over 18,000 lighting fixtures impacted
- Water Conservation through toilets, urinals,
sinks, etc. - 1,300 Steam trap repair/replacement
- Commercial Water meter replacement
- Window replacements at 6 City buildings
- Exterior doors at 5 City 2 School Buildings
- Overhead Doors in all Fire Department Buildings
- Building re pointing
- Pool Cover
- Solar Pool Heating
- Boiler Controls
- City Wide Energy Management System
- New Roofs for 6 buildings
- Transformer replacements
- Numerous other mechanical upgrades including unit
ventilator HVAC replacements, etc.
38What else did we get?
- Program is self funding over the 20 year term
- Energy Savings are 1,007,000 per year
- Operational Savings of 240,000 per year
- Water revenue increase
- Electricity will be reduced by 25, fuel usage by
27, and water usage by approximately 35. - Utility Rebates from Keyspan, MTC and others
- Financed through a Tax Exempt Lease
- All buildings will be impacted
- Provide preventative maintenance
- Improve the environment
39Impacts for the Program Term
- Partnership with the EPA-The City of Quincy is
also partnering with Honeywell and the EPA to
provide Energy Benchmarking for all facilities - City of Quincy has signed on for the Energy Star
Challenge - Buildings are being analyzed for Energy Star
Status - Emission reduction
- The electricity saved will reduce carbon dioxide
emissions by 2,862,600 lbs/yr, - The ozone depleting gas emissions will be reduced
by 16,900 lbs/yr - The reduced fuel consumption will reduce carbon
dioxide emissions by 3,126,400 lbs/yr
40Impacts for the Program Term
41Equivalent Impact forProgram Term
- 440 Passenger Cars off road
42Equivalent Impact forProgram Term
- 825 planted acres of trees
43Bill Gran
44FranklinRegional Council of Governments
45Municipalities Estimated Financing Potential
46Population of Participating Towns
47Chronology of FRCOGs Performance Contracting
Process
- April 26, 2007 DOER Seminar
- July 26, 2007 Presentation to FRCOG Governing
Council. - September 13, 2007 STAM Performance Contracting
Presentation - September 25, 2007 FRCOG Performance Contracting
Presentation - November 1, 2007 FRCOG Meeting
- RFQ Finalized.
- December 19, 2007 RFQ Advertized
- January 9, 2008 FRCOG ESCO Meeting.
- February 8, 2008 ESCO responses to RFQ due.
48Informational Flier
- What is Energy Saving Performance Contracting?
- Statutory Basis
- What kinds of improvements are allowed?
- Contract Scope and Duration
- Financing
- Guaranteed Savings
49Statement of Interest Form
- At the FRCOG Council meeting on July 26, Energy
Saving Performance Contracting was presented as
an opportunity for our member municipalities to
make energy saving improvements to their
facilities, including schools, without the need
to take on any debt. The improvements can be
paid for by the guaranteed savings resulting from
the energy saving improvements, and the savings
are guaranteed by the Energy Service Company
(ESCO) selected to perform the work. See reverse
side for a brief summary of the program. - If your town is interested exploring this
opportunity, please sign this form and return to
the FRCOG at 425 Main Street, Suite 20,
Greenfield, MA 01301 or email to wgran_at_frcog.org. - Yes we are interested in Energy Saving
Performance Contracting. - ________________________________
- Name of Municipality
- ________________________________
- Signature of Municipal Official
50ANNUAL FACILITY ENERGY COST USE FORMS
51Participating Municipalities
52Participating RSDs
53Municipalities Total Energy Costs
54RSD Schools Total Energy Costs
55Municipalities Estimated Financing Potential
56Regional School Districts Estimated Financing
Potential
57Total of all Municipalities RSDs