Title: Food Purchasing Control
1Food Purchasing Control
- HRT 276 Chapter 4
- Part II Food Control
2Thanks to
- The information in this presentation comes from
Chapter 4 - Principles of Food, Beverage, and Labor Cost
Controls - By Paul R. Dittmer
- 7th Edition. 2003. New York John Wiley Sons
3Introduction to Part II
- Purchase
- Receive
- Store
- Issue
- Produce
- Sell Serve
4Introduction
- Purchasing decisions are driven by these key
components - Menu
- Product specifications
- Purchase method
- Product forecasting
- Other factors
- Budgeted food cost goal
- Labor and type of service
- Equipment, storage space, and layout of facilities
5Purchasing The key factors
- Menudetermines needs
- Product specificationsdetermines quality
- Purchase methoddetermines price and supplier
- Product forecastingdetermines quantity
6Responsibility for Purchasing
- Manager, Chef, Steward
- The book uses the steward
- The primary issue in this step is to limit
purchasing to one person if possible
7The Control Process (from Ch. 2)
- Establish standards and procedures
- Train
- Monitor performance
- Take appropriate action
- With people
- With products
8Definitions
- Perishables
- Comparatively short shelf life or useful life
- Think fresh purchased for immediate use
- Its a quality thing in most cases
- Can be more costly and more wasteful
- Non-perishables
- Comparatively longer shelf life
- Do no deteriorate as rapidly if stored closed and
at proper temperatures
9Standards Developing Standards
- The primary purpose of establishing control over
purchasing is to ensure a continuing supply of
products - In sufficient quantities
- At the appropriate quality for its intended use
- Purchased at the most favorable price
- Standards dictate
- Quality
- Quantity
- Price
10Standards Establishing Quality
- Before the first purchase, one must determine
- Type of food (menu-based decision)
- Quality of food (market-based decision)
- Brand
- Size
- Packaging
- Grade
- Degree of freshness
- Other
11Standards Establishing Quality
- To produce meals of desired and consistent
quality, then the raw products must be of desired
and consistent quality - STANDARD PURCHASING SPECIFICATION
- Commonly abbreviated SPS
- These specifications dictate quality
12Standards Establishing Quality
- SPS
- Establishes exact requirements in advance
- Useful in menu preparation and development
- Help eliminate misunderstandings between steward
and purveyors (vendors) - When distributed to more than one purveyor,
competitive bidding is possible - Limit or eliminate verbal descriptions each order
- Aid in proper receiving
13Standards Establishing Quantity
- Principles are based primarily on useful life of
the product - Perishable
- Non-perishable
- Other considerations
- Projected business volume
- Storage
- Financial desires (cash-on-hand vs. on-shelf)
- Purveyor minimums (quantity or value)
14Standards Terms and considerations
- Storage locations
- Permanent locations / Limited Locations
- Shelf tags and labels
- FIFO
- Bin Cards
- Computerized assistance
15Standards Establishing Quantity
- Perishables
- Par or Par Stock
- Minimum vs. maximum vs. always on-hand
- Defined for our use as the quantity of any
item required to meet anticipated demand in some
specific upcoming period of time - The par level is established using historical
information (remember the assumptions!) - Volume projections may dictate that more than
normal is needed.
16Standards Establishing Quantity
- Ordering Perishables
- The par (standard for quantity) is established
and used in calculating the needed purchase
amount - Steward conducts a daily physical inventory (or
at least a physical observation) - Par is sometimes called a build-to value
- So, par is what we need
- Inventory is what we actually have
- Order is the difference between par and actual
- More may be ordered as par can be considered a
minimum
17Standards Establishing Quantity
- Ordering Perishables (continued)
- Stewards Market Quotation List (figure 4.2)
- For all purveyors holding the SPS for
perishables, daily quoting is possible (price
issue)
18Standards Establishing Quantity
- Non-Perishables
- Par methods can be used
- The par level is established using historical
information - Storage is a greater issue as the time period
between orders may be longer - Issues
- Storage / Permanent Location
- Theft
- Waste FIFO
- Labor for maintenance
19Standards Establishing Quantity
- Ordering Non-Perishables
- Periodic Order Method
- Amount required for upcoming period 40
- - Amount presently on hand - 12
- Amount wanted on hand at the end of the 15
- period to cover needs until the next delivery
- Amount to order 43
- Ideally, physical inventory is used to determine
on-hand amounts
20Standards Establishing Quantity
- Ordering Non-Perishables
- Perpetual Order Method
- It is like a check book (In, Out, Balance)
- Requires some type of tracking
- Perpetual Inventory Cards (not bin cards)
- Paper or Computer
- Reorder Point - the amount at which a new order
is placed - Reorder Quantity the amount ordered regularly
once stock reaches the reorder point
21Standards Establishing Quantity
- Ordering Non-Perishables (continued)
- Perpetual Order Method
- Par stock 32
- - Reorder Point - 15
- Subtotal 17
- Normal usage until delivery 10
- Reorder quantity (minimum needed) 27
- Note that the standardized Reorder Quantity is
24, so a determination of number of cases is
needed (case may be 6, 12, 24 of each item)
22Standards Establishing Price
- Quality what to buy
- Quantity how much to buy
- Price how much to spend
- Factors
- Quality / Market segment
- Quantity / Economies of Scale
- Seasonality of product
- Location
- Availability of more than one purveyor
23Standards Establishing Price
- Price Quote
- Daily
- Longer (bulk buying, commitments, etc.)
- Methods
- Phone
- Fax
- Email / Web / Direct On-line Links with Purveyor
- Salesperson
- Mail
24Standards Establishing Price
- Perishable
- Daily
- Weekly
- More than one purveyor is likely
- Non-Perishable
- More likely one primary purveyor and one back-up
- Individual items may vary between purveyors, but
keep the big picture in mind
25Training for Purchasing
- Training of the Purchaser
- Formal education
- On-the-job training
- Owner / Manager
- Purveyors / Food Shows / Specialized training
- Use of SPS and other Standards
- Use of general policies and procedures regarding
the operation that relate to purchasing - Knowing the other steps in the flow of food
26Monitoring Purchasing
- Purchasing
- Standard Purchase Specifications (SPS)
- Monitor purveyor performance
- Monitor purchaser performance
- Who does what?
- Owner / Manager works with purchaser (steward)
- Both Owner or Manager and Steward monitor SPS and
purveyors - Steward must have two-way communication with the
receiver
27Taking Corrective Action
- With Purchaser
- Further training and development
- Re-training
- Discipline
- By Purchaser
- Contact with salesperson
- Contact with purveyor directly
- Any variation from standards must be
investigated people or product
28Purchasing Centralized Purchasing
- Needs of individual operations (units) are
consolidated to a central location - Total needs are purchased
- Purchased items be distributed to individual
operations by the purveyor or by the company
(central location)
29Purchasing Centralized Purchasing
- Advantages
- Volume pricing
- More choice of purveyors may lead to better
quality - SPS more likely to be met
- Larger inventories can lead to more reliable
supply - The possibilities for dishonest purchasing in
individual units are reduced
30Purchasing Centralized Purchasing
- Disadvantages
- Restricts individual unit operators freedom
- Selection (variety)
- Needs (timing)
- Individual unit operators can not take advantage
of local specials - Limits individual menu variations
31Purchasing Standing Orders
- Delivery without order
- Specific quantity on a set day
- Building an item up to a specified level
- Convenient
- Possible waste or excessive cost
32Purchasing Computer Applications
- Simple
- Excel
- Database
- HOH only
- More complex
- HOH and FOH communication
- May include
- Recipes
- Labor