Title: Integrated Stave Electrical and Assembly
1Integrated Stave Electrical and Assembly
- ATLAS Upgrade Workshop
- December 2007
- H.Chen, J.Kierstad, Z. Li. D. Lissauer, D. Lynn,
Y.Semetzvidis - Brookhaven National Laboratory
- R.P. Ely, M.Gilchriese, C.Haber, B.Leung, T.Phung
- Lawrence Berkeley National Lab
- Anu Tuononen (Polytecnic Kuopio), Giulio Villani,
Marc Weber - Rutherford Appelton Lab
- Vitaliy Fadeyev, Jason Nielsen
- SCIPP UC Santa Cruz
2Prototypes and Designs
60 cm, 9 cm strip, 6 segments/side
Stave-06
1 meter, 3 cm strip, 30 segments/side 192 Watts
(ABCD chip), 2.4 Xo support structure
6 x 3 cm, 6 chips wide
Stave-07
Build and test
Study
1 meter, 2.5 cm strip, 40 segments/side 200-250
Watts (_at_0.25 W/chip) 1.9 2.2 Xo support
10 x 10 cm, 10 chips wide
Stave-08
3What Has Been Done
- Prototypes fabricated and studied
- New DAQ system for multi-module tests
- Stave-06
- Stave-07
- Transmission lines
- Designs and concepts
- Bus cables and signal distribution for Stave-08
10 x 10 - Material estimates
- Bridged hybrid
- Module overide and failure bypassing
4New Stave Test DAQ
- A bench top system easily configured for parallel
testing large numbers of modules - Use off-the-shelf PXI based DAQ cards from
National Instruments - PXI-656X 16 channels of LVDS I/O, multiple card
system - 160 Mb/s system
- Significant on-board memory/channel 2,16, or 128
Mb/channel - But no hardware histogramming
- Software StaveDAQ contains all the existing SCT
tests - Noise interference and external trigger tests
included - Configurable framework to handle any combination
of components, multiple cards - Reporting, data access, and comparison tools
10-20-30 module system
5StaveDAQ 6 chip plots
S-curve
Threshold scan
Strobe delay
VT50 Gain Out noise In noise
Performance vs channel _at_0.5 fc
6Stave-06
- Stave-06 results have been presented at the 2006
Hiroshima and IEEE NSS meetings and published. - Good noise performance was demonstrated.
- Noise interference was studied
- Serial powering LVDS multidrop demonstrated on
6 modules/hybrids - Stave-06 studies at LBL and RAL
7Stave-07
- The fabrication of Stave-07 (3 cm strip, DS) is
underway - Mechanical parts are ready (see Gils talk)
- Hybrid is ready
- 1st module fabricated and under study
- Assembly fixtures have been fabricated
- Final fabrication is bus cable, design complete
- Develop assembly and test procedure/fixtures,
production-like - Goal is to have results for April 2008 review
- Electrical performance
- Mechanical and cooling
- Assembly experience leading to work and time
estimates for production - Cost and effort models
8Development of Hybrid for Stave-07
- Integrate 6 ABCD plus serial power, LVDS AC
coupling - 63.54 x 15 mm on 375 micron BeO substrate
- Components sized to hold off gt 150 volts
- HV filtering and bypass
- Integrated into full stave bus cable design
- Redundant connections for testing
AC gnd
AG-MOD
HV Gnd
HV in
AV-MOD
9Hybrid Design and Test
Analog current
Ground layer
Analog power
Power layer
Digital power
LVDS section
Serial power section
10Module Assembly and Test Fixture
Evolve a single fixture for assembly, bonding,
inspection, and test.
11Bus Cable
Data Readout 1/hybrid
Serial current return
Clock Command lines
Serial current link
HV distribution
12Bus Cable Geometry and Impedance
Materials Al foil 2mil, Dupont LF0100, Shinetsu
CA333 2 mils, Cu 18 um, Kapton 1 mil, Adhesive
2
Al
1
ADHESIVE
1
1
0.7
Cu
1
KAPTON
1
CF
gtgtMatches measured impedance
Couple this to further measurements see
J.Nielsen talk of 12/11
13Specific Goals of Study
- Performance on standard SCT tests
- Noise interference
- Behavior of serial powering with large number of
modules - HV bypass, coupling, in serial system
- Clock and command distribution, transmission
performance - Input to ABC-next design
If the Stave-07 program is successful and the
community wants to proceed in this general
direction then Stave-08 would follow but this
should be a broader effort. In the meantime we
would do limited studies related to Stave-08
14Stave-08 Options and Studies
- Mechanical/thermal study showed that bridge and
hermeticity are options - Hybrid/Module
- If we glue directly to silicon we want a low e
dielectric substrate - BeO thick film was a readily available choice
for Stave-07 - If we bridge then other considerations can
dominate - Material, cost, thermal
- Kapton copper may be a more natural choice,
even for direct gluing on silicon - Less material
- Easier to connect to bus cable?
- For direct glue still use a BeO substrate below
kapton - Glue-on-silicon study can this be done in a
definitive way? - Consideration of electrical failure recovery and
bypassing - Bus Cable
- Natural impedance is in the 65-75 ohm range
- How should TTC be distributed? Multidrops
- Do we need to zig-zag traces to minimize
coupling? - How thick should the shield be? How should
shield be grounded? - Wirebond or direct connections?
15Design of Bus for 10 x10 Sensors
If diagonal lines not required have 40 open
space
16Material
- Contribution of mechanical core cooling 0.4
(Gils talk) - Consider BeO hybrids on surface and KaptonCC
bridge - Include all electrical components
- Hybrids
- Chips
- Discrete components
- Bus cables
- BeO on surface 2 x 0.89 1.8 ( mechanical)
2.2 - Kapton CC 2 x 0.75 1.5 (mechanical)
1.9 - Support cylinder not included
17Stave Review Considerations
- With a review in 4-2008 all information will be
based upon - Design studies
- Stave-06, 07 experience
- Process of addressing review panels detailed list
- Specifics
- Xo
- Bridge / no Bridge
- Electrical performance
- Tracking performance
- Radial plane separation, stereo measurement
- Alignment
- Hermeticity
- Cost
- Assembly procedure and tooling
- Repair
- Compatibility with forward designs
- Special materials and processes
18Required Information
- Stereo measurement precision (16mm(rf), 500mm(z)
max separation between planes?) - Need to describe here how the precision is
maintained over the full tracking volume
(assembly precision, survey, stability,
monitoring, alignment) RESPONSE description of
measurement, tooling, QA, process. - Readout and electronics based on system
architecture document consistent with options
under evaluation. Supply details of - Grounding scheme RESPONSE description of bus
cable for serial and DC-DC. - Powering scheme(s) RESPONSE key aspect of RD
underway - Monitoring RESPONSE factor into design of bus
cable - Compatibility with reuse of existing services
- Requirement for any new services to be detailed
RESPONSE common to all schemes - Radiation qualification of all materials and
assemblies. Describe qualification measurements
RESPONSE qualification of adhesives, carbon
materials, issue of direct gluing to silicon - Compatibility with trigger requirements - rf
position of strips known to
19Performance Information
- Material per tracking layer in radiation lengths
including - Module/stave 1.9 2.4
- Overlaps to achieve hermeticity below see
mechanical talk, determined by bias ring width - Attachments to external support structure
assumed support structure TBD - Attachments to cooling, the cooling pipe
including connections none, embedded, issue of
coupling to external is common - Electrical connectors and intermediate services
independent - Hermeticity of each layer i.e. fraction of tracks
fully measured if overlaps then common to all
schemes, otherwise need to calculate - Precision achieved for the whole tracker
- Thermal run-away margin see mechanical /
cooling
20Risks Electrical Assembly
- Identify components which are single-source
limited sources for hybrids BeO or Kapton - List components or assembly steps which need to
be developed or qualified - Front side gluing
- Are electrical connections wirebonded, soldered,
or connectors? - Assembly process needs to further developed and
qualified - How deep is the assembly pipeline? level of
prototyping effort required to fully validate
design? Would clearly have to build full-scale
prototype(s) for electrical performance and
alignment - Risk due to tight mechanical tolerances during
assembly Moderate, similar to past experience - Grounding shielding risks key aspect of the
electrical study, bus cable, HV and bypass - Options available for repair i.e. the risk of
damage being unrepairable. - Module/stave damaged during shipping or testing
Replace module or toss out - Module/stave damaged during assembly to
structures Replace module or toss out - Flexibility or options to modify the design based
on experience with ATLAS. - Could the material be reduced further? And at
what cost? Only if granularity is reduced - Could additional measurement layers be
introduced? Sure - Are there options to improve grounding and
shielding? Increase bus cable shield, various
grounding options are included in prototyping - Other technical, schedule or financial risks
- Design of bus cable and signal transmission
issues - Need to decide on number of TTC, data lines
- Bridge or No-Bridge, effect of glue on silicon
21Summary Conclusions
- Steady program of measurements, prototypes, and
design study - Look forward to key measurements from Stave-07
- Serial powering with 30 steps
- Signal transmission
- Electrical performance, grounding and shielding
- Valuable inputs to production, assembly basis,
cost estimates - Have addressed some key concerns raised by the
community - Repair
- Hermeticity
- Bridge
- Embedding this work in Review Committee framework
- Clear program for future work if this is a good
direction