Enforcement Case EC 05030 - PowerPoint PPT Presentation

1 / 9
About This Presentation
Title:

Enforcement Case EC 05030

Description:

Enforcement Case EC 05-030. Respondents: Tassinari Family Trust. Investigator: Nicole Libby. Enforcement Case EC 03-030. Location: Franklin County. Salem Township ... – PowerPoint PPT presentation

Number of Views:47
Avg rating:3.0/5.0
Slides: 10
Provided by: Galbr
Category:

less

Transcript and Presenter's Notes

Title: Enforcement Case EC 05030


1
Enforcement Case EC 05-030
  • Respondents
  • Tassinari Family Trust
  • Investigator
  • Nicole Libby

2
Enforcement Case EC 03-030
  • Location
  • Franklin County
  • Salem Township
  • Lot 40.2 of Plan 01

3
Enforcement Case EC 05-030
  • Summary of Violations
  • Reconstructed pre-Commission stream impoundment
    without a permit
  • Filling Grading in excess of Standards
  • Clearing Vegetation in excess of Standards

4
Enforcement Case EC 05-030
  • According to Tassinari, the dam and stream
    impoundment existed prior to 1971
  • Tassinari indicates that he has periodically
    worked on the dam over the years to maintain it

5
Enforcement Case EC 05-030
  • In 2005, Tassinari cleared vegetation along the
    stream, and conducted filling grading to armor
    and rebuild the deteriorating impoundment and
    channelize a section of stream.

6
Enforcement Case EC 03-030
  • According to MDIFW biologists, fish passage in
    the stream is negatively affected by the dam,
  • and by two improperly installed water crossings
    downstream of the dam

7
Enforcement Case EC 05-030
  • One hung culvert is located on Tassinaris
    property, but is pre-Commission
  • A second set of hung double culverts is located
    just downstream on a neighboring property

8
Enforcement Case EC 05-030
9
Enforcement Case EC 03-030
  • Terms of Settlement
  • Implementation of a remedial action plan
    approved by, and under the supervision of MDIFW
    to
  • replace/reset the improperly installed metal
    culvert downstream of the impoundment
  • Install several small in-stream rock deflectors
    to restore fish cover and create small pools and
    eddies in the disturbed locations of the stream
  • Plant a well distributed stand of trees, shrubs
    and ground cover along the cleared areas near the
    stream channel to re-establish a vegetated
    buffer
  • Constraints on the operation of the dam gate to
    improve fish passage.
  • Payment of 1,000 penalty (penalty reduced in
    consideration of respondents financial
    circumstances and voluntary replacement of
    pre-Commission water crossing).
  • Staff is also working with the neighboring
    property owner to have the plastic water crossing
    culverts just downstream of Tassinari properly
    reset .
Write a Comment
User Comments (0)
About PowerShow.com