Title: Capitan Municipal Schools
1Capitan Municipal Schools
Presented by Capitan School Board
2Continuing the Legacy
- The past support and investment of the citizens
within the Capitan Schools community is evident
in the quality of graduates from Capitan Schools
and the quality of the campus. From the
dedication of the staff to the bold decisions of
past Board members to the support the surrounding
community, Capitan Schools have been very
fortunate. Because of you, we have the
infrastructure and tools that provide the
up-to-date facilities needed to prepare our
students for the future.
3Benefits From Approving the 2008 Bond
- Provide a safe environment
- Provide an environment that enhances student
learning - Take care of existing structures (your past
investments) - Provide an educational campus that will attract
families moving into our community - Implement a facility management plan that is
designed for the long term - Foster pride in this wonderful institution
4How the Bond Monies Will Be Used
- The first priority that these monies will give
us is an environment that will maximize our
childrens learning potential. - The needs by school area are as follows
- Elementary Nurses office HVAC
- Middle School Computer Lab HVAC
- High School Science Lab Lighting HVAC
- Support Facilities Cafeteria Upgrade and
Re-model Cummins Gym Re-Model Traylor
Multi-purpose facility ceiling and locker rooms
upgraded - Continuing the Legacy
5Elementary
- Heating, Ventilation and Cooling System
- Re-locate and construct new office for school
nurse
Middle School
- Heating, Ventilation and Cooling System
- Computer Lab
High School
- Heating, Ventilation and Cooling System
- Science Lab
- Lighting upgrade
6Support Facilities
- Cafeteria expanded and upgraded with improved
storage, electrical capacity, fire suppression,
and equipment - Cummins Gym floor perimeter re-done, locker
rooms, bathroom facilities and concession area
addressed - Ceiling in Traylor multi-purpose facility and
acoustic issues addressed - Locker rooms refurbished in Traylor facility
7Cummins Gym
- Floor replacement in gym
- Restroom Re-model
- Locker Room Re-model
- Engineering study
- Foundation
- Concrete
- Heating and Ventilation
8Traylor Multi-Purpose Facility
- Cafeteria Up-grade and Re-model
- Storage
- Fire Suppression
- Electrical
- Equipment
9Traylor Multi-Purpose Facility
- Locker Rooms
- Refurbished
- Tiled
- Gym
- Ceiling Replaced
- Acoustical Needs Addressed
- HVAC
10HVAC
- Geo Thermal Heat Pump
- Make Up Air
11(No Transcript)
12Capitan Municipal Schools
Tax Rate Impact
136 Million Election in 2008
14Capitan Municipal Schools
Tax Rates
15History of Tax Rates
16Comparison of Surrounding Schools Tax Rates
17Comparison of Surrounding Schools Tax Rates
182006 Tax Bill
192007 Tax Bill
20Conclusion
- Your support and commitment to Capitan Schools
- Support curriculum and instruction in a healthy
and secure environment - Continued support of the creation of an
Educational System - Continue to invest in our childrens future
- Provide an educational campus that will attract
families moving into our community - Take care of existing structures
21Capitan Municipal Schools
Presented by Capitan School Board