Capitan Municipal Schools - PowerPoint PPT Presentation

1 / 21
About This Presentation
Title:

Capitan Municipal Schools

Description:

Locker rooms refurbished in Traylor facility. Cummins Gym. Floor ... Locker Room Re-model. Engineering study. Foundation. Concrete. Heating and Ventilation ... – PowerPoint PPT presentation

Number of Views:100
Avg rating:3.0/5.0
Slides: 22
Provided by: capitanm
Category:

less

Transcript and Presenter's Notes

Title: Capitan Municipal Schools


1
Capitan Municipal Schools
  • Continuing the Legacy

Presented by Capitan School Board
2
Continuing the Legacy
  • The past support and investment of the citizens
    within the Capitan Schools community is evident
    in the quality of graduates from Capitan Schools
    and the quality of the campus. From the
    dedication of the staff to the bold decisions of
    past Board members to the support the surrounding
    community, Capitan Schools have been very
    fortunate. Because of you, we have the
    infrastructure and tools that provide the
    up-to-date facilities needed to prepare our
    students for the future.

3
Benefits From Approving the 2008 Bond
  • Provide a safe environment
  • Provide an environment that enhances student
    learning
  • Take care of existing structures (your past
    investments)
  • Provide an educational campus that will attract
    families moving into our community
  • Implement a facility management plan that is
    designed for the long term
  • Foster pride in this wonderful institution

4
How the Bond Monies Will Be Used
  • The first priority that these monies will give
    us is an environment that will maximize our
    childrens learning potential.
  • The needs by school area are as follows
  • Elementary Nurses office HVAC
  • Middle School Computer Lab HVAC
  • High School Science Lab Lighting HVAC
  • Support Facilities Cafeteria Upgrade and
    Re-model Cummins Gym Re-Model Traylor
    Multi-purpose facility ceiling and locker rooms
    upgraded
  • Continuing the Legacy

5
Elementary
  • Heating, Ventilation and Cooling System
  • Re-locate and construct new office for school
    nurse

Middle School
  • Heating, Ventilation and Cooling System
  • Computer Lab

High School
  • Heating, Ventilation and Cooling System
  • Science Lab
  • Lighting upgrade

6
Support Facilities
  • Cafeteria expanded and upgraded with improved
    storage, electrical capacity, fire suppression,
    and equipment
  • Cummins Gym floor perimeter re-done, locker
    rooms, bathroom facilities and concession area
    addressed
  • Ceiling in Traylor multi-purpose facility and
    acoustic issues addressed
  • Locker rooms refurbished in Traylor facility

7
Cummins Gym
  • Floor replacement in gym
  • Restroom Re-model
  • Locker Room Re-model
  • Engineering study
  • Foundation
  • Concrete
  • Heating and Ventilation

8
Traylor Multi-Purpose Facility
  • Cafeteria Up-grade and Re-model
  • Storage
  • Fire Suppression
  • Electrical
  • Equipment

9
Traylor Multi-Purpose Facility
  • Locker Rooms
  • Refurbished
  • Tiled
  • Gym
  • Ceiling Replaced
  • Acoustical Needs Addressed
  • HVAC

10
HVAC
  • Geo Thermal Heat Pump
  • Make Up Air

11
(No Transcript)
12
Capitan Municipal Schools
Tax Rate Impact
13
6 Million Election in 2008
14
Capitan Municipal Schools
Tax Rates
15
History of Tax Rates
16
Comparison of Surrounding Schools Tax Rates
17
Comparison of Surrounding Schools Tax Rates
18
2006 Tax Bill
19
2007 Tax Bill
20
Conclusion
  • Your support and commitment to Capitan Schools
  • Support curriculum and instruction in a healthy
    and secure environment
  • Continued support of the creation of an
    Educational System
  • Continue to invest in our childrens future
  • Provide an educational campus that will attract
    families moving into our community
  • Take care of existing structures

21
Capitan Municipal Schools
  • Continuing the Legacy

Presented by Capitan School Board