Title: Best Practices


1
Best Practices
  • CS4320
  • Fall 2002

2
A technology digression
The space shuttle
3
What are best practices?
  • Good practice comes from experience, and
    experience comes from bad practice.
  • Fred Brooks

a technique or methodology that, through
experience and research, has proven to reliably
lead to a desired result.
4
Rational Best Practices
  • http//www.rational.com/media/whitepapers/rup_best
    practices.pdf
  • Develop software iteratively
  • Mange Requirements
  • Use component-based architectures
  • Visually model software
  • Verify software quality
  • Control changes to software

5
Evaluate Best Practices
  • Potential reduction of schedule
  • Improvement of project visibility
  • Effect on development risk
  • Improved use of resources
  • Improvement in quality
  • Chance of success

6
Some best practices we already discussed.
  • Change Board (Configuration Control Board) 17
  • Evolutionary Delivery 20
  • Evolutionary Prototyping 21
  • Inspections 23
  • Joint Application Development 24
  • Lifecycle Model Selection 25
  • Spiral Lifecycle Model 35
  • Theory-W Management 37
  • Throwaway Prototyping 38
  • Top Ten Risk List 41

7
Daily Build and Smoke Test
  • Build product every day
  • Smoke test each build (fry when turned on?)
  • Reduces Risks
  • Integration
  • Low quality
  • Poor visibility (90 done problem)
  • Improves
  • Morale
  • Visibilty
  • Customer relations

8
D-B-S Process
  • Create build group
  • Add code to build when it makes sense
  • Make developers responsible for own smoke test
  • Keep holding area for code added to build
  • Create penalty for breaking build
  • Release builds each morning
  • Build and smoke even under pressure

9
Miniature Milestones
  • Fine-grained project tracking
  • Useful for project recovery activities
  • Useful with daily build and smoke
  • Trades more project tracking for more visibility
    and control
  • Think of pioneers going west using landmarks

10
M-M Process
  • Start early
  • Let developers create own milestones
  • Keep them mini (1-2 days)
  • Make them binary
  • Make them exhaustive
  • Use only for short-term planning
  • Assess progress and recalibrate

11
Signing Up
  • Tries to increase motivation of developers
  • Makes it their project (module, class )
  • Risks
  • Increase inefficiency
  • Reduce visibility
  • Reduce talent pool
  • Burnout

12
Sign Up Process
  • Frame a vision
  • Give developers a choice
  • Sign up at team level
  • Empower team
  • Dont use if requirements shaky
  • Monitor mistakes
  • Watch developer workload

13
Timebox Development
  • Create a sense of urgency during coding
  • Redefine product to fit schedule
  • Usually for in-house software
  • Have to be willing to cut features
  • Risks
  • Sacrifice quality instead of features
  • Use on inappropriate projects
  • Need to use with prototyping
  • Clarify feature priorities

14
Timebox Process
  • Create prioritized list of features
  • Create realistic schedule
  • Map features to schedule
  • Select right kind of project (60-120 days)
  • Get end-user involved