Title: Government of Karnataka
1Government of Karnataka
BANGALORE METROPOLITON REGIONAL DEVELOPMENT
AUTHORITY
BANGALORE METROPOLITON REGIONAL DEVELOPMENT
AUTHORITY
Presentation on
Satellite Towns Ring Road, Intermediate Ring
Road, Radial Roads Townships
in
Bangalore Metropolitan Region
June 2006
2BMRDA Projects
BMRDA Proposes development of Trunk Road Network
Five Townships in BMR Region
- BMR Satellite Town Ring Roads
- Connecting Towns located around Bangalore City
- BMR Intermediate Ring Roads
- Connecting Industrial Residential Developments
located around Bangalore City - BMR Radial Roads
- Radiating from Bangalore City Connecting BMR
Satellite Town Ring Roads BMR Intermediate
Ring Roads - BMR Townships
- Five Townships are proposed around Bangalore
3Salient Features of BMR Ring Roads
- The Bangalore Metropolitan Region Intermediate
Ring Road Satellite Ring Road are proposed for
integrated and comprehensive traffic flow with
National Highways, State Highways, Major District
Roads Ring Roads. - It is a 180 Km/hr High Speed Corridor with
adequate traffic and road safety provisions. - Geometrical improvements to existing alignment
are proposed, such as improvements to horizontal
vertical curves in the BMR-Ring Roads. - Grade separators Interchanges are proposed at
the junction of National Highways, State Highways
Major District Roads. - Two lane service roads 7.5M on either side are
proposed for catering to domestic traffic.
4Salient Features of BMR Ring Roads
- Eco-friendly Multipurpose barrage- cum- bridges
are proposed in the Bangalore Metropolitan
Region- Ring Roads (at Ramanagara Kanakapura
area) - All towns are proposed for bypass. The Bypass
roads are integrated with NH bypasses, SH
bypasses town Ring Roads, etc. - The width of the median proposed is 10M to 15M
BMR-Ring Roads, in order to provide Metro/Mono
Rail in course of time. - Multi Level eco-friendly avenue plantations are
proposed on Medians and on either sides of Ring
Roads, to protect the environment. - Provisions are made for carrying utilities, OFC
Cables, Sanitary Line, Telephone Cables, Electric
Cables etc. - The total length of BMR Ringroads is 784 kms
Initially 4 lane upgraded to 8 lane road. - The estimated cost is Rs. 2650 crore (as per IRC
specifications).
5Length Area details of BMR Ring Roads
6General Details of Satellite Towns Ring Road
7General Details of Intermediate Ring Road
8General Details of Radial Roads
9- Survey work for BMR Ring Roads in
- progress to be completed by end Oct 2006
- A Transparent process of inviting Global Bids to
be adopted for selection of private partner /
developer.
10BMRDA Townships
11Salient Features of BMRDA Townships
- BMRDA TOWNSHIPS are independent, self-contained
eco-friendly integrated townships. - BMRDA TOWNSHIPS incorporate industrial
residential establishments, promoting work - home
culture. - BMRDA TOWNSHIPS are connected by BMR Ring Roads
with a proper access to NH, SH, Railway Stations
Airport. - BMRDA TOWNSHIPS will have independent Air-strips
Helipads in 100 acres of land, to cater to
limited domestic air traffic needs.
12Salient Features of BMRDA Townships
- Recreational facilities - Golf Course, Club
houses, Malls. - BMRDA TOWNSHIPS are eco-friendly forest, lakes
tanks, natural valleys, hillocks etc., are
protected, preserved developed. - BMRDA TOWNSHIPS have wide internal road network,
with power, water supply, sanitation, etc. - Speciality (a) Waste water recycling (b)
Solid waste management.
13Salient Features of BMRDA Townships
- Bidadi, Ramanagar Sathanur townships located on
southern Bangalore will have access to BMICP
corridor through Bidadi, Ramanagara Channapatna
interchange - BMRDA TOWNSHIPS have complete provision for
health, education, tourism recreation. - BMRDA TOWNSHIPS are proposed in the limits of 85
villages having 79,000 population. These villages
will be adopted by BMRDA for integrated
comprehensive development.
14Salient Features of BMRDA Townships
- BMRDA will also take up the integrated
comprehensive development of towns located on BMR
Ring Roads BMRDA Townships out of revenue
generated from Townships Projects - Water Supply Rejuvenation of Tanks, Rainwater
harvesting, Recycling - BWSSB would provide minimum per capita 70 lpd
potable water. Additional requirements to be met
by ground water / recycling. - Power Supply would be arranged by KPTCL
15STRR,IRR,Radial Ring RoadBMRDATOWNSHIPS
16BMRDA Townships Land proposed to be acquired
In Acres
Note- I Acre 4040 Sq. Mtrs
17BMRDA Townships - Utilization of Land
- 50 of the area is proposed to be utilized for
open spaces and civic amenities like Roads,
Parks, Playgrounds etc - Balance 50 of the area is proposed to be
parceled out into large plots of 50 / 100 / 200
acres etc for further development into
residential / commercial industrial zones
through multiple secondary developers
18Approach
- First project at Bidadi through bid route other
projects through SPV Public Private Partnership
mode - Lands would be acquired initially through KIADB
later by BMRDA itself - Aim Development of integrated work live
infrastructure and not merely creating plots - Master Plan to be prepared by Private Partner /
SPV - BMRDA shall provide handholding assistance for
obtaining the approvals of the various regulatory
authorities
19Approach
- Thematic townships
- Alternative modes of compensation to land losers
would also be explored - The Private Partner shall finance develop the
entire internal project infrastructure including
for water and power supply - BMRDA shall provide external infrastructure
including access roads, water power up to the
periphery through BWSSB and KEB (KPTCL) - BMRDA shall provide bulk solid waste management
facility outside the township
20Approach
- Selection of the Private Partner through open
global tendering process - Foreign firms to participate either through an
Indian subsidiary or through a JV/Consortium with
Indian firms and would be subject to the relevant
FDI norms/regulations - Private Partner shall welcome monitoring of
project progress by BMRDA to ensure compliance
with the project objectives - Project Implementation Period is expected to be 2
years and Realisation Period, 5 years
21Approach
- BMRDA shall use the surplus generated from the
Township Project for development of BMR Region
through projects for - - Development of road / metro / mono rail networks
etc - Development of the existing towns and villages
falling within the project area and its immediate
surroundings - Greening of the BMR
22Phasing of the Projects
- Ramanagara, Sathanur, Solur and Nandagudi to be
takenup thereafter in phases
23Thank You