Government of Karnataka - PowerPoint PPT Presentation

1 / 23
About This Presentation
Title:

Government of Karnataka

Description:

... 10M to 15M BMR-Ring Roads, in order to provide Metro/Mono Rail in course of time. ... Speciality : (a) Waste water recycling & (b) Solid waste management. ... – PowerPoint PPT presentation

Number of Views:801
Avg rating:3.0/5.0
Slides: 24
Provided by: Pav57
Category:

less

Transcript and Presenter's Notes

Title: Government of Karnataka


1
Government of Karnataka
BANGALORE METROPOLITON REGIONAL DEVELOPMENT
AUTHORITY
BANGALORE METROPOLITON REGIONAL DEVELOPMENT
AUTHORITY
Presentation on
Satellite Towns Ring Road, Intermediate Ring
Road, Radial Roads Townships
in
Bangalore Metropolitan Region
June 2006
2
BMRDA Projects
BMRDA Proposes development of Trunk Road Network
Five Townships in BMR Region
  • BMR Satellite Town Ring Roads
  • Connecting Towns located around Bangalore City
  • BMR Intermediate Ring Roads
  • Connecting Industrial Residential Developments
    located around Bangalore City
  • BMR Radial Roads
  • Radiating from Bangalore City Connecting BMR
    Satellite Town Ring Roads BMR Intermediate
    Ring Roads
  • BMR Townships
  • Five Townships are proposed around Bangalore

3
Salient Features of BMR Ring Roads
  • The Bangalore Metropolitan Region Intermediate
    Ring Road Satellite Ring Road are proposed for
    integrated and comprehensive traffic flow with
    National Highways, State Highways, Major District
    Roads Ring Roads.
  • It is a 180 Km/hr High Speed Corridor with
    adequate traffic and road safety provisions.
  • Geometrical improvements to existing alignment
    are proposed, such as improvements to horizontal
    vertical curves in the BMR-Ring Roads.
  • Grade separators Interchanges are proposed at
    the junction of National Highways, State Highways
    Major District Roads.
  • Two lane service roads 7.5M on either side are
    proposed for catering to domestic traffic.

4
Salient Features of BMR Ring Roads
  • Eco-friendly Multipurpose barrage- cum- bridges
    are proposed in the Bangalore Metropolitan
    Region- Ring Roads (at Ramanagara Kanakapura
    area)
  • All towns are proposed for bypass. The Bypass
    roads are integrated with NH bypasses, SH
    bypasses town Ring Roads, etc.
  • The width of the median proposed is 10M to 15M
    BMR-Ring Roads, in order to provide Metro/Mono
    Rail in course of time.
  • Multi Level eco-friendly avenue plantations are
    proposed on Medians and on either sides of Ring
    Roads, to protect the environment.
  • Provisions are made for carrying utilities, OFC
    Cables, Sanitary Line, Telephone Cables, Electric
    Cables etc.
  • The total length of BMR Ringroads is 784 kms
    Initially 4 lane upgraded to 8 lane road.
  • The estimated cost is Rs. 2650 crore (as per IRC
    specifications).

5
Length Area details of BMR Ring Roads
6
General Details of Satellite Towns Ring Road
7
General Details of Intermediate Ring Road
8
General Details of Radial Roads
9
  • Survey work for BMR Ring Roads in
  • progress to be completed by end Oct 2006
  • A Transparent process of inviting Global Bids to
    be adopted for selection of private partner /
    developer.

10
BMRDA Townships
11
Salient Features of BMRDA Townships
  • BMRDA TOWNSHIPS are independent, self-contained
    eco-friendly integrated townships.
  • BMRDA TOWNSHIPS incorporate industrial
    residential establishments, promoting work - home
    culture.
  • BMRDA TOWNSHIPS are connected by BMR Ring Roads
    with a proper access to NH, SH, Railway Stations
    Airport.
  • BMRDA TOWNSHIPS will have independent Air-strips
    Helipads in 100 acres of land, to cater to
    limited domestic air traffic needs.

12
Salient Features of BMRDA Townships
  • Recreational facilities - Golf Course, Club
    houses, Malls.
  • BMRDA TOWNSHIPS are eco-friendly forest, lakes
    tanks, natural valleys, hillocks etc., are
    protected, preserved developed.
  • BMRDA TOWNSHIPS have wide internal road network,
    with power, water supply, sanitation, etc.
  • Speciality (a) Waste water recycling (b)
    Solid waste management.

13
Salient Features of BMRDA Townships
  • Bidadi, Ramanagar Sathanur townships located on
    southern Bangalore will have access to BMICP
    corridor through Bidadi, Ramanagara Channapatna
    interchange
  • BMRDA TOWNSHIPS have complete provision for
    health, education, tourism recreation.
  • BMRDA TOWNSHIPS are proposed in the limits of 85
    villages having 79,000 population. These villages
    will be adopted by BMRDA for integrated
    comprehensive development.

14
Salient Features of BMRDA Townships
  • BMRDA will also take up the integrated
    comprehensive development of towns located on BMR
    Ring Roads BMRDA Townships out of revenue
    generated from Townships Projects
  • Water Supply Rejuvenation of Tanks, Rainwater
    harvesting, Recycling
  • BWSSB would provide minimum per capita 70 lpd
    potable water. Additional requirements to be met
    by ground water / recycling.
  • Power Supply would be arranged by KPTCL

15
STRR,IRR,Radial Ring RoadBMRDATOWNSHIPS
16
BMRDA Townships Land proposed to be acquired
In Acres
Note- I Acre 4040 Sq. Mtrs
17
BMRDA Townships - Utilization of Land
  • 50 of the area is proposed to be utilized for
    open spaces and civic amenities like Roads,
    Parks, Playgrounds etc
  • Balance 50 of the area is proposed to be
    parceled out into large plots of 50 / 100 / 200
    acres etc for further development into
    residential / commercial industrial zones
    through multiple secondary developers

18
Approach
  • First project at Bidadi through bid route other
    projects through SPV Public Private Partnership
    mode
  • Lands would be acquired initially through KIADB
    later by BMRDA itself
  • Aim Development of integrated work live
    infrastructure and not merely creating plots
  • Master Plan to be prepared by Private Partner /
    SPV
  • BMRDA shall provide handholding assistance for
    obtaining the approvals of the various regulatory
    authorities

19
Approach
  • Thematic townships
  • Alternative modes of compensation to land losers
    would also be explored
  • The Private Partner shall finance develop the
    entire internal project infrastructure including
    for water and power supply
  • BMRDA shall provide external infrastructure
    including access roads, water power up to the
    periphery through BWSSB and KEB (KPTCL)
  • BMRDA shall provide bulk solid waste management
    facility outside the township

20
Approach
  • Selection of the Private Partner through open
    global tendering process
  • Foreign firms to participate either through an
    Indian subsidiary or through a JV/Consortium with
    Indian firms and would be subject to the relevant
    FDI norms/regulations
  • Private Partner shall welcome monitoring of
    project progress by BMRDA to ensure compliance
    with the project objectives
  • Project Implementation Period is expected to be 2
    years and Realisation Period, 5 years

21
Approach
  • BMRDA shall use the surplus generated from the
    Township Project for development of BMR Region
    through projects for -
  • Development of road / metro / mono rail networks
    etc
  • Development of the existing towns and villages
    falling within the project area and its immediate
    surroundings
  • Greening of the BMR

22
Phasing of the Projects
  • First Township at Bidadi
  • Ramanagara, Sathanur, Solur and Nandagudi to be
    takenup thereafter in phases

23
Thank You
Write a Comment
User Comments (0)
About PowerShow.com