TF Joint Operations Review Commissioning Plan - PowerPoint PPT Presentation

About This Presentation
Title:

TF Joint Operations Review Commissioning Plan

Description:

New. FISO. Joint. Res Meas. System. CAMAC. FISO. TF Joint Inst Rack. Top Voltage Probe Cable ... Modeling coefficients and protection limits will be iterated including ... – PowerPoint PPT presentation

Number of Views:41
Avg rating:3.0/5.0
Slides: 13
Provided by: charlesn4
Learn more at: https://nstx.pppl.gov
Category:

less

Transcript and Presenter's Notes

Title: TF Joint Operations Review Commissioning Plan


1
TF Joint Operations ReviewCommissioning Plan
  • Test Shots
  • Instrumentation
  • Benchmarking
  • C Neumeyer
  • 2/10/05

2
Shot List (Initial Phase to 4.5kG)
3
In-Plane Moments Corresponding to Bt Levels in
Shot List
Applied EM Load (Worst Case)
4.5kG
Mech Failure
2004 Run Worst Case
Moment at Joint Based on Analysis (Best Case)
Liftoff
4
In-Plane Pressures Corresponding to Bt Levels in
Shot List
Peak Pressure at Joint With No Support (Worst
Case)
4.5kG
Peak Pressure at Joint Based on Analysis (Best
Case)
5
Voltage Probes
  • Same as last run except 8 channels have AB
    monitoring
  • Allows monitoring of out-of-plane loading
  • Web page developed to archive probe vs. channel
    assignments (instead of reliance on notebook
    records)

6
Fiber Optic Temperature, Strain, and Displacement
  • Flags (inner, outer/top, bottom)
  • 4 flags x 3 strain/flag 12 strain
  • 4 flags x 1 temp/flag 4 temp
  • Hub and Flag twist angle (top, bottom)
  • 2 displacement
  • Flag end ?Z ?? motion (top, bottom)
  • 4 displacement
  • Hub (top only)
  • 1 displacement

New
Total 23 transducers
8 conditioner channels
FISO Technologies, Inc.
7
Top Voltage Probe Cable Tray 8 f/o extension
cables
TF Joint Inst Rack
FISO
FISO
Max 8 signals at a time from Top or bottom
Joint Res Meas System
CAMAC
Bottom Voltage Probe Cable Tray 8 f/o
extension cables
8
Fiber Optic Displacement Mounting
  • Monitor Flag End Motion Same As Last Time

9
Fiber Optic Displacement Mounting
  • Relocate Hub/Spline Twist on to Hub

Top Hub Plate Connections
10
Fiber Optic Displacement Mounting
  • Modify for ?Z ?? motion on a single flag
  • Extend over new insulating boots

11
Benchmarking Measurements
Info to be extracted from analysis
  • In addition, IP and OOP moments will be
    backed-out from voltage probe data for
    one-PF-at-a-time shots to benchmark against
    influence matrix generated from NASTRAN

12
Procedure
  • Initial phase will commission up to 4.5kG
  • Test shots will be conducted and data compared
    to predictions after each shot
  • Performance of system vs. predictions will be
    judged
  • Modeling coefficients and protection limits will
    be iterated including additional NASTRAN runs as
    necessary
  • Operating envelope will be adjusted accordingly
  • Later phase of commissioning toward 6kG will be
    performed at future date pending results at 4.5kG
    and when needed for NSTX research program