Title: TF Joint Operations Review Commissioning Plan
1TF Joint Operations ReviewCommissioning Plan
- Test Shots
- Instrumentation
- Benchmarking
2Shot List (Initial Phase to 4.5kG)
3In-Plane Moments Corresponding to Bt Levels in
Shot List
Applied EM Load (Worst Case)
4.5kG
Mech Failure
2004 Run Worst Case
Moment at Joint Based on Analysis (Best Case)
Liftoff
4In-Plane Pressures Corresponding to Bt Levels in
Shot List
Peak Pressure at Joint With No Support (Worst
Case)
4.5kG
Peak Pressure at Joint Based on Analysis (Best
Case)
5Voltage Probes
- Same as last run except 8 channels have AB
monitoring - Allows monitoring of out-of-plane loading
- Web page developed to archive probe vs. channel
assignments (instead of reliance on notebook
records)
6Fiber Optic Temperature, Strain, and Displacement
- Flags (inner, outer/top, bottom)
- 4 flags x 3 strain/flag 12 strain
- 4 flags x 1 temp/flag 4 temp
- Hub and Flag twist angle (top, bottom)
- 2 displacement
- Flag end ?Z ?? motion (top, bottom)
- 4 displacement
- Hub (top only)
- 1 displacement
New
Total 23 transducers
8 conditioner channels
FISO Technologies, Inc.
7Top Voltage Probe Cable Tray 8 f/o extension
cables
TF Joint Inst Rack
FISO
FISO
Max 8 signals at a time from Top or bottom
Joint Res Meas System
CAMAC
Bottom Voltage Probe Cable Tray 8 f/o
extension cables
8Fiber Optic Displacement Mounting
- Monitor Flag End Motion Same As Last Time
9Fiber Optic Displacement Mounting
- Relocate Hub/Spline Twist on to Hub
Top Hub Plate Connections
10Fiber Optic Displacement Mounting
- Modify for ?Z ?? motion on a single flag
- Extend over new insulating boots
11Benchmarking Measurements
Info to be extracted from analysis
- In addition, IP and OOP moments will be
backed-out from voltage probe data for
one-PF-at-a-time shots to benchmark against
influence matrix generated from NASTRAN
12Procedure
- Initial phase will commission up to 4.5kG
- Test shots will be conducted and data compared
to predictions after each shot - Performance of system vs. predictions will be
judged - Modeling coefficients and protection limits will
be iterated including additional NASTRAN runs as
necessary - Operating envelope will be adjusted accordingly
- Later phase of commissioning toward 6kG will be
performed at future date pending results at 4.5kG
and when needed for NSTX research program