DFS Update from the European Union - PowerPoint PPT Presentation

About This Presentation
Title:

DFS Update from the European Union

Description:

In the EU, EN 301 893 defines regulatory requirements for RLAN operation in the 5GHz band ... Philippe Tristant attended the Prague session ... – PowerPoint PPT presentation

Number of Views:53
Avg rating:3.0/5.0
Slides: 10
Provided by: RichKe1
Learn more at: https://www.ieee802.org
Category:

less

Transcript and Presenter's Notes

Title: DFS Update from the European Union


1
DFS Update from the European Union
  • Date 2008-3-18

Authors
2
Dynamic Frequency Selection
  • In the EU, EN 301 893 defines regulatory
    requirements for RLAN operation in the 5GHz band
  • DFS was devised to protect radar operating in
    that band
  • Radar and RLANs are co-equal users of the band
    (EU)
  • RLANs detecting radar patterns defined by 301 893
    must move to a clear channel
  • Weather radar signatures were not included in the
    initial (or second) version of DFS (v1.3.1 and
    v1.4.1)
  • The EU has started to receive interference
    complaints from the meteorological community
    (EUMETNET)

3
EU Weather Radar
  • EUMETNET Report to the Wi-Fi Alliance
  • Philippe Tristant attended the Prague session
  • Government weather radar needed to protect
    populace from serious weather conditions
  • Serious interference issues seen
  • Petitioned TCAM to help protect weather radar
  • TCAM decisions
  • Changes to EN 301 893 in phases
  • Immediate remedy for the radars banning RLANs
    from 5600 5650MHz band until new patterns,
    pulse detection becomes mandatory

4
EU Regulatory
  • The TCAM Committee
  • is the Telecommunication Conformity Assessment
    and Market Surveillance Committee
  • Role is defined within the Directive 1999/5/EC
    (RTTE)
  • See articles 13 to 15 of the Directive 1999/5/EC
  • Formal procedures article 5 provides for
    safeguards against shortcomings in standards.
  • The Commission (after opinion of TCAM) can
  • Withdraw standards
  • Interpret standards or give guidelines on the
    conditions under which they give presumption of
    conformity
  • Informal procedures try to manage issues through
    consensus
  • TCAM issues Opinions based on proposals made by
    the representative of the Commission (TCAM Chair)
  • Common understanding on the way forward

5
TCAM Decisions
  • Document TCAM24(24) from the EC
  • Meteo radars interfered by 5 GHz RLAN
  • EC concluded DFS has shortcomings
  • Industry need to address these before 5 GHz RLAN
    technology is suitable for mass market
    development
  • Staggered PRF
  • Narrower Pulses (0,8 µSec / 0,5 µSec)
  • Solution for noise calibration of weather radars
    (10 min CAC or equivalent)
  • only for the band 5600 - 5650 MHz
  • Other radars have comparable characteristics,
    hence Staggered PRF and Narrower Pulses should be
    applied across the whole band.
  • EC conclusions/proposals above endorsed by TCAM

6
DFS Changes
  • Now RLANs can not operate in the 5600 5650 MHz
    band
  • After 3/31/08 must meet EN 301 893 v1.3.1 or
    1.4.1 requirements
  • After 6/30/08 must be able to detect staggered
    PRF (3 PRF values) in 5600 - 5650 MHz band or
    block the band (channels 120, 124 and 128)
  • After 3/31/09 must also meet EN 301 893 v1.5.1
    requirements
  • Detect 0.8uS pulse width across 5250 5350 and
    5470 5725 MHz bands
  • Detect staggered PRF across 5250 5350 and 5470
    5725 MHz bands
  • Include a solution for weather radar noise
    calibration period (10 min CAC)
  • After 6/30/10 must meet EN 301 893 v1.6.1
  • All the 1.5.1 requirements
  • Detect 0.5uS pulse width across 5250 5350 and
    5470 5725 MHz bands

7
Proposed Relaxation of the CAC Requirement
  • Non-Continuous Off-Channel CAC (for all DFS
    channels)
  • as an alternative for the continuous CAC
  • Scheduled CAC for weather radar channels
  • Avoid the weather radar band at start up and do a
    CAC later on or do an Off-Channel CAC while
    operation has started on a channel outside
    5600-5650
  • CAC time for weather radar band
  • Full 10 min CAC (or equivalent Off-Channel CAC)
    only first time a channel in 5600-5650 MHz is
    being checked.
  • If no radar found, subsequent CAC checks should
    only be 60 sec

8
Proposed Relaxation of the CAC Requirement 2
  • Relaxation on the Uniform Spreading requirement
  • Use 60 of the available spectrum in stead of 80
  • Impact is lt 1.5 dB
  • Some applications do not require all channels and
    as such they should not be impacted by the 10 min
    CAC
  • Relaxation on the Channel Closing Transmission
    Time
  • Proposed 1 sec in stead of 260 mSec
  • required for mesh networking, other applications
    will not need this
  • DFS Threshold level
  • Threshold level as a function of the Power Density

9
Some Things We Can (Should) Do
  • TCAM has set the DOW for version 1.4.1 to 1 April
    2009
  • ETSI should progress the work with the objective
    to finish revision of EN 301 893 latest mid 2008
  • National voting processing time ETSI
    processing time EC gt 6 months
  • Publication in OJEC should be at least a few
    months prior to the DOW for version 1.4.1
  • Once ETSI has sent the new EN 301 893 into
    voting, industry should ask TCAM to revise the 1
    April 2009 date and move it e.g. to end of 2009
    or mid 2010
  • The EC is firm with regard to what should be
    included in version 1.5.1
  • So once we have done 1.5.1 as they requested, we
    believe we can get a relaxation on the time line
    to give industry more time to implement 1.5.1
    into their products
Write a Comment
User Comments (0)
About PowerShow.com