Description:

ONGC, Paradigm and Halliburton developed a software - Opslink (2003) ... URAN. Trombay. HAZIRA. Plant. Process. Complex. Process. Complex. Western Offshore Assets ... – PowerPoint PPT presentation

Number of Views:276
Avg rating:3.0/5.0
Slides: 21
Provided by: sham87
Category:

less

Transcript and Presenter's Notes

Title: ENERGISTICS STANDARDS IMPLEMENTATION IN ONGC STATUS


1
ENERGISTICS STANDARDS IMPLEMENTATION IN ONGC -
STATUS
2
WITSML IMPLEMENTATION
3
WITSML FOR REAL TIME OPERATION
4
WITSML FOR REAL TIME OPERATIONS
Well-site / platform
  • ONGC, Paradigm and Halliburton developed a
    software - Opslink (2003).
  • Interact Insite (2004 onwards)
  • LWD/MWD objects.
  • Used for Geo-steering in Mumbai High.

Visualization Center (VRC)
5
PANNA MUKTA TAPTI (PMT) PROJECT
6
PMT PROJECT
  • Introductory Meeting held in Kolkata in Jan 2006
    during SPG.
  • Attended by representatives from ONGC, BG
    Reliance.
  • It was decided to go ahead with the Pilot in PMT
    JV because of its multi-operators environment.

7
DATA OBJECTS
  • Data Objects for Stage-I (DrillingGG centric)
  • Log Object (MWD, LWD, Wireline)
  • Well / Wellbore object (well header information)
  • Trajectory object
  • Mud log object
  • Stage-II planned as Production centric


8
PMT PROJECT
  • Status
  • Developed Fields.
  • EOR/IOR Phase
  • Now changed idea to implement PRODML which was
    earlier planned in Stage II.

9
WITSML IN SCADA PROJECT
10
WITSML IN SCADA PROJECT
  • AN ENTERPRISE-WIDE SCADA (SUPERVISORY CONTROL AND
    DATA ACQUISITION) SYSTEM.
  • WITSML COMPLIANT SERVER.

11
SCADA THREE-TIER STRUCTURE
Corporate Data Center
TIER -3
Drilling SCADA at IDT
TIER -2
Offshore Asset Data Center
Onshore Asset Data Center
TIER -1
GGS
HAZIRA Plant
CPF
Process Complex
CTF
Typical On-shore Asset
Western Offshore Assets
12
THE CHALLENGE
13
SEAMLESS INTEGRATION OF SAP EPINET WITH SCADA

  • FROM WITSML COMPLIANT SCADA
  • TIME STAMPED DATA WILL FLOW INTO ICE-SAP FOR
    BUSINESS COMPUTATIONS.
  • THE E P DATA WILL FLOW TO EPINET.


14
Integrated SCADA-EPINET-ICE System
Managers for Business Information
Drilling, GG, Prod SCADA System
MIS Reports
1
Web portal
3
Capture Data
End Users
Third Eye, IIWS Collaborative Teams
Data Historian High Frequency Database
Manual entry
...
Transfer Decimated Data
Epinet Master Data
Well References
Validation Done at Assets, basins
Domain Experts
2
EPINET Team
Validate / QC
Export validated data in prescribed formats (
templates) to be loaded by the EPINET team
Data Loaders
(Lab, Institute etc.)
Data Transfer
Data Access by Users
15
Thank You
16
PWLS IMPLEMENTATION
17
PWLS IMPLEMENTATION IN FINDER IN EPINET
COMPOSITE LOG GENERATION (GEOFRAME)
ONLINE / OFFLINE STORAGE
ATTRIBUTE INFORMATION
LOG TAPES
COMPOSTE LOG MANAGEMENT PWLS STANDARDIZED (FINDER
)
ORIGINAL LOG MANAGEMENT (LOGDB)
TRANSCRIPTION (dlisu)
WEB BASED DATA DELIVERY
Composite Log Spliced Log
18
GEOPHYSICAL STANDARDS
19
GEOPHYSICAL STANDARDS
ONGCs initiative has led to creation of business
case for Geophysical SIG formation under
Energistics

20
Thank You