Title: CITY OF BELGRADE CITY ADMINISTRATION


1
  • CITY OF BELGRADE
    CITY ADMINISTRATION
  • SECRETARIAT OF SOCIAL AN CHILD PROTECTION
  • PROGRAM OF RESETTLING OF UNHYGIENIC SETTLEMENTS
    UNDER THE GAZELA BRIDGE
  • November, 2008.

2
Program of resettling of the unhygienic
settlements under the Gazela bridge
3
Program of resettling of the unhygienic
settlements under the Gazela bridge
  • THE CITY ASSEMBLY HAS ESTABLISHED A SOCIAL
    HOUSING INSTITUTE(4 MODELS)FOLLOWING THE
    SUGGESTION OF THE CITY ADMINISTRATION AS AN
    ACTION OF THE LOCAL GOVERNMENT TO SPECIFIC SOCIAL
    PROBLEMS OF THE CITIZENS
  • THIS DECISION IMPROVED THE EXISTING SYSTEM OF
    THE SOCIAL PROTECTION, ESPECIALLY OF THE
    MARGINALIZED SOCIAL GROUPS
  • (the poorest citizens ,youth with developmental
    challenges, parentless children and the Roma
    population)
  • ACTIVE INDIVIDUAL APPROACH TOWARDS PERSONAL
    SOCIAL POSITION IS BEING PROMOTED

4
Program of resettling of the unhygienic
settlements under the Gazela bridge
  • LEGAL FRAMEWORK OF SOCIAL HOUSING
  • DECISION OF THE CITY ASSEMBLY
  • INSTITUTE OF THE COMPETITION FOR HOUSING
    DISTRIBUTION
  • AGREEMENT ON SOCIAL HOUSING USAGE
  • PROGRAM OF RESETTLING GAZELA/action plan,
    Resettlement Board establishment,project
    activities

5
Program of resettling of the unhygienic
settlements under the Gazela bridge
  • Resettlement program is based on a minimum
    standard that needs to be achived (as defined in
    the Strategy)
  • Possession of personal documentation
  • Housing within community standards and basic
    equipment of the housing units
  • Regular income through legal employment
  • Education of children
  • Functional literacy and qualification obtaining
    for the adults
  • Health protection

6
Program of resettling of the unhygienic
settlements under the Gazela bridge
  • Steps towards the Program realization
  • Draft of the Action Plan (adopted by the
    authorities)
  • Defining the location ?vca vicinity
  • Obtaining necessary construction documentation,
    licenses, consents.
  • Records of the persons that will be included
    (lists- 2. category of the Gazela dwellers)
  • Support in obtaining personal documentation
  • Defining criteria (citizen of Serbia residing
    /settled on the territory of Belgrade,material
    status)
  • Making sure that the conditions were fulfilled
    before making the decision on resettlement
  • Activities on the level of sustainable
    implementation,integration and monitoring (Social
    and Child Protection Secretariat)

7
Program of resettling of the unhygienic
settlements under the Gazela bridge
  • PROJECT ACTIVITIES IN 2008 with the aim to
    prepare resettlement and integration support
  • 2 budget lines have been defined (tendering for
    the project selection) for the Roma population on
    the territory of Belgrade
  • In the field of educationpreparatory programs
    for school,obtaining qualification for employment
    - (4
    projects -2 million)
  • In the field of education, integration and social
    protection- (15projects- 6 million)

8
Program of resettling of the unhygienic
settlements under the Gazela bridge
  • Census from August 2007
  • (GCSR,Commission,Secretariat)
  • The total of 220 households have been covered by
    census, out of which
  • - 130 households(557 citizens of Serbia with
    residence on the territory of Belgrade)
  • - 90 households 429 with residence outside
    Belgrade).
  • Control census on November 20,2008
  • (GCSR,Commission,Secretariat)
  • The total of 110 households have been covered
    (465persons citizens of Serbia with residence on
    the territory of Belgrade and 56 households
    (citizens of Serbia with residence outside
    Belgrade).

9
Program of resettling of the unhygienic
settlements under the Gazela bridge
  • Budget for 2008-2009 allocated for the
    realization of the Resettlement Program
  • For housing estate and road construction, total
    of 159 million Serbian dinar in 2008
  • For NVO project realization total of 8 million
    in 2008
  • In 2009 total of 500 million Serbian dinars has
    been planned for
  • - housing estate and road construction
  • - equipment of housing units
  • - obtaining energy supply and other licenses,
    consents
  • 8,5 million has been planned for the NVO project
    realization in 2009

10
Program of resettling of the unhygienic
settlements under the Gazela bridge
  • Resettlement program- goals and expectations
  • Prevent exclusion and social isolation of the
    Roma population in Belgrade
  • Establish conditions for a stable way out and
    improved life from the poverty trap
  • Prevent generational poverty inheritance of the
    Roma population
  • Improve everyday life of the Roma population
  • Establish the model of resettling unsanitary
    settlements
  • Improve social policy and social protection on
    the territory of Belgrade

11
Program of resettling of the unhygienic
settlements under the Gazela bridge
  • The resettlement program covers
  • Handing over of the estate units to be used
  • Providing basic equipment for the households ( a
    stove smederevac,refrigerator with
    freezer,electronic cooker,dining table with
    chairs, beds with the matrices depending on the
    number of family members)
  • Social infrastructure in the settlement
  • City authority /Social and Child Protection
    Secretariat and other relevant institutions
    support in all the phases preparation and actual
    implementation and integration process

12
Program of resettling of the unhygienic
settlements under the Gazela bridge
  • Good practices
  • Involvement and coordination of all the relevant
    institutions and bodies
  • Clear criteria
  • Monitoring
  • Strengthen and stabilize the most needy
    population as civil society members
  • High sustainability
  • Implementations of the models set
  • Mobility of the legal solution
  • Transparency

13
Program of resettling of the unhygienic
settlements under the Gazela bridge
  • Media and communication
  • Media plan on Resettlement Program
  • Appointment of 1-2 people responsible for the
    communication with the media (press release,
    statements, visits to the settlements , etc.)
  • Appointment of people responsible for
    communication with the community members