Intergrated Corridor Management - PowerPoint PPT Presentation

1 / 14
About This Presentation
Title:

Intergrated Corridor Management

Description:

Actively measure throughput, productivity, connectivity, safety, and accessibility. ... EV routing. RMS Timing. CMS signing. CCTV control. Modify bus service ... – PowerPoint PPT presentation

Number of Views:56
Avg rating:3.0/5.0
Slides: 15
Provided by: pth
Category:

less

Transcript and Presenter's Notes

Title: Intergrated Corridor Management


1
Intergrated Corridor Management
  • The Natural Evolution

2
I-15 ICM Corridor Vision
  • To be managed collaboratively and cooperatively
    through Partnerships
  • San Diego Association of Governments (SANDAG),
  • California Department of Transportation
    (Caltrans),
  • Metropolitan Transit System (MTS),
  • North County Transit District (NCTD),
  • California Highway Patrol (CHP),
  • Cities of San Diego, Poway, and Escondido.

3
ICM Opportunities
  • Improve accessibility for corridor travelers to
    travel options
  • Safety record shall be enhanced
  • Informational tools available to make smart
    travel choices
  • Institutional partners shall employ an integrated
    approach to resolve problems
  • Networks shall be managed holistically under both
    normal operating and incident/event conditions

4
Regional Project Goals
  • Institutional
  • To facilitate enhanced mobility.
  • Operate / Manage across disciplines /
    jurisdictions
  • Operational
  • Actively measure throughput, productivity,
    connectivity, safety, and accessibility.
  • Provide seamless and convenient shifts based on
    real-time predictive capabilities.
  • Technical
  • Enhance existing interoperability between field
    and functional environments.

5
Why ICM?
  • Accelerate SANDAG RTP Corridor Planning efforts
  • Historically, operational focus has been on the
    optimization of individual networks
  • Limited capability to respond to demand from
    other networks
  • Philosophy to operate and optimize the entire
    system as opposed to the individual network

6
Why I-15?
  • Primary artery from inland northern San Diego
    County to downtown San Diego.
  • Serves a growing number of interregional trips.
  • I-15 Managed Lanes System
  • Multi Institutional Cooperation/Partnerships
  • Multi-modal Transportation Improvement Strategies
    - BRT

7
I-15 Managed Lanes BRT
  • BLANK

8
User Needs
  • Real-Time Data
  • Share and exchange data
  • Monitor conditions and report on status
  • Make available to the general public
  • Manage corridor traffic flow
  • Manage occurrence of events
  • Coordinate operations and systems

9
I-15 ICM System Subsystem Hierarchy
10
I-15 Current Efforts
  • Draft Requirements Due Dec. 20, 2007
  • Final Requirements Due March 2008

11
ICM System
12
Questions
13
Corridor Overview
  • Southbound Bottlenecks (AM) Average Delay in
    Vehicle Hrs/Day

14
Corridor Overview
  • Northbound Bottlenecks (PM) Average Delay in
    Vehicle Hrs/Day
Write a Comment
User Comments (0)
About PowerShow.com