Title: PolyTriplex Technologies, Inc.
1INTRODUCING the Poly-Triplex Liner System
2Poly-Triplex
- The most cost effective, long-term solution for
manhole and pump station rehabilitation in the
industry
3Our Company
- Poly-Triplex is committed to safe work
environment, all employees are OSHA trained to
industry standards - Poly-Triplex Technologies focuses solely on
developing economical and permanent solutions
for utility problems. - Sixty-three (63) U.S. patent claims are granted
on the Poly-Triplex product and its installation
process. - Our patented Poly-Triplex Liner System utilizes
the latest trenchless technologies - Poly-Triplex Technologies maintains
relationships with licensed installers. These
contractors are located throughout the United
States and Canada.
4Poly-Triplex Liner System
- TRIPLE LAYER SYSTEM
- Layer 1 fiberglass
- Layer 2 non-porous Felt/PVC membrane
- Layer 3 fiberglass
5The Poly-Triplex Solution
Problem
Solution
6Problems
Exfiltration
Infiltration
Location
Corrosion
7The Poly-TriplexRehabilitation Process
8Structures are prepared for Rehabiltation
- Atmosphere is tested and documented to verify a
safe confined space entry - Active infiltration is stopped using chemical
grout and or hydraulic cement - Benches and inverts are rebuilt if needed
- Trunk lines and incoming laterals are smoothed
- Steps are removed
9Structures are precisely measured to insure a
perfect fit
10Poly-Triplex Liners are Custom Made for Every
Structure
- 20,000 square foot manufacturing facility
11Liner is saturated onsite with a two-part 100
solids epoxy resin
12Liner is lowered into the structure
13 Liner is cured using air pressure and steam
injection
14 After curing the inflation bladder is removed
15Structure Permanently Restored
16Installation process is documented
17Result Infiltration Stopped
18Result Gas Deterioration Stopped
19Result Exfiltration Stopped
20Poly-Triplex reduces treatment cost by
eliminating II
Based on 1.50 per 1000 gallons
21 Superior Longevity
22Highest Value SolutionCost Per Year of Life
This analysis is based on a typical sewer manhole
of average depth with infiltration and
deterioration problems. Poly-Triplex Liners are
suitable for both horizontal and vertical
structures in sewer and stormwater collection
systems.
Notes Assumes a certain number of man-hours _at_
prevailing wages. Adds Product and
installation costs and divides it by product life.
23Product Comparison
24Installations for over 400 municipalities
nationwide
25The Best Warranty in the Industry
- 10-Year Materials Warranty
- 5-Year Labor Warranty
- Provided by Manufacturer and Installer
26Case Study Washington, DC
- Date of Installation JUNE 1993
- Date of Inspection AUGUST 2004
- Inspection Notes No infiltration or
deterioration observed
11 YEAR OLD LINING
27Case Study - Loveland, CO
Boyd Lake Pump Station
6' diameter and 20' deep with severe infiltration
at approximately 40. The city could not replace
the pump station due to it's proximity to the
lake. The successful rehabilitation was
completed during active infiltration.
28Fulton County, GA
Poly-Triplex Liners are being installed in Fulton
County, GA where sewer rehabilitation is
occurring and will continue for years.
Preliminary Site Conditions 27 deep manhole in
critical condition with serious infiltration
Poly-Triplex Liner System completely and
permanently restores manhole structure in one day.
29The Poly-Triplex Solution
- Design Life in Excess of 50 Years
- 100-Year Service Life Certification
- Can be installed in any Shape or Configuration
- Eliminates Further Corrosion and Deterioration
- Eliminates Inflow and Infiltration
- Restores Structural Integrity
- Ideal for Both Rehabilitation and New
Construction - 10-Year Manufacturer and Installation Warranty
- Fix Caps