Title: Lecture no 24: Asset management


1
Lecture no 24 Asset management
TDT4285 Planlegging og drift av
IT-systemer Spring 2009 Anders Christensen, IDI
2
Given an invoice ...
  • Revision how was the money spent?
  • Documentation show that the equipment is your
    own.

Auditor Economy
Invoice
Equipment
Theft Reuse Warranty
3
Challenges
  • Which equipment is specified on an invoice?
  • Where is all the equipment?
  • Which equipment has been repaired?
  • What is the expected life-time of equipment?
  • What is currently lent out/under repair?
  • Who is responsible for which equipment?
  • Which equipment is not in use?

4
Lifetime cycle for equipment
Offer
Transport
Decommission
Order
Repair
De-installation
Delivery
Installation
Usage
Phase out
5
Means to maintain overview
  • Network card from switches
  • Bar codes on all units
  • Serial numbers for all components
  • Acid/hot iron marks against theft
  • Inventory automatically collected
  • Databases manually updated
  • Electronically from RF etc

6
Importent to know
  • What is the typically cost for different types of
    equipment (and users)?
  • What is the fault rate for types of equipment
  • How does this fault rate develop over time?
  • Which equipment can be reused?
  • How much of the equipment is overkill?
  • Do we have the right number of licenses?

7
Total cost of ownership (TCO)
  • Price over lifetime
  • Personnel costs
  • Purchase costs
  • Overcapacity
  • Paper, ink, etc
  • HW upgrades
  • SW upgrades
  • Network costs
  • Server costs
  • Power and A/C
  • Training
  • Adm overhead
  • Ergonomic costs
  • Building costs

8
Examples of TCO
  • Typical org 7251 pr desktop pr year Kauffman
  • Highest 12-15.000 pr year (analysts in finance
    and currency trade) Kauffman
  • NTNU NOK 8-12.000 pr year

9
Warranty
Length of the warranty period? Only relevant or
all usage? Who decides if it is a
warranty? Warranty vs production error How do
they respond to a report? Who pays for
transport Replacement quipment? On site warranty?
Buyer
Seller
Warranty
Distributor
Warranty
Importer
Warranty
What happens if one of this goes broke?
Producer
Warranty
10
Decommissioning of equipment
  • Selling equipment can be expensive!
  • Responsibility of warranty
  • Billing costs
  • Announcements
  • Computer equipment is special waste
  • Most equipment is marked!
  • Price X per ton (?)
  • May contain sensitive data

11
Storage of spare parts
  • Everything going in or out must be registered
  • Remove all defect parts
  • Minimize the size of the storage
  • If old parts are put into the storage, they
    should be tested
  • Let the storage have a supreme dictator
  • Dont let a spare part storage become a
    repacement for warranties.

12
Information wrt to purchaces
  • All contact with the user
  • Offers (perferably several)
  • Order (written)
  • Order confirmation incl delivery date
  • Transport papers
  • Packing order verify!
  • All serial numbers etc
  • Invoice
  • Repairs etc when in use.

13
... Do not forget ...
  • Mercantile keypoints
  • Transport
  • Extra costs
  • Custom
  • Sales tax (!)
  • Environment tax
  • Billing costs
  • Your reference no
  • Technical keypoints
  • Cables
  • Batteries
  • Paper, ink etc
  • Distr.media
  • Documentation
  • Empty media
  • Maint. agreements

14
Salesmen and other strange animals
  • They will
  • Exploit your courtesy
  • Make their own cost impenetrable
  • Put much energy into closing the sale
  • Often represent a long delivery chain
  • Always be willing to sell
  • Be dangerous if they change employer too often

15
Trip wires INCO-terms
  • EXW ex works
  • FCA free carrier
  • FAS free alongside ship
  • FOB free on bord
  • CFR cost and freight
  • CIF cost, insurance and freight
  • CPT cost paid to
  • CIP cost and insurance paid to
  • DAF delivered at frontier
  • DES delivered ex ship
  • DEQ delivered ex quai
  • DDU delivered duty unpaid
  • DDP delivered duty paid

Where? Insurance? Transport? Responsibility? Owner
ship? Risk?
16
Models for PC purchase
  • Subscribe to equipment from one producer,
    whatever that is.
  • Buy prebuilt PCs with standard third part
    components.
  • Buy parts and build the PCs yourself
  • Buy PCs from whomever is the cheapest in town
    that day.
  • Out-source the whole problem.

17
How to make pricing impenetrable
  • Bundling of extra goods, like courses, support,
    training, installation etc
  • Extra costs for e.g. transport
  • Sales tax included or not?
  • Dragging out delivery forever
  • Non-existent advantages that youll never take
    advantage of anyway
  • Peculiar ways of paying

18
Warranties
  • Have a clear understanding of the conditions from
    the start
  • Have order in your papers
  • Demand proper support
  • If you send in or hand of anything get a
    receipt
  • Time them and log it!
  • Know which equipment that out-of-house due to
    warranty
  • Escalate systematic faults