Assessing the Feasibility of Pico Hydro Technology on TESC - PowerPoint PPT Presentation

1 / 12
About This Presentation
Title:

Assessing the Feasibility of Pico Hydro Technology on TESC

Description:

Assessing the Feasibility of Pico Hydro Technology on TESC. Kate Fabian, Asa Hurst, Jon Shimazu. Objective/Motivation. Hydroelectric Power is very clean on small ... – PowerPoint PPT presentation

Number of Views:397
Avg rating:3.0/5.0
Slides: 13
Provided by: rooki
Category:

less

Transcript and Presenter's Notes

Title: Assessing the Feasibility of Pico Hydro Technology on TESC


1
Assessing the Feasibility of Pico Hydro
Technology on TESC
  • Kate Fabian,
  • Asa Hurst,
  • Jon Shimazu

2
Objective/Motivation
  • Hydroelectric Power is very clean on small scales
  • Pacific NW Lots of water
  • Measure the flow of the stream to estimate the
    available hydroelectric power

3
Stream Flow Measurements
  • Materials
  • Stopwatch
  • Current Meters
  • Measuring Tape
  • Boots

4
Procedure
  • Determine evaluation sites
  • Tried 3 points along the stream, decided on one
  • Take Recordings
  • Width (m)
  • Depth (m)
  • Flow Rate (m/s)
  • Water Head (m)
  • Analyze Data
  • Volumetric Flow (m3/s)
  • Determine Kinetic Energy
  • Determine Gravitational Potential Energy

5
Site Locations
6
The Culvert
7
Data Power by Time
8
Uncertainties and Compensation
  • Equipment limitations
  • Variations in Current Measurements
  • Coordinating readings with stopwatch
  • Reducing Human Error
  • Multiple readings
  • Timing announcements

9
Harvesting Methods
Run of the River Penstock
10
Power Generation and Cost
  • Run-of-the-River Pico hydro
  • Penstock 1000 W, 10,000

11
Parallel Axis
  • Commonly used on large scales
  • Efficient up to 90 (on large scales)?
  • Expensive, hard to fabricate, especially on small
    scales

12
Ecological Concerns
  • Turbidity, Suspended Matter
  • Oxygen Levels
  • Diverting Stream Water
  • Physical Barriers
Write a Comment
User Comments (0)
About PowerShow.com