SCM ISSUES IN WEST AFRICA LOCAL CONTENT DEVELOPMENT - PowerPoint PPT Presentation

1 / 16
About This Presentation
Title:

SCM ISSUES IN WEST AFRICA LOCAL CONTENT DEVELOPMENT

Description:

40% of ACERGY worldwide activity : circa 750 MUSD in 2005. ... APL offloading Buoy. 13. seabed-to-surface. Subsea UK June 1st 2006 ... – PowerPoint PPT presentation

Number of Views:54
Avg rating:3.0/5.0
Slides: 17
Provided by: rdu
Category:

less

Transcript and Presenter's Notes

Title: SCM ISSUES IN WEST AFRICA LOCAL CONTENT DEVELOPMENT


1
SCM ISSUES IN WEST AFRICALOCAL CONTENT
DEVELOPMENT
JUNE 2006
2
What we do
SURF Conventional Trunklines
IMR
3
Africa Mediterranean Countries of operation
  • 40 of ACERGY worldwide activity circa 750 MUSD
    in 2005.
  • 45 of which is related to procurement of
    Projects 350 MUSD
  • 450 MUSD foreseen in 2006 2007.
  • Projects in the Gulf of Guinea
  • Nigeria
  • Angola
  • Equatorial Guinea
  • Congo

Regional permanent implantation in Angola,
Nigeria and Gabon.
4
SCM Issues 1/2
Logistic
Delivery on site
Engineering
Installation
Fabrication
Transport
Customs
  • Weak and critical point
  • Risky
  • Remote environment
  • Uncontrolled planning

5
SCM Issues 2/2
  • How to succeed the installation ?
  • Engineering - over design gt secure
    installation and in service life
  • Fabrication - zero default gt high QA/QC
    capabilities
  • How to succeed the delivery on site ?
  • Ensure good structure for logistics
  • - Availability of transport (flexible planning)
  • - Very good knowledge of local regulations which
    are constantly changing
  • - Strong set up and full control of local
    logistics from shore to site.

6
West African Top Priority Local Content
Constraint but also an Opportunity
Transport
Customs
Delivery on site
Installation
Fabrication
Engineering
  • 1. Constraint
  • Access to local Human Resources
  • - Engineers (Engineering)
  • - Workers (Fabrication)
  • Control of Quality
  • 2. Opportunity
  • Transport and Customs are cleared Upstream
  • - Improve Float on planning
  • - Less complex nature of goods to import.

7
West Africa A region with high Country
Specifics
Pipe fabrication (Steel mill)
high
CAPEX \ Investment
Yard long-product base (Jacket-piles /double
joint)
low
low
high
Technology / Complexity
8
SOME LOCAL REALISATIONS
9
Nigeria Warri Yard Angola Lobito Yard
10
HRT in Lobito
11
Manifolds in Lobito
12
APL offloading Buoy
13
YOKRI Deck fabrication in Warri
14
Warri Fabrication Yard Jacket - Suction Piles
15
Warri Fabrication Yard Jacket - Suction Piles
16
Conclusion
  • Common objective for main Contractors and
    Suppliers
  • - Localisation in country with guaranteed quality
    and delivery
  • Strong and relationship / partnership required