Title: What It


1
Multimodal Integrated Corridor Management
What Its All About
2
More Than CSMPs
3
Overview
  • CSMP Background How We Got Here
  • CSMP Status Where We Are
  • The Challenge Ahead What It Takes To Get Where
    We Need To Be

4
(No Transcript)
5
GMs FUTURAMA Stretching the Horizon
6
(No Transcript)
7
(No Transcript)
8
(No Transcript)
9
(No Transcript)
10
(No Transcript)
11
(No Transcript)
12
(No Transcript)
13
(No Transcript)
14
42 Mile Loop
15
1971
16
(No Transcript)
17
District 7 TMC
18
District 7 New TMC
19
(No Transcript)
20
(No Transcript)
21
Beware CSMPs Ahead
22
AASHTO Summits
  • Conducted congestion summits in cooperation with
    the four regional AASHTO meetings.
  • Identified innovative strategies and initiatives
    that states were adopting for dealing with the
    congestion challenge
  • To learn from one another about what was
    possible, and how state DOT leadership could make
    a difference in improving transportation system
    performance

23
(No Transcript)
24
Summit Themes
  • There is no Single Solution
  • Performance Measurement is a Key to Overcoming
    Limited Resources
  • The Extent of the Congestion Challenge Goes
    Beyond One Jurisdictions Boundaries and Requires
    Collaboration

25
Performance Poetry
  • How can you manage if you dont know whats
    happening
  • How can you show people what to invest in if they
    cant visualize that return on investment
  • How do you challenge people to improve without a
    vision

26
Background
  • CSMPs High Octane System Planning
  • Caltrans The Mobility Company
  • New Tools Performance, Simulation, and more

27
Corridor Management Plans
CMP
28
Plan Components
Ongoing
29
Modern Metrics
Performance
30
Arterial network
  • 40 miles of arterials
  • Approximately 250 signalized intersections
  • 12 major connectors to I-880 Freeway
  • Traffic signals controlled and maintained by
    respective local agencies
  • Different signal control systems

31
Development Milestones
  • Corridor definition
  • Stakeholder team
  • Preliminary performance assessment
  • Detection in place
  • Comprehensive performance assessment
  • Identify causes of congestion
  • Test improvement scenarios
  • Prioritize recommendations

32
(No Transcript)
33
CSMP Status
  • 26 Corridors Underway
  • 7 Detection Projects Moving
  • Primitive Stage
  • January Meeting to Determine Future Direction

34
The Challenge
  • What are we really going to do
  • When
  • Concept of Operations
  • Managing Across Modes, Jurisdictions Strategies

35
What Does It Mean To Manage
  • Building a House vs Managing a Home
  • Integrate vs Co-ordinate
  • Soviet Collectives Revisited

36
More Active Management