NANOOSE BAY ESTUARY - PowerPoint PPT Presentation

1 / 13
About This Presentation
Title:

NANOOSE BAY ESTUARY

Description:

... had been issued to prohibit the proponent from dumping more fill when in fact ... taken by DFO was to have the proponent conduct an assessment of the amount and ... – PowerPoint PPT presentation

Number of Views:44
Avg rating:3.0/5.0
Slides: 14
Provided by: johnwe95
Category:

less

Transcript and Presenter's Notes

Title: NANOOSE BAY ESTUARY


1
(No Transcript)
2
(No Transcript)
3
(No Transcript)
4
NANOOSE BAY ESTUARY
  • By this time (June 2006) DFO had been notified
    several times by local citizens and the DSF, No
    action was taken.
  • DFO simply claimed this one fell through the
    cracks
  • DSF was advised that the project had been
    approved by the Regional District of Nanaimo and
    DFO was not notified (as it was supposed to be
    under DFO/RDN MOU)

5
NANOOSE BAY ESTUARY
  • DFO wrongly advised DSF that Inspectors
    Directions had been issued to prohibit the
    proponent from dumping more fill when in fact no
    such action had been taken
  • The only action taken by DFO was to have the
    proponent conduct an assessment of the amount and
    type of habitat that might have been lost and put
    together some sort of mitigation/compensation plan

6
NANOOSE BAY ESTUARY
  • Meanwhile, DFO was advised by DSF in October,
    2006 of the existence of a report prepared in
    June, 2006 by an environmental consultant for the
    Regional District of Nanaimo
  • That consultant recommended at that time that the
    proposed house building on the estuary lands be
    halted, the house footprint be moved and the
    already disturbed areas be rehabilitated
  • RDN did nothing to change the project

7
NANOOSE BAY ESTUARY
  • The impact assessment/compensation report that
    DFO requested that the proponent complete
    (according to local DFO officials the request was
    made in June 2006) was not submitted to DFO until
    July 2007!!!
  • Meanwhile the house construction went on to
    completion with no changes whatsoever to the
    project design to minimize habitat loss.
  • Here is the outcome (situation as of October
    2007))

8
(No Transcript)
9
(No Transcript)
10
(No Transcript)
11
(No Transcript)
12
(No Transcript)
13
(No Transcript)
Write a Comment
User Comments (0)
About PowerShow.com