Title: Results: Design Review


1
Results Design Review 3
2
Student Ranking of Products
  • Windrusher
  • Paws Desk Set
  • Rotating Logo
  • Desk Clock
  • Old Main
  • Lion Bank

3
Observations of the faculty
  • each group is strongly committed to their product
    (most voted it highest)
  • some redesign is needed for all the products
  • redesign could significantly affect
    marketability, cost
  • Conclusion
  • we will prototype all 6 products
  • we will select 3-4 for production at the end of
    the semester

4
Whats next?
  • comments on the designs
  • students please add your suggestions!
  • tasks for the rest of the semester

5
Windrusher
  • needs a mounting that allows it to rotate (direct
    the wheel into the wind)
  • plan for a family of products
  • different sizes
  • team colors, etc.

6
Paws Deskset
  • develop a plan to customize the product in some
    way
  • create 2 versions
  • clock LCD insert
  • PSU trivia LCD insert (could reprogram)

7
Old Main Clock
  • reduce size, especially depth
  • eliminate safe (space constraints)
  • instead, make in pieces that assemble maybe
    even come apart
  • add more detail to the front facade
  • much more design work needed in clock/cuckoo
    mechanism
  • should run using one clock, not two

8
Lion Bank
  • identify another material besides hydrostone
    (ceramic, etc.)
  • much more design work is needed for electronics
    not shown in last presentation

9
Acrylic Clock
  • aesthetics need work redo shape and size of
    backing
  • clock is too small for size of product
  • engrave PSU scenes on backing

10
Rotating Logo
  • develop a 3D logo to replace existing 2½ D logo
  • scale product down close to snow globe size

11
Tasks remaining
  • design revision
  • process selection
  • design for manufacturability
  • CAD model (2D or 3D)
  • obtain materials and parts
  • manufacture 1 working product

12
Time remaining
  • 7 weeks!
  • develop a schedule for tasks
  • subtask, responsible person, due date
  • we will cover MS project (schedule management)
    next class