KY MUG An Overview of Post Processing Routines - PowerPoint PPT Presentation

1 / 15
About This Presentation
Title:

KY MUG An Overview of Post Processing Routines

Description:

Total Lane Miles, Directional System Miles. Average Link Length Using System Miles ... Air Quality Analysis. VMT by HPMS functional class. Tabulate by Functional Class ... – PowerPoint PPT presentation

Number of Views:57
Avg rating:3.0/5.0
Slides: 16
Provided by: TCG2
Category:

less

Transcript and Presenter's Notes

Title: KY MUG An Overview of Post Processing Routines


1
KY MUGAn Overview of Post Processing Routines
  • The Corradino Group
  • February 25, 2005

2
Topics
  • What is a post-processor?
  • How are they implemented?
  • Examples

3
What is a Post-Processor?
  • A script or procedure that uses model results and
    other data or procedures to develop additional
    data and analyses that the model itself cannot
    produce.

4
How Are They Implemented?
  • Program as a GISDK Script
  • Integrate with external procedures
  • Use a database reporting program like Crystal
    Reports

5
Examples
  • Highway Evaluation
  • Root-mean-square error
  • Cost estimation and forecasting
  • Air quality

6
Highway Evaluation
  • Number of Links and Percentages
  • Percentage of Links with Counts
  • Total Lane Miles, Directional System Miles
  • Average Link Length Using System Miles
  • Total VMT, VHT and Loads Using Volumes on Links
    With Counts
  • Ratio of Volume Over Count VMT, VHT and Loads
  • Total Volume on All Links

7
Highway Evaluation (cont.)
  • Volume Percentages on All Links
  • Average Total Volumes on All Links
  • Total VMT and VHT for All Links Using Volumes
  • Original and Congested SPEEDS (MPH) and Percent
    Change
  • Screenline Summaries

8
Highway EvaluationSystemwide
  • Number of Links
  • System Miles
  • Lane Miles
  • Directional Miles
  • VMT Using Volumes
  • VMT Using Counts
  • VMT V/C

9
Highway EvaluationSystemwide (cont.)
  • VHT Using Volumes
  • VHT Using Counts
  • VHT V/C
  • Volumes All Links
  • VMT All Links
  • VHT All Links
  • Original Speed (mph)
  • Congested Speed (mph)
  • Average Total Volume

10
Report of Screenlines
11
Root-Mean-Square Error
  • RMSE 34.616 FOR COUNT RANGE 0. TO
    5000. 45 - 55
  • RMSE 23.946 FOR COUNT RANGE 5000. TO
    10000. 35 - 45
  • RMSE 22.541 FOR COUNT RANGE 10000. TO
    20000. 27 - 35
  • RMSE 19.812 FOR COUNT RANGE 20000. TO
    30000. 24 - 27
  • RMSE 25.878 FOR COUNT RANGE 0. TO
    400000. 32 39

12
Evaluation Routines
  • Percent Root-mean-square error
  • By volume group
  • By roadway type
  • VMT ratio by AT, FT
  • HPMS observed VMT.

13
Count Estimation and Factoring
  • TransCAD ODME
  • Factor by modeled growth
  • Process to wash-out model error.
  • Typical Estimated Counts at RMSE lt15
  • Apply model growth to estimated counts for
    project level traffic
  • Counts must be consistent
  • Doesnt work for new roads on new alignment

14
Air Quality Analysis
  • VMT by HPMS functional class
  • Tabulate by Functional Class
  • Length load VMT
  • Some processes also estimate speed.

15
QUESTIONS?
  • ?
Write a Comment
User Comments (0)
About PowerShow.com